{"id":18999,"date":"2025-10-21T14:22:07","date_gmt":"2025-10-21T12:22:07","guid":{"rendered":"https:\/\/www.darda.de\/drilling-drive-unit"},"modified":"2026-03-28T16:55:04","modified_gmt":"2026-03-28T15:55:04","slug":"drilling-drive-unit","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit","title":{"rendered":"Drilling drive unit"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A drilling drive unit is the heart of any drilling application in concrete and rock. It converts available energy &#8211; most commonly hydraulic, but also electric or pneumatic &#8211; into rotational motion with controllable torque. In deconstruction, strip-out, tunnel and rock construction, and natural stone extraction, the right drilling drive unit determines whether core drilling, anchor drilling, or hole arrays are executed efficiently, safely, and in a material-appropriate manner. Especially in conjunction with <strong>stone and concrete splitting equipment<\/strong> as well as <strong>concrete demolition shears<\/strong>, the drilling drive unit plays a central role because it creates the necessary preparatory boreholes for splitting, cutting, or controlled removal. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs from Darda<\/a> GmbH provide a robust power source for this and enable compact, mobile work on the construction site. As a compact <em>drilling motor<\/em>, it links power supply, feed system, and tooling into a reproducible, low-vibration drilling process.<\/p>\n<h2>Definition: What is a drilling drive unit?<\/h2>\n<p>A drilling drive unit is the drive assembly that powers drilling tools such as core bits, drill bits, or diamond core barrels at a defined speed and torque. Depending on the method, the drive can operate purely in rotation (rotary drilling\/core drilling) or combine rotation with impact pulses (percussion drilling). Key parameters of a drilling drive unit include power input, torque curve, speed range, feed control, tool interface, and the option to supply flushing or cooling media (water\/air). In construction and deconstruction, the drilling drive unit is used to produce openings, breakthroughs, anchor points, hole arrays, or relief boreholes in concrete, reinforced concrete, and rock &#8211; often as a preparatory step for downstream procedures such as splitting, cutting, or shear work.<\/p>\n<h2>Function and design of a drilling drive unit<\/h2>\n<p>A drilling drive unit converts supplied energy into rotational tool motion. Core components are the drive motor (hydraulic, electric, or pneumatic), gearbox (ratio for torque\/speed), tool interface (e.g., threaded or quick coupler systems), speed and torque control, and interfaces for flushing and cooling systems. In hydraulic drilling drive units, flow rate and pressure &#8211; provided by <strong>hydraulic power packs<\/strong> &#8211; determine the available power. The force is transmitted via hose lines to the motor, which drives the tool smoothly. An active feed unit (manual, stand-mounted, or robotic) ensures constant contact pressure, which largely determines drilling performance, tool life, and borehole quality. Closed-loop speed control and stall protection further stabilize the cut and protect tools in heterogeneous materials.<\/p>\n<h3>Components at a glance<\/h3>\n<ul>\n<li><em>Drive unit<\/em>: Hydraulic motor or electric motor with a high-torque characteristic.<\/li>\n<li><em>Gearbox<\/em>: Matching the drilling diameter and material; high reduction for large diameters.<\/li>\n<li><em>Tool interface<\/em>: Compatible with core bits and drill bits (e.g., threaded connections for core barrels).<\/li>\n<li><em>Feed<\/em>: Hand-held, stand-mounted, or carrier machine; uniform feed protects tool and material.<\/li>\n<li><em>Flushing\/cooling system<\/em>: Water for diamond core drilling, air or dust extraction for dry drilling.<\/li>\n<li><em>Safety functions<\/em>: Torque limiter, emergency stop, ergonomic handles to control reaction torque.<\/li>\n<\/ul>\n<h3>Integration and interfaces<\/h3>\n<ul>\n<li><strong>Power connection<\/strong>: Clearly defined hydraulic flow\/pressure or electric supply rating for stable output.<\/li>\n<li><strong>Control options<\/strong>: Mechanical or electronic speed control, optional remote operation for confined or hazardous areas.<\/li>\n<li><strong>Mounting points<\/strong>: Rigid interfaces for stands and guides minimize runout and improve bore straightness.<\/li>\n<\/ul>\n<h2>Designs and drive types<\/h2>\n<p>The choice of drive type depends on location, material, and the process chain. Hydraulic drilling drive units are established in heavy concrete demolition and rock construction because they deliver high torque in a compact form and can be combined with the <strong>hydraulic power packs<\/strong> of Darda GmbH. Electric drives are flexible for interior applications where sufficient power supply is available; pneumatic solutions excel in ATEX zones and in high humidity. Noise-sensitive environments benefit from well-damped hydraulic systems, while long hose or cable runs require attention to pressure drop and voltage stability.<\/p>\n<h3>Rotary drilling, core drilling, and percussion drilling<\/h3>\n<ul>\n<li><strong>Core drilling (wet\/dry)<\/strong>: Rotational method with diamond tools for precise openings, breakthroughs, and core sampling.<\/li>\n<li><strong>Rotary drilling<\/strong>: With carbide drill bits for anchor, dowel, and pilot holes; suitable for hole arrays.<\/li>\n<li><strong>Percussion drilling<\/strong>: Combination of rotation and axial impacts for faster penetration in brittle rock or hard concrete.<\/li>\n<\/ul>\n<h2>Application areas and process chains in deconstruction<\/h2>\n<p>Drilling drive units are an integral part of many process chains in the application areas of Darda GmbH: <strong>concrete demolition and special demolition<\/strong>, <strong>strip-out and cutting<\/strong>, <strong>rock excavation and tunnel construction<\/strong>, <strong>natural stone extraction<\/strong>, and <strong>special applications<\/strong>. The drillings prepare targeted separation and splitting operations, create defined engagement points for shears, enable anchor installation, and facilitate the controlled disassembly of components. Robust, repeatable drilling sequences reduce rework and synchronize cleanly with splitting and shearing stages.<\/p>\n<h3>Practical examples<\/h3>\n<ul>\n<li><em>Concrete demolition and special demolition<\/em>: Core drilling for breakthroughs; hole arrays for subsequent splitting; anchor drilling to secure components before deploying <strong>concrete demolition shears<\/strong> or <strong>combination shears<\/strong>.<\/li>\n<li><em>Strip-out and cutting<\/em>: Starter holes as starting points for cut edges; mounting holes for guide rails and anchorage points that structure work with <strong>Multi Cutters<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel Shears<\/a><\/strong>.<\/li>\n<li><em>Rock excavation and tunnel construction<\/em>: Borehole fields in rock for controlled volume reduction and for inserting splitting tools or anchors.<\/li>\n<li><em>Natural stone extraction<\/em>: Series of holes along natural joints; preparation for the use of <strong>hydraulic wedge splitters<\/strong>.<\/li>\n<li><em>Special applications<\/em>: Technical openings, relief boreholes, or attachment points, for example before working with <strong>cutting torch<\/strong> systems on tanks under an appropriate safety concept.<\/li>\n<\/ul>\n<h2>The drilling drive unit as a key for stone and concrete splitters<\/h2>\n<p>When splitting concrete and natural stone, precise boreholes are generally required to insert <strong>hydraulic wedge splitters<\/strong>. The drilling drive unit defines the quality of the splitting result: position, diameter, depth, and straightness of the drillings determine crack propagation and the repeatability of the splitting operation. Hydraulic drilling drive units with high torque and a stand-mounted feed unit provide the necessary stability for larger diameters and hard rocks. The combination of suitable speed, appropriate contact pressure, and a suitable core bit minimizes spalling and improves tool life &#8211; an essential prerequisite for efficient work with <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong>. Typical bore diameters in splitting workflows range from small pilot holes to medium and large cores; consistent spacing and perpendicularity increase splitting predictability and reduce energy demand.<\/p>\n<h2>The role of the drilling drive unit in combination with concrete demolition shears<\/h2>\n<p>Even though <strong>concrete demolition shears<\/strong> themselves separate and dismantle, drilling often creates the preconditions for a controlled shear maneuver. These include anchor drilling for temporary securing, relief boreholes in thick cross-sections to control stresses, or the installation of tie-in points on components. In heavily reinforced concrete, targeted drilling can make it easier to locate and expose reinforcement before <strong>concrete demolition shears<\/strong> or <strong>steel shears<\/strong> are used. This reduces the risk of uncontrolled crack formation and makes the cutting sequence more predictable. In addition, relief holes near stress concentrations reduce tool wear and help maintain defined cut lines.<\/p>\n<h2>Selection criteria and sizing<\/h2>\n<p>The sizing of the drilling drive unit is guided by material, geometry, and process objectives. Careful selection prevents tool breakage, reduces downtime, and increases the quality of the borehole pattern. Matching torque to diameter and optimizing speed for the abrasive character of the aggregate are central to reliable progress.<\/p>\n<h3>Essential criteria<\/h3>\n<ol>\n<li><strong>Material and structure<\/strong>: Concrete strength, rock type, moisture, reinforcement ratio; brittle, abrasive, or heterogeneous zones require different strategies.<\/li>\n<li><strong>Drilling diameter and depth<\/strong>: Larger diameters require lower speed, higher torque, and stable guidance.<\/li>\n<li><strong>Method<\/strong>: Wet or dry drilling, pure rotation or additional impact; diamond core drilling for precise openings.<\/li>\n<li><strong>Power source<\/strong>: Hydraulics (via <strong>hydraulic power packs<\/strong>), electric, or pneumatic &#8211; depending on availability and environment.<\/li>\n<li><strong>Ergonomics and space<\/strong>: Hand-held vs. stand; working overhead, in shafts, or in sensitive interior spaces.<\/li>\n<li><strong>Dust, noise, vibration<\/strong>: Requirements for dust extraction, water management, and low-vibration work in existing structures.<\/li>\n<li><strong>Cooling and flushing logistics<\/strong>: Water supply, slurry collection, and disposal capacity sized to drilling rate.<\/li>\n<li><strong>Interfaces<\/strong>: Compatibility of spindle\/thread, stands, and anchoring accessories for accurate alignment.<\/li>\n<\/ol>\n<h2>Tools and drilling methods<\/h2>\n<p>The choice of drilling tool determines performance and edge quality. Diamond core bits cut cleanly and are suitable for reinforcement. Carbide tools offer high feed rates in non-reinforced concrete or rock. In rock construction, for long hole arrays, stable, low-vibration setups with constant feed are preferred. Attention to runout, segment condition, and cooling ensures consistent kerf and minimal microcracking.<\/p>\n<h3>Recommendations for tooling and operation<\/h3>\n<ul>\n<li><strong>Diamond core drilling (wet)<\/strong>: Clean cut surfaces, low dust generation; plan reliable water supply and slurry management.<\/li>\n<li><strong>Dry drilling<\/strong>: Only with suitable dust extraction; reduced speed and controlled feed mitigate heat spikes.<\/li>\n<li><strong>Percussive assist<\/strong>: Possible in very hard rocks; consider component compatibility and vibration transmission.<\/li>\n<li><strong>Feed strategy<\/strong>: Uniform pressure, cyclic relief for chip removal; change over in time when encountering reinforcement.<\/li>\n<li><strong>Tool care<\/strong>: Dress diamond segments as needed and check concentricity to sustain cutting rates.<\/li>\n<\/ul>\n<h2>Safety, health, and the environment<\/h2>\n<p>Drilling generates reaction torque, noise, dust, and &#8211; with wet drilling &#8211; drilling slurry. Safe working practices include appropriate personal protective equipment, secure fixation of the drive unit, controlled handling of torque, and effective dust and slurry management. In buildings, protect existing structures, utilities, and installations; outdoors, ensure soil and water protection when handling flushing water. Regulations on occupational safety, noise, and dust must always be observed; a project-specific hazard analysis is advisable. Limiting hand-arm vibration exposure and defining exclusion zones improves occupational safety.<\/p>\n<h3>Practical notes<\/h3>\n<ul>\n<li><strong>Reaction torque<\/strong>: Plan grip technique and bracing; for high torques, work with a stand.<\/li>\n<li><strong>Dust and slurry<\/strong>: Provide dust extraction or water supply; collect and dispose of drilling slurry properly.<\/li>\n<li><strong>Electrical safety<\/strong>: Use appropriate protective measures when wet drilling with electric drives.<\/li>\n<li><strong>Hydraulics<\/strong>: Secure hose routing; match pressure\/flow rate to the drilling drive unit.<\/li>\n<\/ul>\n<h2>Operation, maintenance, and troubleshooting<\/h2>\n<p>Regular checks of the drilling drive unit increase availability and service life. Bearings, gearbox, and seals must be maintained according to manufacturer specifications; in hydraulic systems, hose lines, couplings, and filters must be inspected. Deviations in speed or torque indicate wear, incorrect parameter settings, or unsuitable tooling. Periodic inspection of the spindle interface and alignment of the stand prevents runout and premature tool wear.<\/p>\n<h3>Typical symptoms and countermeasures<\/h3>\n<ul>\n<li><em>Slow drilling performance<\/em>: Adjust speed\/torque, optimize feed, replace dull core bit, improve cooling\/flushing.<\/li>\n<li><em>Tool jamming<\/em>: Reduce feed, relieve periodically, ensure removal of cuttings, change tool when encountering reinforcement.<\/li>\n<li><em>Overheating<\/em>: Increase cooling water, reduce speed, adjust cutting pressure.<\/li>\n<li><em>Runout<\/em>: Check tool interface, align stand, inspect bearing condition.<\/li>\n<li><em>Vibration or chatter<\/em>: Shorten overhang, verify stand anchoring, select a more suitable bit geometry.<\/li>\n<\/ul>\n<h2>Performance indicators and planning<\/h2>\n<p>For reliable deployment planning, consider drilling performance (m\/h), tool life, energy demand, and rework (cleaning, edge finishing). In practice, working with reference values from comparable projects, supplemented by trial drilling, has proven effective. This allows hole patterns, drilling diameter, and depth to be reliably matched to subsequent steps &#8211; such as inserting <strong>hydraulic wedge splitters<\/strong> or applying <strong>concrete demolition shears<\/strong>. Transparent recording of cycle times, water consumption, and bit wear supports realistic scheduling and cost control.<\/p>\n<h3>Planning checklist<\/h3>\n<ol>\n<li>Define the objective: opening, anchor, hole array, relief.<\/li>\n<li>Material analysis: strength, reinforcement, moisture, abrasiveness.<\/li>\n<li>Select method: core drilling, rotary drilling, optional percussive assist.<\/li>\n<li>Specify the drilling pattern: diameter, depth, spacing, tolerances.<\/li>\n<li>Size the drive and power source: hydraulic or electric setup, accessories.<\/li>\n<li>HSE measures: dust, noise, slurry, support, reaction torque.<\/li>\n<li>Trial run\/fine-tuning: adjust parameters, monitor tool wear.<\/li>\n<li>Documentation and quality assurance: record parameters, inspect bore geometry, and capture lessons learned.<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A drilling drive unit is the heart of any drilling application in concrete and rock. It converts available energy &#8211; most commonly hydraulic, but also electric or pneumatic &#8211; into rotational motion with controllable torque. In deconstruction, strip-out, tunnel and rock construction, and natural stone extraction, the right drilling drive <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18999","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Drilling Drive Unit for Concrete &amp; Rock<\/title>\n<meta name=\"description\" content=\"Achieve precise concrete and rock drilling with a drilling drive unit \u2713 torque control, core or rotary drilling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Drilling Drive Unit for Concrete &amp; Rock\" \/>\n<meta property=\"og:description\" content=\"Achieve precise concrete and rock drilling with a drilling drive unit \u2713 torque control, core or rotary drilling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-28T15:55:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-drive-unit\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-drive-unit\",\"name\":\"Drilling Drive Unit for Concrete & Rock\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-21T12:22:07+00:00\",\"dateModified\":\"2026-03-28T15:55:04+00:00\",\"description\":\"Achieve precise concrete and rock drilling with a drilling drive unit \u2713 torque control, core or rotary drilling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-drive-unit#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-drive-unit\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-drive-unit#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Drilling drive unit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Drilling Drive Unit for Concrete & Rock","description":"Achieve precise concrete and rock drilling with a drilling drive unit \u2713 torque control, core or rotary drilling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit","og_locale":"en_US","og_type":"article","og_title":"Drilling Drive Unit for Concrete & Rock","og_description":"Achieve precise concrete and rock drilling with a drilling drive unit \u2713 torque control, core or rotary drilling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-28T15:55:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit","url":"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit","name":"Drilling Drive Unit for Concrete & Rock","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-21T12:22:07+00:00","dateModified":"2026-03-28T15:55:04+00:00","description":"Achieve precise concrete and rock drilling with a drilling drive unit \u2713 torque control, core or rotary drilling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/drilling-drive-unit#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Drilling drive unit"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18999"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18999\/revisions"}],"predecessor-version":[{"id":25781,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18999\/revisions\/25781"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}