{"id":18997,"date":"2025-10-21T08:56:37","date_gmt":"2025-10-21T06:56:37","guid":{"rendered":"https:\/\/www.darda.de\/slab-on-grade-foundation"},"modified":"2026-03-27T07:51:02","modified_gmt":"2026-03-27T06:51:02","slug":"slab-on-grade-foundation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation","title":{"rendered":"Slab-on-grade foundation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The <strong>slab-on-grade foundation<\/strong> is the load-bearing foundation of many structures-from residential buildings to industrial halls to infrastructure and tunnel operations buildings. It distributes permanent and variable loads into the subsoil, protects against moisture, and serves as a structural connection between the building and the ground. In planning, construction, repair, and deconstruction, contractors use specialized, hydraulically operated tools depending on the task. In practice, concrete demolition shears as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH are frequently used, especially when low-vibration methods are required or reinforcing steel must be separated selectively. These approaches enable precise, low-damage work and clean material separation even in confined or operational environments.<\/p>\n<h2>Definition: What Is a Slab-on-Grade Foundation?<\/h2>\n<p>A slab-on-grade foundation (also called foundation slab, base slab, or founding slab) is a planar reinforced concrete structure that transfers the loads of the building evenly into the ground. It typically consists of reinforced concrete, rests on a level foundation surface, and-depending on the project-is executed with waterproofing layers, thermal insulation, joints, and connection details to the rising structural elements. Its sizing is governed by the subsoil conditions, assumed loads, service conditions, and the recognized rules of practice. Typical thicknesses range from about 150 to 300 mm for residential and light commercial structures and can be significantly higher in industrial or storage applications. Depending on exposure and use, vapor control or radon barriers can be integrated as part of the system concept.<\/p>\n<h2>Structure, Reinforcement, and Execution of the Slab-on-Grade Foundation<\/h2>\n<p>A properly executed slab-on-grade foundation is based on a competent, compacted subgrade. Common layers include a capillary break (e.g., gravel or crushed stone), a blinding layer, and-depending on load and moisture exposure-waterproofing layers as well as perimeter insulation beneath or above the slab. The concrete is reinforced with adequate cover (bottom or top layers, edge reinforcements where required, and punching shear reinforcement in areas of point loads). Joints (movement, construction, and control joints) are planned to control restraint stresses and cracking. In watertight construction, the slab can be designed as part of a water-impermeable system. Also essential are proper compaction, curing to avoid early shrinkage cracking, and correct penetrations and connections. During refurbishment, repurposing, or deconstruction, sections of the slab-on-grade foundation are selectively separated, cut, or split-depending on boundary conditions, concrete demolition shears, hydraulic wedge splitters for rock and concrete, rebar cutters, Multi Cutters, and matching hydraulic power packs from Darda GmbH are used in coordinated methods.<\/p>\n<p><strong>Typical layer build-up<\/strong> can include:<\/p>\n<ul>\n<li>Compacted subgrade with documented degree of compaction and levelness tolerance.<\/li>\n<li>Capillary break with graded aggregate and filtered separation if required.<\/li>\n<li>Blinding layer for a clean, even working surface and to protect membranes.<\/li>\n<li>Vapor control or waterproofing membranes with sealed overlaps and penetrations.<\/li>\n<li>Thermal insulation where required by energy or frost design, placed below or above the slab.<\/li>\n<li>Reinforcement meshes and bars with correct bar spacing, anchorage, and lap lengths.<\/li>\n<li>Concrete with controlled workability, proper placement, vibration, and curing.<\/li>\n<\/ul>\n<p>Execution details with high impact on durability include saw-cut timing for control joints (early-entry or within a defined time window), continuous waterstops at movement joints in watertight designs, and load transfer devices such as dowels at free-movement joints. Edge thickenings and local haunches should be reinforced for concentrated loads and protected against edge breakage.<\/p>\n<h2>Planning a Slab-on-Grade Foundation: Subsoil, Load Transfer, and Joint Management<\/h2>\n<p>The load-bearing behavior of a slab-on-grade foundation depends primarily on the ground conditions (settlement and bearing behavior, frost susceptibility, water regime) and the distribution of loads. A sufficiently stiff slab reduces differential settlements; edge beams and localized thickenings can absorb local peak loads. A coherent joint and crack-width control concept accounts for shrinkage, temperature, restraint from supports, and connection details at walls, columns, and foundations. Waterproofing and thermal protection are determined by use, moisture exposure, and energy requirements. For existing structures, a thorough condition assessment documenting cracks, voids, moisture ingress, and reinforcement layouts is the basis for repair and deconstruction decisions.<\/p>\n<ul>\n<li><strong>Design checks<\/strong> typically consider the modulus of subgrade reaction, allowable bearing pressure, global and differential settlement limits, punching shear near point loads, and crack-width control under service conditions.<\/li>\n<li><strong>Interfaces<\/strong> with walls and columns require defined transfer of shear and tension, continuous waterproofing or vapor control, and clear movement allowances at joints.<\/li>\n<li><strong>Frost and groundwater<\/strong> conditions drive decisions on insulation placement, drainage layers, and the selection of watertight detailing.<\/li>\n<\/ul>\n<h2>Slab-on-Grade Foundation in Concrete Demolition and Special Deconstruction<\/h2>\n<p>In selective deconstruction, slab-on-grade foundations are separated into manageable sections to reduce emissions, vibrations, and risks to adjacent components. The choice of methods and tools depends on slab thickness, reinforcement ratio, accessibility, environmental protection, and the disposal concept. Controlled, low-vibration approaches limit peak particle velocity and protect neighboring operations.<\/p>\n<h3>Selection of Methods<\/h3>\n<ul>\n<li><strong>Split instead of blast:<\/strong> Darda GmbH hydraulic wedge splitters for rock and concrete generate defined crack patterns with minimal vibrations. Suitable for thick slabs, highly reinforced areas, and sensitive environments.<\/li>\n<li><strong>Grab and remove:<\/strong> Concrete demolition shears allow the incremental biting off of edges, bearing zones, and thickenings, with good control over fracture progression and low stress on the structure.<\/li>\n<li><strong>Separating reinforcement:<\/strong> Rebar cutters and Multi Cutters cut reinforcing bars and meshes safely and cleanly, supporting source-separated sorting for recycling.<\/li>\n<li><strong>Hydraulic supply:<\/strong> Appropriately sized <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">mobile hydraulic power units<\/a> feed the carrier and handheld tools as needed; keep hose runs short, ensure sufficient drive power, and manage temperature.<\/li>\n<li><strong>Pre-cutting and coring:<\/strong> Diamond saw cuts and core drills define separation lines, relieve restraint, and improve edge quality ahead of splitting or biting.<\/li>\n<\/ul>\n<h3>Workflow in Practice<\/h3>\n<ol>\n<li>Survey: reinforcement layout, embedded parts, utilities, voids, blinding concrete, waterproofing.<\/li>\n<li>Preparation: dust protection and noise control, expose edges, mark separation lines, set up catch devices.<\/li>\n<li>Pre-weakening: core drilling or slots along planned fracture lines to guide the splitting process.<\/li>\n<li>Splitting\/Biting: use hydraulic wedge splitters and concrete demolition shears, section by section.<\/li>\n<li>Steel Removal: separate the reinforcement with rebar cutters or Multi Cutters, transport separately.<\/li>\n<li>Sorting: separate mineral fraction, steel, waterproofing residues, and insulation materials for recycling and disposal.<\/li>\n<li>Logistics and lifting: define pick points and capacities, secure transport routes, and intermediate storage.<\/li>\n<li>Quality check: verify geometry, residual supports, and cleanliness of interfaces for subsequent works.<\/li>\n<\/ol>\n<h2>Openings, Penetrations, and Strip-Out in Slab-on-Grade Foundations<\/h2>\n<p>Subsequent openings for building drains, service ducts, elevator shafts, or machine foundations require a precise, low-damage approach. Concrete demolition shears support controlled removal along the opening edge; hydraulic wedge splitters produce defined cracks where saw cuts cannot be continuous. Reinforcing bars are shortened with rebar cutters or Multi Cutters. In existing buildings, low vibrations and spark-free operations are often decisive, for example around sensitive equipment or in ATEX zones. After cutting, edge reinforcement must be re-anchored where required, and waterproofing, vapor control, or radon barriers reinstated with tested details.<\/p>\n<h3>Important Notes for Execution<\/h3>\n<ul>\n<li>Locate and mark utilities and embedded parts; consider recesses and joint paths.<\/li>\n<li>Plan crack control: set pre-weakening to avoid uncontrolled spalling at supports.<\/li>\n<li>Provide shoring when support zones are weakened.<\/li>\n<li>Rework edges, minimize edge breakage, and treat reinforcement for corrosion protection.<\/li>\n<li>Define tolerances for opening size and levelness; check against equipment or shaft requirements.<\/li>\n<li>Coordinate the sealing concept early to maintain watertightness and vapor control across penetrations.<\/li>\n<\/ul>\n<h2>Slab-on-Grade Foundation and Rock: Foundation, Rock Excavation, and Tunnel Construction<\/h2>\n<p>For foundations on rock, a level, load-bearing founding surface must be prepared. Darda GmbH hydraulic wedge splitters are suitable for low-vibration rock excavation, e.g., to even out local height differences or to create service ducts. In the vicinity of tunnel structures and operations buildings, controlled processing of the rock and precise integration of slab-on-grade foundations into existing structures help protect neighboring works. Anchorage to rock with dowels or anchors, verified bearing contact, and drainage management at interfaces are crucial for long-term performance.<\/p>\n<h2>Special Deployment: Work in Sensitive Areas<\/h2>\n<p>In hospitals, laboratories, production plants, existing halls, or heritage areas, noise, dust, and vibrations must be minimized. <em>Low-vibration<\/em> methods such as splitting and incremental removal with concrete demolition shears help limit transmitted vibrations. Low-spark cutting (e.g., for reinforcing steel) increases safety in ATEX zones. <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">Tank Cutter<\/a> from Darda GmbH can play a role when adjacent steel vessels or tanks are part of the deconstruction logistics; cutting paths must be coordinated with fire protection and any residual media. Clearly defined work windows, measured vibration thresholds, and negative-pressure or filtered enclosures for dust control support uninterrupted neighboring operations.<\/p>\n<h2>Repair, Strengthening, and Partial Renewal<\/h2>\n<p>Typical damage patterns include shrinkage and settlement cracks, edge spalling, reinforcement corrosion, moisture ingress, and punching shear cracks in areas of high point loads. For repair and strengthening, damaged zones are selectively removed, edges exposed and cleaned, corroded bars replaced, and the area restored with suitable systems. Concrete demolition shears enable targeted removal to the required depth; hydraulic wedge splitters create clean separation edges without overloading adjacent elements. For partial renewals, joint connections and bond surfaces (rough, load-bearing, clean) are decisive for durability. Substrate preparation to a specified roughness and cleanliness class, proven bond strength, and continuous corrosion protection are essential acceptance criteria.<\/p>\n<h2>Quality, Safety, and Environmental Aspects<\/h2>\n<ul>\n<li><strong>Occupational safety:<\/strong> Personal protective equipment, secure supports, and stable intermediate storage of concrete segments are mandatory. Protect hydraulic hose lines against damage.<\/li>\n<li><strong>Emissions:<\/strong> Dust extraction, wetting the work area, noise control. Measure vibrations when sensitive equipment is adjacent.<\/li>\n<li><strong>Environment and recycling:<\/strong> Collect mineral constituents and steel separately. Separate waterproofing, coatings, and insulation by material stream and dispose of them properly.<\/li>\n<li><strong>Documentation:<\/strong> Maintain existing-condition records, approvals, test protocols, and evidence continuously; document changes in the construction process.<\/li>\n<li><strong>Method statements and permits:<\/strong> Define access, lifting, emergency routes, and environmental measures; keep approvals available on site.<\/li>\n<li><strong>Water and slurry management:<\/strong> Capture cutting water and fines, separate and dispose of in accordance with local requirements.<\/li>\n<\/ul>\n<h2>Practical Tips for Efficient Workflows<\/h2>\n<ul>\n<li>Choose sections so that weight and grip point match the lifting gear; pre-shape edges to provide safe engagement for concrete demolition shears.<\/li>\n<li>Size hydraulic power packs to suit the tool set; monitor operating temperatures, plan service intervals.<\/li>\n<li>Expose reinforcement before the final separation stroke and cut it with rebar cutters or Multi Cutters to prevent spalling.<\/li>\n<li>For thick slabs, split at multiple depth levels and remove in layers rather than separating in a single pass.<\/li>\n<li>Plan control joints early and cut them at the correct time and depth to limit random cracking.<\/li>\n<li>Keep quick couplers and hose connections clean; protect against kinking and crushing along traffic paths.<\/li>\n<li>Provide edge protection and supports to avoid unplanned breakouts near openings and bearing lines.<\/li>\n<\/ul>\n<h2>Legal and Technical Notes<\/h2>\n<p>Planning, execution, repair, and deconstruction of slab-on-grade foundations follow the applicable standards and recognized rules of practice. Requirements from geotechnical reports, permits, occupational and environmental safety must be considered on a project-specific basis. The information in this article is general in nature and does not replace project-specific design or approvals. Additional constraints can result from groundwater protection, contamination, heritage conservation, or vibration and noise limits in sensitive neighborhoods; these must be verified and agreed before work starts.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The slab-on-grade foundation is the load-bearing foundation of many structures-from residential buildings to industrial halls to infrastructure and tunnel operations buildings. It distributes permanent and variable loads into the subsoil, protects against moisture, and serves as a structural connection between the building and the ground. In planning, construction, repair, and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18997","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Slab-on-Grade Foundation | Definition &amp; Methods<\/title>\n<meta name=\"description\" content=\"Expert guide to slab-on-grade concrete foundations \u2713 design, joints, waterproofing, low-vibration removal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Slab-on-Grade Foundation | Definition &amp; Methods\" \/>\n<meta property=\"og:description\" content=\"Expert guide to slab-on-grade concrete foundations \u2713 design, joints, waterproofing, low-vibration removal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-27T06:51:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/slab-on-grade-foundation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/slab-on-grade-foundation\",\"name\":\"Slab-on-Grade Foundation | Definition & Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-21T06:56:37+00:00\",\"dateModified\":\"2026-03-27T06:51:02+00:00\",\"description\":\"Expert guide to slab-on-grade concrete foundations \u2713 design, joints, waterproofing, low-vibration removal.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/slab-on-grade-foundation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/slab-on-grade-foundation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/slab-on-grade-foundation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Slab-on-grade foundation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Slab-on-Grade Foundation | Definition & Methods","description":"Expert guide to slab-on-grade concrete foundations \u2713 design, joints, waterproofing, low-vibration removal.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation","og_locale":"en_US","og_type":"article","og_title":"Slab-on-Grade Foundation | Definition & Methods","og_description":"Expert guide to slab-on-grade concrete foundations \u2713 design, joints, waterproofing, low-vibration removal.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-27T06:51:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation","url":"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation","name":"Slab-on-Grade Foundation | Definition & Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-21T06:56:37+00:00","dateModified":"2026-03-27T06:51:02+00:00","description":"Expert guide to slab-on-grade concrete foundations \u2713 design, joints, waterproofing, low-vibration removal.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/slab-on-grade-foundation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Slab-on-grade foundation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18997"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18997\/revisions"}],"predecessor-version":[{"id":25716,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18997\/revisions\/25716"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}