{"id":18985,"date":"2025-10-23T14:58:52","date_gmt":"2025-10-23T12:58:52","guid":{"rendered":"https:\/\/www.darda.de\/concrete-compaction"},"modified":"2026-03-27T08:28:03","modified_gmt":"2026-03-27T07:28:03","slug":"concrete-compaction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction","title":{"rendered":"Concrete compaction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Concrete compaction is a core process of concrete construction: it removes entrapped air, distributes the cement paste uniformly around the aggregate, and achieves the required density, strength, and durability. Its quality shapes not only the service phase of a structure, but also decisively affects subsequent concrete demolition and special demolition. In application areas such as building gutting and concrete cutting, rock breakout and tunnel construction, or in special demolition, compaction-induced material properties directly affect the member&#8217;s behavior under load and its separation and splitting behavior. This is particularly relevant when using concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, where components are to be dismantled selectively, in a controlled manner, and with low vibration. Consistent consolidation reduces void ratio, improves bond to reinforcement, and stabilizes crack propagation paths, which in turn enables predictable deconstruction sequences.<\/p>\n<h2>Definition: What is meant by concrete compaction?<\/h2>\n<p>Concrete compaction refers to the mechanical action on freshly placed concrete to eliminate <em>air voids<\/em> and cavities, prevent segregation, and optimally embed the aggregate in the cement paste. The goal is a high <strong>degree of compaction<\/strong> that ensures the required properties such as compressive and flexural tensile strength, watertightness, resistance to frost and de-icing salts, and effective corrosion protection of the reinforcement. Compaction is typically performed by internal vibrators, external vibrators, vibrating tables, vibrating screeds, or-for very stiff mixes-by tamping and striking off. For shotcrete, the impact energy performs a major part of the compaction work. For highly flowable or self-compacting concretes, consolidation is achieved largely by the concrete&#8217;s own weight, supplemented by minimal mechanical excitation to release residual air.<\/p>\n<h2>Technical fundamentals and operating principle of concrete compaction<\/h2>\n<p>Mechanical vibrations or impulses place the fresh concrete in a quasi-flowable state. Entrapped air can escape, particles move closer together, and the cement paste completely coats the aggregate. The result is lower porosity, a more homogeneous microstructure, and thus higher durability. Compaction times that are too short leave air voids; over-vibration can lead to <em>segregation<\/em>. The right amount depends on consistency, particle size distribution, reinforcement density, and geometry. In practice, completion indicators include the cessation of rising air bubbles, a slight mortar film at the surface, and a change in the vibrator&#8217;s pitch. Frequency, amplitude, and head diameter must be matched to lift thickness and reinforcement to transmit sufficient <strong>compaction energy<\/strong> without displacing aggregate.<\/p>\n<h2>Methods of concrete compaction at a glance<\/h2>\n<h3>Internal vibrators (poker vibrators)<\/h3>\n<p>Internal vibrators are inserted with overlapping spacing, held briefly, and withdrawn slowly. Important are sufficient <strong>insertion depth<\/strong> (including into the underlying lift), avoiding contact with the reinforcement, and targeted venting of air. Typical mistakes include spacing that is too large, insufficient overlap, and withdrawing too quickly. In heavily reinforced zones, smaller vibrator diameters and tighter grids are advisable. As a guide, insertion spacing approximating 8 to 10 times the vibrator head diameter and dwell times until visible air release ceases are effective without provoking segregation.<\/p>\n<h3>External vibrators and vibrating benches<\/h3>\n<p>External vibrators transmit vibrations through the formwork and are suitable for precast elements and thin-walled members with dense reinforcement. Vibrating benches are used primarily in precast plants. The vibration energy must match the member stiffness, formwork, and concrete mix design to avoid segregation. Continuous formwork contact, adequate clamping, and synchronized placement cycles improve transmission and reduce cold joints, especially at corners, ribs, and openings.<\/p>\n<h3>Vibrating screeds and surface compaction<\/h3>\n<p>For slabs and decks of small thickness, vibrating screeds and troweling machines ensure uniform surface compaction. For earth-moist or very stiff mixes, rammers and a straightedge are additionally used to adequately compact edges and border zones. Particular attention is required at upstands, penetrations, and interfaces to avoid <em>edge honeycombing<\/em> and lipping.<\/p>\n<h3>Shotcrete<\/h3>\n<p>With shotcrete, compaction is achieved primarily by the <em>impact energy<\/em> of the particles and the layer-by-layer application. Post-compaction, e.g., by light tapping or striking off, improves surface quality. Especially in tunnel construction, the density achieved influences subsequent rework, profile corrections, and deconstruction steps. Nozzle angle, stand-off distance, and rebound control are decisive for obtaining uniform layer density.<\/p>\n<h3>Self-compacting concrete<\/h3>\n<p>Self-compacting concrete achieves consolidation under its own weight with minimal mechanical input. Complementary techniques such as short-duration external vibration or light rodding along formwork lines can release residual air without disturbing segregation resistance. Testing by slump flow and passing ability helps define the allowable compaction window.<\/p>\n<h2>Factors influencing compaction quality<\/h2>\n<ul>\n<li>Consistency and water-cement ratio: Too stiff makes work difficult; too fluid increases segregation risk.<\/li>\n<li>Grading and fines content: A well-graded particle size distribution promotes dense packing; sufficient fines stabilize the mortar.<\/li>\n<li>Temperature and placement conditions: High temperatures shorten workable time; wind and sun promote early shrinkage cracking.<\/li>\n<li>Reinforcement ratio and geometry: Tight reinforcement and complex shapes require smaller vibrators and finer steps.<\/li>\n<li>Formwork and placement paths: Tight formwork prevents cement slurry leakage; short placement paths reduce segregation.<\/li>\n<li>Chemical admixtures: Viscosity modifiers and superplasticizers change flow behavior and the required vibration energy.<\/li>\n<li>Lift thickness and sequence: Moderate lift heights facilitate air escape and secure interlayer bonding by re-penetration.<\/li>\n<li>Timing of re-vibration: Within the plastic phase, controlled re-vibration can close settlement-induced voids around bars.<\/li>\n<\/ul>\n<p>The optimal combination of concrete mix design, compaction method, and execution discipline is crucial. Already at the planning stage, placement openings, construction joints, and equipment selection should be coordinated. Clear access routes, backup power supply, and spare vibrators reduce stoppages and cold joints.<\/p>\n<h2>Typical defect patterns and their consequences<\/h2>\n<ul>\n<li>Voids, pores, and honeycombing: Reduced strength, increased permeability, corrosion risk to the reinforcement.<\/li>\n<li>Segregation and bleeding: Inhomogeneous zones with low bond strength, uneven surfaces.<\/li>\n<li>Edge zone issues: Insufficient compaction at edges and under projections leads to spalling.<\/li>\n<li>Over-compaction in thin elements: Settlement of coarse aggregate, mortar accumulation at the surface.<\/li>\n<li>Bugholes and surface pinholes: Aesthetic impairment and potential initiation points for surface scaling under freeze-thaw.<\/li>\n<\/ul>\n<p>These deficiencies carry over into deconstruction: flaws, voids, and inhomogeneous microstructures favor crack initiation and steer crack paths. When using concrete demolition shears from Darda GmbH, this often leads to faster removal in under-compacted zones, while well-compacted core areas require higher forces. Stone and concrete splitters exploit existing weak zones to produce controlled fracture patterns. Overly dense surface skins may initially resist tool engagement but tend to delaminate once a controlled crack front is established.<\/p>\n<h2>Testing and quality assurance of concrete compaction<\/h2>\n<h3>Visual inspection and sounding<\/h3>\n<p>The surface should appear uniform, low in pores, and free of mortar nests. Audible differences when tapping indicate voids. Edges and penetrations merit special attention. Indicators such as laitance bands, differential gloss, and persistent bugholes signal insufficient vibration or early formwork movement.<\/p>\n<h3>Fresh concrete and microstructure testing<\/h3>\n<p>Slump, flow spread, or Vebe time characterize workability and indicate the required compaction window. Density and air content tests as well as core extraction, ultrasonic testing, or radiography are used to assess microstructural quality in the hardened state. For self-compacting mixes, slump flow, T500 time, L-box, or J-ring results provide evidence of filling and passing ability without segregation.<\/p>\n<h3>Documentation and self-monitoring<\/h3>\n<p>Specified vibration grids, insertion depths, cycle times, and equipment parameters should be documented. Ongoing self-monitoring helps make adjustments for weather and consistency. Specifications from recognized standards must be observed; legal requirements may vary by project and should always be verified. Capturing placement temperature, lift heights, and any re-vibration events facilitates later diagnostics and deconstruction planning.<\/p>\n<h2>Effects of concrete compaction on demolition, deconstruction, and separation methods<\/h2>\n<p>The microstructural density largely determines how members fail under the forces of pressing, splitting, and cutting tools. Compaction influences crack initiation and propagation, and the debonding work at reinforcement and aggregate. This has practical consequences in several application areas of Darda GmbH. Uniformly compacted concrete exhibits higher energy absorption and more predictable bond-slip at reinforcement, informing tool selection and cycle planning.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>For dense, highly compacted material, higher pressing forces are necessary. Concrete demolition shears tend to engage at edges, joints, and penetrations; in areas with insufficient compaction, material removal is faster. Stone and concrete splitters use borehole lines to guide controlled fractures through the member; the energy required increases with density and homogeneity. Long cycles demand <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">appropriately sized hydraulic power units<\/a> for both thermal capacity and performance. Where compaction varies across the cross-section, staged pre-splitting and progressive shear engagement improve process control.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>When selectively removing layers or inserts, microstructural properties affect cut quality and edge stability. Homogeneous compaction reduces breakout along the cut line. In combination with concrete demolition shears, combination shears, or Multi Cutters, components can be released section by section, with over-compacted edge layers tending to require higher initiating forces. Steel shears cut reinforcement, whose bond to the concrete structure is higher in well-compacted areas. Minimizing vibration transmission by sequencing cuts and splits benefits adjacent finishes and sensitive installations.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>Shotcrete linings with sufficient compaction exhibit tougher crack behavior. For profile corrections and temporary openings, stone and concrete splitters help to relieve stresses in a controlled manner. In strongly compacted zones, splits run straighter; in under-compacted areas, fracture often follows the local pore network. Documented shotcrete parameters and layer thicknesses support accurate prediction of the splitting pattern.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>While natural stone forms without compaction, compacted concrete inserts occur in combined construction (e.g., foundation undercasting, anchor grouting). Their microstructure influences the choice of splitting strategy when concrete portions must be separated from natural stone, for example during plinth or foundation replacements. Pre-surveys to locate interfaces and voids reduce the risk of uncontrolled flaking at stone-concrete transitions.<\/p>\n<h3>Special operations<\/h3>\n<p>In sensitive environments with limited vibrations, controlled splitting and shear methods are preferred. The microstructural density of the concrete guides the choice of measures: <em>pore-rich<\/em> zones allow lower pressure stages and faster cycles; dense zones require graduated load increases and, if necessary, preparatory work. Sequenced loading, temporary support, and local relief cuts help maintain stability while achieving targeted separation.<\/p>\n<h2>Planning, occupational safety, and execution notes<\/h2>\n<p>For production: plan accessibility, construction joints, reinforcement layout, and formwork tightness so continuous compaction is possible. For deconstruction: survey the member&#8217;s microstructure, locate voids, determine reinforcement layout. Personal protective equipment, dust and noise reduction, as well as measures against vibration exposure must be provided. Legal requirements on occupational safety, environmental protection, and disposal are project-specific and must be considered in general. Additional measures include silica dust control, proper slurry management, and task-specific risk assessments for elevated vibration or heat exposure.<\/p>\n<h2>Practical recommendations for optimizing concrete compaction<\/h2>\n<ol>\n<li>Match mix design and consistency to the member and method; avoid adding water on site.<\/li>\n<li>Define vibration grid, insertion depth, and dwell time; ensure overlap of vibrator influence zones.<\/li>\n<li>Plan reinforcement layout so vibrators can pass; use smaller vibrators if needed.<\/li>\n<li>Execute formwork tight and load-bearing; prevent leakage of cement slurry.<\/li>\n<li>Consider weather: work faster in heat, begin curing early.<\/li>\n<li>Train personnel and use trial pours to assess the concrete&#8217;s behavior under compaction.<\/li>\n<li>Preserve information for later deconstruction: document placement data, consistency, and compaction method; this facilitates selecting concrete demolition shears or stone and concrete splitters from Darda GmbH.<\/li>\n<li>Adjust frequency and amplitude to mix rheology and lift thickness; monitor sound, surface response, and air release as real-time indicators.<\/li>\n<li>Apply controlled re-vibration only within the permissible time window to close settlement voids without disturbing aggregate structure.<\/li>\n<\/ol>\n<p>Consistent compaction delivers a dense, homogeneous microstructure. It thus provides the basis for load-bearing, durable structures-and for predictable, controlled deconstruction processes with tools such as concrete demolition shears, stone and concrete splitters, combination shears, Multi Cutters, steel shears, tank cutters, and suitable hydraulic power packs from Darda GmbH. Linking execution records to deconstruction planning shortens cycles, reduces emissions, and enhances process reliability.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Concrete compaction is a core process of concrete construction: it removes entrapped air, distributes the cement paste uniformly around the aggregate, and achieves the required density, strength, and durability. Its quality shapes not only the service phase of a structure, but also decisively affects subsequent concrete demolition and special demolition. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18985","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Compaction - Construction Methods &amp; QA<\/title>\n<meta name=\"description\" content=\"Master concrete compaction in construction \u2713 methods, quality control, durability &amp; demolition insights.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Compaction - Construction Methods &amp; QA\" \/>\n<meta property=\"og:description\" content=\"Master concrete compaction in construction \u2713 methods, quality control, durability &amp; demolition insights.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-27T07:28:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-compaction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-compaction\",\"name\":\"Concrete Compaction - Construction Methods & QA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-23T12:58:52+00:00\",\"dateModified\":\"2026-03-27T07:28:03+00:00\",\"description\":\"Master concrete compaction in construction \u2713 methods, quality control, durability & demolition insights.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-compaction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-compaction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-compaction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Concrete compaction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Compaction - Construction Methods & QA","description":"Master concrete compaction in construction \u2713 methods, quality control, durability & demolition insights.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction","og_locale":"en_US","og_type":"article","og_title":"Concrete Compaction - Construction Methods & QA","og_description":"Master concrete compaction in construction \u2713 methods, quality control, durability & demolition insights.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-27T07:28:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction","url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction","name":"Concrete Compaction - Construction Methods & QA","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-23T12:58:52+00:00","dateModified":"2026-03-27T07:28:03+00:00","description":"Master concrete compaction in construction \u2713 methods, quality control, durability & demolition insights.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-compaction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Concrete compaction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18985","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18985"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18985\/revisions"}],"predecessor-version":[{"id":25721,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18985\/revisions\/25721"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18985"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}