{"id":18980,"date":"2025-10-24T08:39:22","date_gmt":"2025-10-24T06:39:22","guid":{"rendered":"https:\/\/www.darda.de\/concrete-cutting"},"modified":"2026-09-12T19:53:05","modified_gmt":"2026-09-12T17:53:05","slug":"concrete-cutting","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting","title":{"rendered":"Concrete cutting"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Concrete cutting refers to the targeted separation of concrete components by sawing or drilling methods, often using diamond-impregnated tools. It is used in refurbishment, selective deconstruction, strip-out, and new construction to create openings, separation cuts, or precise fit-ups. In practice, cutting is often combined with hydraulic <em>splitting<\/em> and <em>crushing<\/em> &#8211; for example, through the use of <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> from Darda GmbH &#8211; to detach components with low vibration, separate reinforcement, or break down segments into pieces that are easy to handle. When planned correctly, these low-vibration, low-dust workflows shorten shutdown times and protect adjacent structures.<\/p>\n<h2>Definition: What is meant by concrete cutting?<\/h2>\n<p>Concrete cutting encompasses all technical methods that shape, position, and size concrete, reinforced concrete, or prestressed concrete by separating processes. These include wall sawing, floor\/joint sawing, wire sawing, and <strong>core drilling<\/strong>. The aim is precise, controlled separation with minimal edge damage and the lowest possible vibration levels. The method is used for door and window openings, slab and ceiling openings, relief cuts, separation cuts in deconstruction, and for tie-ins to new components. In confined or sensitive environments, hydraulic procedures such as <em>concrete splitting<\/em> and <em>concrete crushing<\/em> with <strong>concrete pulverizers<\/strong> or <strong>rock wedge splitters<\/strong> from Darda GmbH are used alongside the cut to reduce cut depths, release components without load, and pick up reinforcing steel separately. Typical quality targets include square faces, defined kerf widths, narrow tolerances, and predictable segment weights that match the lifting concept.<\/p>\n<h2>Techniques and tools for concrete cutting<\/h2>\n<p>The choice of technique depends on component thickness, degree of reinforcement, accessibility, tolerance requirements, and environmental constraints. Multiple methods are often combined to balance precision, cost-effectiveness, and worker protection. Both hydraulically and electrically driven systems are used; the energy supply often comes from <strong>hydraulic power packs<\/strong> from Darda GmbH. Blade and wire selection is guided by aggregate hardness, steel content, and the required surface finish, while coolant and swarf management are planned to meet emission limits.<\/p>\n<ul>\n<li><strong>Selection parameters:<\/strong> cross-section and cut depth, reinforcement layout, cut geometry, water availability, power and hydraulic capacity, and required production rate.<\/li>\n<li><strong>Tooling aspects:<\/strong> diamond segment specification, wire bead spacing, blade diameter to arbor compatibility, and feed speed to prevent glazing and overheating.<\/li>\n<\/ul>\n<h3>Wall sawing and floor\/joint sawing<\/h3>\n<p>Wall saws run on rails and produce dimensionally accurate, square cuts in walls, slabs, and parapets. Floor\/joint saws are walk-behind units used to separate concrete slabs, industrial floors, or pavements. Wet cutting suppresses dust and cools the blade; dry cutting is used when water is limited but requires reinforced dust control. For edge-adjacent cuts, special blades and reduced blade diameters are common to avoid spalling. Attention to track alignment, plunge depth, and feed rate limits prevents blade pinching and thermal damage; soft starts and staged deepening improve straightness and blade life.<\/p>\n<h3>Diamond wire sawing<\/h3>\n<p>Wire saws are used for large cross-sections, irregular geometries, and restricted access, for example on bridge cantilevers, foundation blocks, or shafts. The flexible wire loops around the component, enabling large cut depths without disproportionate kerf width. When separating heavily reinforced components, planned segmentation is important to avoid load redistribution. Guide pulleys, proper pre-tensioning, and sufficient cooling water flow stabilize the cutting path; wire introduction holes are positioned to avoid rethreading and to maintain safe stand-off distances.<\/p>\n<h3>Core drilling and opening creation<\/h3>\n<p><strong>Core drilling<\/strong> produces round openings and also serves as a pre-operation for clean corners, anchor points, or as a stress-relief cut prior to actual sawing. Core samples provide information on concrete compressive strength and aggregates. For low-impact opening creation, core holes are set at the corners, the areas in between are sawn, and remaining sections are refined with <strong>concrete pulverizers<\/strong>. Rigs with vacuum bases or anchor plates ensure positional accuracy; angle adapters enable inclined penetrations for drainage, service routing, or dowel installation.<\/p>\n<h3>Complementary methods: concrete pulverizers and splitting technology<\/h3>\n<p><strong>Concrete pulverizers<\/strong> separate concrete by crushing and break down sawn segments into units suitable for transport. They reduce secondary damage, minimize vibration, and facilitate the separation of reinforcing steel. <strong>Stone and concrete splitters<\/strong> as well as <strong>rock wedge splitters<\/strong> create controlled crack patterns along predetermined lines; this reduces the required cut depths and cutting times. This combination is particularly efficient in <em>selective deconstruction<\/em> and during <em>interior demolition<\/em>. The sequencing of cuts and splits introduces defined relief so that components detach predictably and rigging remains within calculated load cases.<\/p>\n<h3>Steel separation and special deployments<\/h3>\n<p>Reinforcing steel must also be cut during concrete cutting. Here, <strong>steel shears<\/strong> and <strong>combination shears<\/strong> support rapid separation of reinforcement and embedded parts. In industrial plants with mixed structures, <strong>Multi Cutters<\/strong> and tank cutters from Darda GmbH are additionally used, for example when concrete foundations must be cut open and adjacent metal structures safely removed. Cold cutting methods limit ignition sources, reduce burr formation, and shorten the time required for subsequent handling and recycling.<\/p>\n<h3>Power supply and hydraulics<\/h3>\n<p>High-performance <strong>hydraulic power packs<\/strong> provide the energy for hydraulic cutting and splitting devices. Proper sizing of <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">high-performance hydraulic power units<\/a> prevents pressure drop, reduces heat build-up, and increases tool service life. Hose routing, leak-oil return, and coupling systems must be checked for tightness, cleanliness, and operability. Oil cleanliness, cooling capacity, and remote control ergonomics contribute to consistent feed rates and lower wear; regular filter changes and contamination checks protect sensitive valves and motors.<\/p>\n<h2>Application areas and typical use cases<\/h2>\n<p>Concrete cutting is established in many fields. In <em>concrete demolition and special demolition<\/em>, components are segmented, released in a controlled manner, and then reduced with <strong>concrete pulverizers<\/strong> or <strong>Multi Cutters<\/strong>. In <em>interior demolition and cutting<\/em>, the method creates openings for building services, elevators, emergency exit doors, and shafts. In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, wire sawing is combined with <strong>stone and concrete splitters<\/strong> to cleanly separate interfaces between natural stone and concrete structures. In <em>natural stone extraction<\/em>, <strong>rock wedge splitters<\/strong> complement thin separation cuts to release blocks to size. In <em>special deployments<\/em> &#8211; such as sensitive areas with strict vibration and noise limits &#8211; the interplay of cutting, splitting technology, and pulverizers reduces the load on the surroundings and personnel. Additional fields include infrastructure retrofit, machine foundation alterations, and facade opening enlargements under ongoing operations.<\/p>\n<h2>Planning, structural analysis, and building diagnostics<\/h2>\n<p>Careful preparation is crucial. Before starting, building documentation is reviewed, and reinforcement and utilities are located using radar, ferroscan, or core drilling. Load transfer and temporary <em>shoring<\/em> &#8211; especially for load-bearing components and prestressing &#8211; must be planned early. The cutting sequence, segment sizes, and lifting points are selected to exclude uncontrolled cracks, blade pinching, and hazards. For water-assisted cuts, sealing of penetrations and slurry collection must be taken into account. Method statements, permits, and coordination with site operations ensure that schedule, safety, and environmental constraints are met.<\/p>\n<h3>Recommendations for cut planning<\/h3>\n<ul>\n<li>Pre-drill at corners for stress relief and to prevent spalling.<\/li>\n<li>Segment into carryable or craneable elements; mark weight and center of gravity.<\/li>\n<li>Select a sequence that prevents unintended failure of remaining cross-sections.<\/li>\n<li>Plan reinforcement cuts and coordinate with <strong>steel shears<\/strong> and <strong>concrete pulverizers<\/strong>.<\/li>\n<li>Define water routing, slurry retention, and disposal in advance.<\/li>\n<li>Verify shoring capacity and clear exclusion zones before detaching segments.<\/li>\n<li>Confirm utility isolations and protective measures for adjacent finishes.<\/li>\n<\/ul>\n<h2>Quality, tolerances, and surfaces<\/h2>\n<p>Dimensional accuracy and edge quality determine the rework effort. Key criteria are square cut faces, minimal breakout, defined kerf width, and uniform surface roughness. For architectural concrete surfaces, protective cladding in the cut zone is advisable. Rework is performed with <em>fine cuts<\/em>, grinding, or targeted <em>nibbling<\/em> with <strong>concrete pulverizers<\/strong> to clean edges without weakening the reinforcement. Typical acceptance parameters include tolerance bands for opening size and plumbness, limits on microcracking, and specified surface textures for subsequent bonding or sealing.<\/p>\n<h2>Occupational safety, environmental, and health protection<\/h2>\n<p>Concrete cutting requires effective measures for dust, noise, and vibration reduction. Wet cutting binds quartz dust; at the same time, proper slurry capture and disposal must be organized. Personal protective equipment includes safety glasses, hearing protection, gloves, safety shoes, and suitable respiratory filters. Cutting areas must be cordoned off; falling or tipping of released segments is prevented by rigging and support beams. The specifications for allowable loads and the use of <strong>hydraulic power packs<\/strong> must follow the manufacturer\u2019s instructions from Darda GmbH. Legal requirements may vary by region and use case and must be observed in general. Additional controls address electrical protection for wet operations, hand-arm vibration exposure management, and temporary noise barriers to protect occupied areas.<\/p>\n<h2>Dismantling logistics and material flow<\/h2>\n<p>An efficient sequence reduces time and risks. After separation cuts are set, segments are released in a controlled manner, lowered, and further broken down in a material zone. <strong>Concrete pulverizers<\/strong> crush concrete, <strong>steel shears<\/strong> separate reinforcement; this allows material streams to be collected separately. Short routes, clear labeling, and coordination between the cutting crew and the lifting team ensure smooth progress. Defined material bays, protection of traffic routes, and contamination control keep handling times low and improve recycling yields.<\/p>\n<ol>\n<li>Secure access, expose utilities, and install protective measures.<\/li>\n<li>Locate reinforcement, define cutting sequence, specify lifting points.<\/li>\n<li>Pre-drill at corners, then make saw cuts and wire-sawn sections.<\/li>\n<li>Release the segment, lower it, and reduce with <strong>concrete pulverizers<\/strong> and <strong>Multi Cutters<\/strong>.<\/li>\n<li>Separate reinforcement with <strong>steel shears<\/strong>; remove streams separately.<\/li>\n<\/ol>\n<h2>Cost-effectiveness and selection criteria<\/h2>\n<p>The most economical solution depends on component thickness, reinforcement, accessibility, emission requirements, and schedule. Wall sawing is fast and precise at moderate depths; wire sawing is superior for large cross-sections; <strong>core drilling<\/strong> yields clean round openings. <strong>Stone and concrete splitters<\/strong> and <strong>concrete pulverizers<\/strong> reduce cutting times when they lower cut depths or rework. The availability of <strong>hydraulic power packs<\/strong>, water, power, and lifting equipment factors into the decision. Setup and changeover times, tooling wear rates, and disposal logistics influence unit costs as much as pure cutting speed.<\/p>\n<h2>Common mistakes and how to avoid them<\/h2>\n<p>Frequent issues include incomplete separations, saw blade pinching, uncontrolled cracking, inadequate segment securing, and unclear disposal routes. These risks are reduced by a clear cutting sequence, sufficient pre-drilling, timely relief cuts, and the combined use of <strong>concrete pulverizers<\/strong> and\/or <strong>rock wedge splitters<\/strong> for low-stress component release. Clean water routing and proactive slurry handling prevent delays. Further avoidances include conservative feed rates on unknown reinforcement patterns, maintaining spare tooling, and verifying lift plans against actual segment weights.<\/p>\n<h2>Distinction and interplay with splitting and crushing<\/h2>\n<p>Concrete cutting creates the dimensionally accurate separation joint. Splitting and pulverizer methods handle controlled release and size reduction. In combination, they yield precise, low-vibration workflows with high safety and minimal rework &#8211; especially in the fields of <em>concrete demolition and special demolition<\/em>, <em>interior demolition and cutting<\/em>, <em>rock excavation and tunnel construction<\/em>, <em>natural stone extraction<\/em>, and <em>special deployment<\/em>. The coordinated use of <strong>concrete pulverizers<\/strong>, <strong>stone and concrete splitters<\/strong>, <strong>hydraulic power packs<\/strong>, <strong>combination shears<\/strong>, and complementary cutting techniques from Darda GmbH can support precise and controlled project execution when selected for the project-specific task. Selecting the right interplay reduces kerf length, limits exposure, and accelerates recycling by delivering cleanly separated material streams.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Concrete cutting refers to the targeted separation of concrete components by sawing or drilling methods, often using diamond-impregnated tools. It is used in refurbishment, selective deconstruction, strip-out, and new construction to create openings, separation cuts, or precise fit-ups. In practice, cutting is often combined with hydraulic splitting and crushing &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18980","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Cutting in Construction - Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Precision openings by sawing &amp; drilling \u2713 Concrete cutting for walls, slabs &amp; foundations with minimal vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Cutting in Construction - Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Precision openings by sawing &amp; drilling \u2713 Concrete cutting for walls, slabs &amp; foundations with minimal vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:05+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-cutting\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-cutting\",\"name\":\"Concrete Cutting in Construction - Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-24T06:39:22+00:00\",\"dateModified\":\"2026-09-12T17:53:05+00:00\",\"description\":\"Precision openings by sawing & drilling \u2713 Concrete cutting for walls, slabs & foundations with minimal vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-cutting#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-cutting\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-cutting#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Concrete cutting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Cutting in Construction - Methods & Tools","description":"Precision openings by sawing & drilling \u2713 Concrete cutting for walls, slabs & foundations with minimal vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting","og_locale":"en_US","og_type":"article","og_title":"Concrete Cutting in Construction - Methods & Tools","og_description":"Precision openings by sawing & drilling \u2713 Concrete cutting for walls, slabs & foundations with minimal vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:05+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting","url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting","name":"Concrete Cutting in Construction - Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-24T06:39:22+00:00","dateModified":"2026-09-12T17:53:05+00:00","description":"Precision openings by sawing & drilling \u2713 Concrete cutting for walls, slabs & foundations with minimal vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-cutting#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Concrete cutting"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18980"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18980\/revisions"}],"predecessor-version":[{"id":29072,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18980\/revisions\/29072"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}