{"id":18978,"date":"2025-10-24T12:22:41","date_gmt":"2025-10-24T10:22:41","guid":{"rendered":"https:\/\/www.darda.de\/concrete-deconstruction"},"modified":"2026-03-26T11:25:03","modified_gmt":"2026-03-26T10:25:03","slug":"concrete-deconstruction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction","title":{"rendered":"Concrete deconstruction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Concrete deconstruction describes the controlled removal, separation, and extraction of concrete components in buildings, civil engineering structures, and infrastructure. The goal is a safe, plannable, and low-emission approach that equally considers structural analysis, building physics, material separation, and logistics. In practice, the spectrum ranges from selective deconstruction of individual component layers to the complete demolition of massive structures. Tool systems such as <strong>concrete pulverizers<\/strong>, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong>, as well as hydraulically driven cutting and splitting technology are used across different phases and fields of application.<\/p>\n<h2>Definition: What is meant by concrete deconstruction?<\/h2>\n<p>Concrete deconstruction refers to the professional and planned dismantling, splitting, crushing, and removal of concrete components, often taking into account reinforcement steel and embedded parts. The deconstruction is carried out <em>selectively<\/em> (materially separated and section-by-section), <em>controlled<\/em> (verified for structural and occupational safety), and as <em>low-vibration<\/em> and <em>noise-reduced<\/em> as possible. Depending on component thickness, degree of reinforcement, accessibility, and environmental requirements, different methods are used &#8211; from hydraulic splitting and jaw and shear crushing to sawing and drilling techniques as preparatory separation steps. Where applicable, conformity with structural specifications, local approvals, and disposal regulations is ensured.<\/p>\n<h2>Methods and procedures in concrete deconstruction<\/h2>\n<p>The choice of method is based on the objective, surroundings, and component parameters. In practice, methods are combined to coordinate cuts, detachment, and size reduction efficiently. Proper sequencing minimizes tool wear, limits emissions, and stabilizes load paths during dismantling.<\/p>\n<h3>Hydraulic splitting<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> and <strong>rock splitting cylinders<\/strong> generate high splitting forces via wedges in the borehole and open controlled cracks. This method is particularly suitable for massive, compression-resistant components and rock when vibrations and noise must be limited. It is often used in foundations, thick walls, in tunnel construction, and where access is restricted. The power supply is provided by <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a><\/em>, whose pressure and flow rate must match the required splitting force.<\/p>\n<ul>\n<li><strong>Borehole layout:<\/strong> Diameter, depth, and spacing define crack initiation and direction.<\/li>\n<li><strong>Crack management:<\/strong> Pre-cuts and relief openings guide fractures and protect adjacent components.<\/li>\n<li><strong>Access and safety:<\/strong> Use mechanical retention and exclusion zones when pieces may release suddenly.<\/li>\n<\/ul>\n<h3>Crushing and cutting with jaws and shears<\/h3>\n<p><strong>Concrete pulverizers<\/strong> crush concrete through high closing forces and simultaneously separate reinforcement steel via integrated blades. <em>Combination shears<\/em>, <em>multi cutters<\/em>, and <em>steel shears<\/em> broaden the range for mixed constructions, reinforced concrete with high reinforcement content, or when cutting profiles. The selection is based on jaw opening, blade geometry, pressure stage, and the ratio of concrete thickness to reinforcement diameter. Carrier compatibility, hydraulic interfaces, and tool change times additionally influence productivity on site.<\/p>\n<h3>Preparatory separation cuts and pilot drilling<\/h3>\n<p>Wire saws, wall saws, and core drilling create contour-precise joints, openings, and edges to separate components by cutting before they are reduced to manageable pieces with concrete pulverizers or splitting technology. The combination reduces uncontrolled crack formation and enables defined demolition edges. Diamond tools require coordinated cooling and slurry management to maintain cut quality and reduce dust.<\/p>\n<h3>Special methods and special operations<\/h3>\n<p>In sensitive areas &#8211; such as at facilities with utility lines or in existing buildings with vibration limits &#8211; low-vibration approaches are prioritized. <em>Tank cutters<\/em> and <em>steel shears<\/em> are additionally used when metallic tanks, beams, or inserts have to be removed in deconstruction projects. Remote-controlled equipment and shielding measures increase safety in constrained or hazardous zones.<\/p>\n<h2>Material, component, and structural analysis: fundamentals for method selection<\/h2>\n<p>Material and construction details are crucial for robust planning. Only then can forces, cutting sequences, and safeguards be dimensioned appropriately.<\/p>\n<ul>\n<li><strong>Concrete strength and structure:<\/strong> Compressive strength, aggregates, moisture, and age influence splitting and fracture behavior.<\/li>\n<li><strong>Reinforcement:<\/strong> Position, diameter, mesh\/single layers, lap splices, anchors. High reinforcement levels favor concrete pulverizers and shears.<\/li>\n<li><strong>Prestressing:<\/strong> Prestressing systems require special caution; controlled stress release and cutting sequence are critical.<\/li>\n<li><strong>Component geometry:<\/strong> Thickness, slenderness, supports, bond to adjacent components; influences borehole pattern when splitting and jaw access.<\/li>\n<li><strong>Environmental conditions:<\/strong> Vibration limits, noise protection, dust, accessibility, utility lines, fire protection.<\/li>\n<\/ul>\n<p>Non-destructive testing such as cover depth measurements, ground penetrating radar, rebound hammer checks, and selective exposure through pilot cores improves certainty. Findings are documented in method statements and incorporated into the deconstruction sequence.<\/p>\n<h2>Selection of tools: pulverizer or splitter?<\/h2>\n<p>The decision is based on target values such as component thickness, reinforcement ratio, tolerance for vibrations, and on-site logistics. Both methods are often combined. Short trials on representative areas reduce uncertainty and optimize settings.<\/p>\n<ol>\n<li><strong>High reinforcement, moderately thick components:<\/strong> Concrete pulverizers and combination shears, possibly after a prior saw cut.<\/li>\n<li><strong>Massive, lightly reinforced components:<\/strong> Rock and concrete splitters with a tightly spaced borehole pattern; follow-up breaking with a concrete pulverizer.<\/li>\n<li><strong>Confined access:<\/strong> Compact jaws or splitting cylinders with suitable hydraulic power packs, if necessary modular designs.<\/li>\n<li><strong>Sensitivity to vibration and noise:<\/strong> Split and saw; jaws with controlled strokes and reduced impact share.<\/li>\n<li><strong>Prestressed members:<\/strong> Prefer sawing and controlled destressing; apply splitting or crushing only after verification and safeguarding.<\/li>\n<\/ol>\n<h2>Application areas and typical use cases<\/h2>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>:<\/strong> Selective removal of slabs, walls, and foundations; combination of separation cuts, concrete pulverizers, and splitters.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Removal of non-load-bearing components, openings in slabs\/walls; precise cuts and subsequent size reduction for transport.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Splitting cylinders for rock and high-strength concretes; controlled crack guidance with minimal vibration.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Splitting along natural joints; wedges and cylinders for producing manageable blocks.<\/li>\n<li><strong>Special operations:<\/strong> Work in sensitive zones, under time or emission constraints; additionally cutting steel with steel shears or tank cutters.<\/li>\n<li><strong>Bridge and infrastructure refurbishments:<\/strong> Defined removal of decks, curbs, and abutment sections with strict vibration and noise caps.<\/li>\n<\/ul>\n<h2>Workflow in controlled deconstruction<\/h2>\n<p>A robust process chain reduces risks and increases efficiency. In practice, the following sequence has proven itself:<\/p>\n<ol>\n<li><strong>Investigation and exposure:<\/strong> Review drawings, locate utilities, check reinforcement layout, expose the component.<\/li>\n<li><strong>Temporary stabilization:<\/strong> Shoring, hangers, protection against falling parts.<\/li>\n<li><strong>Separation cuts\/drilling:<\/strong> Saw contours, set core drillings, lay out borehole patterns for splitters.<\/li>\n<li><strong>Size reduction:<\/strong> Concrete pulverizers for crushing and steel separation; splitting cylinders for controlled crack formation.<\/li>\n<li><strong>Material logistics:<\/strong> Secure sections, lift off, transport; store by material type.<\/li>\n<li><strong>Fine deconstruction:<\/strong> Remove residual concrete, finish edges, prepare the surface.<\/li>\n<li><strong>Verification and handover:<\/strong> Measure tolerances, record emissions, update documentation, and clear work areas.<\/li>\n<\/ol>\n<h2>Emissions, occupational safety, and environmental protection<\/h2>\n<p>Vibrations, noise, dust, and water must be centrally controlled. A coordinated method reduces environmental impacts and protects workers and surroundings.<\/p>\n<ul>\n<li><strong>Noise and vibration:<\/strong> Splitting and jaw work are typically quieter and lower-vibration than impact methods.<\/li>\n<li><strong>Dust:<\/strong> Wet cutting, point extraction, defined fracture edges; do not allow material to break uncontrollably.<\/li>\n<li><strong>Water\/slurry:<\/strong> Collect, filter, dispose of properly.<\/li>\n<li><strong>Occupational safety:<\/strong> Crushing and cutting hazards, pressure energy, load handling; safe standing areas and barriers.<\/li>\n<\/ul>\n<p>Permits, neighborhood communication plans, and adherence to exposure limits are integrated into planning. Monitoring is performed with calibrated devices and documented for verification.<\/p>\n<h2>Material separation, recycling, and disposal<\/h2>\n<p>Source-separated sorting is the basis for high recycling rates. Concrete pulverizers enable the exposure of reinforcement steel, which is then sized with <em>steel shears<\/em>. Splitting methods often produce coarse, low-steel pieces that are well suited for crushing and screening technology. Recyclates can be used as recycled construction material, provided quality requirements are met.<\/p>\n<ul>\n<li><strong>Quality criteria:<\/strong> Target grain curves, chloride limits, and contaminant thresholds determine reuse options.<\/li>\n<li><strong>Contaminants:<\/strong> Asphalt residues, coatings, and inclusions are identified early and routed to approved treatment.<\/li>\n<li><strong>Traceability:<\/strong> Loads are labeled by origin and material class to ensure closed-loop documentation.<\/li>\n<\/ul>\n<h2>Hydraulic power packs: sizing and operation<\/h2>\n<p>Powerful <strong>hydraulic power packs<\/strong> provide the required pressure and flow for jaws, splitting cylinders, multi cutters, and shears. Important parameters are operating pressure, delivery rate, temperature management, and the energy supply on site. Proper sizing prevents performance loss, reduces cycle times, and keeps oil temperatures in the optimal range.<\/p>\n<ul>\n<li><strong>Hydraulic layout:<\/strong> Hose length and cross-section limit pressure drop; quick-couplers must match flow.<\/li>\n<li><strong>Filtration and cooling:<\/strong> Observe cleanliness classes and cooling capacity under peak loads.<\/li>\n<li><strong>Energy strategy:<\/strong> Coordinate electrical, combustion, or hybrid supply with site constraints.<\/li>\n<li><strong>Cold and heat management:<\/strong> Use warm-up routines and thermal shields to protect seals and media.<\/li>\n<\/ul>\n<h2>Technical key parameters for practice<\/h2>\n<ul>\n<li><strong>Pressing and splitting forces:<\/strong> determine the component thickness that can be economically reduced in size.<\/li>\n<li><strong>Jaw opening\/wedge length:<\/strong> defines which cross-sections can be reached.<\/li>\n<li><strong>Blade geometry and steel cutting capacity:<\/strong> decisive with a high reinforcement content.<\/li>\n<li><strong>Weight and design:<\/strong> affect handling, fastening, and use in confined zones.<\/li>\n<li><strong>Pressure and flow window:<\/strong> match tool requirements to the available hydraulic supply.<\/li>\n<li><strong>Borehole diameter and spacing:<\/strong> key for crack initiation and energy input when splitting.<\/li>\n<li><strong>Piece size and lift concept:<\/strong> govern rigging, transport routes, and cycle times.<\/li>\n<\/ul>\n<h2>Maintenance, operational safety, and service life<\/h2>\n<p>Regular inspection of blades, wedges, seals, and couplings maintains performance and reduces downtime. Clean hydraulic oil, filtered media, and correctly routed hose systems are essential. Replace wear parts in good time, observe torque values, and document test runs.<\/p>\n<ul>\n<li><strong>Intervals:<\/strong> Daily functional checks, weekly bolt and fastener control, periodic pressure and flow tests.<\/li>\n<li><strong>Wear tracking:<\/strong> Measure blade openings, wedge wear, and jaw play; mark torques after reassembly.<\/li>\n<li><strong>Spare concept:<\/strong> Keep seal kits, blades, and couplings on site to minimize delays.<\/li>\n<\/ul>\n<h2>Challenges and solution approaches in existing structures<\/h2>\n<ul>\n<li><strong>Uncertain reinforcement:<\/strong> Probe, create openings, choose an adaptive method (saw first, then jaws\/splitting).<\/li>\n<li><strong>Confined access:<\/strong> compact tools, modular hydraulic power packs, segmented dismantling.<\/li>\n<li><strong>Vibration-sensitive neighborhood:<\/strong> prioritize splitters, tighten cutting sequences, reduce piece weights.<\/li>\n<li><strong>High reinforcement densities:<\/strong> concrete pulverizers with high steel cutting capacity, additionally steel shears.<\/li>\n<li><strong>Substances and coatings:<\/strong> assess hazardous or brittle layers and adjust cutting, dust control, and disposal routes.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>A consistent record of cuts, load paths, tool parameters, and disposal routes improves verification and reproducibility. Measurements of vibrations and noise as well as photo documentation of the work steps support assessment and optimization.<\/p>\n<ul>\n<li><strong>Method statements:<\/strong> Define sequences, hold points, and acceptance criteria.<\/li>\n<li><strong>Monitoring:<\/strong> Thresholds for vibration, noise, and dust with alert levels and corrective actions.<\/li>\n<li><strong>As-built records:<\/strong> Update plans after each phase to reflect residual structures and interfaces.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Concrete deconstruction describes the controlled removal, separation, and extraction of concrete components in buildings, civil engineering structures, and infrastructure. The goal is a safe, plannable, and low-emission approach that equally considers structural analysis, building physics, material separation, and logistics. In practice, the spectrum ranges from selective deconstruction of individual component <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18978","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Deconstruction - Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Learn about concrete deconstruction for buildings &amp; infrastructure \u2713 Low vibration methods, tool selection, recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Deconstruction - Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Learn about concrete deconstruction for buildings &amp; infrastructure \u2713 Low vibration methods, tool selection, recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-26T10:25:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-deconstruction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-deconstruction\",\"name\":\"Concrete Deconstruction - Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-24T10:22:41+00:00\",\"dateModified\":\"2026-03-26T10:25:03+00:00\",\"description\":\"Learn about concrete deconstruction for buildings & infrastructure \u2713 Low vibration methods, tool selection, recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-deconstruction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-deconstruction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-deconstruction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Concrete deconstruction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Deconstruction - Methods & Tools","description":"Learn about concrete deconstruction for buildings & infrastructure \u2713 Low vibration methods, tool selection, recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction","og_locale":"en_US","og_type":"article","og_title":"Concrete Deconstruction - Methods & Tools","og_description":"Learn about concrete deconstruction for buildings & infrastructure \u2713 Low vibration methods, tool selection, recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-26T10:25:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction","url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction","name":"Concrete Deconstruction - Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-24T10:22:41+00:00","dateModified":"2026-03-26T10:25:03+00:00","description":"Learn about concrete deconstruction for buildings & infrastructure \u2713 Low vibration methods, tool selection, recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-deconstruction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Concrete deconstruction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18978"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18978\/revisions"}],"predecessor-version":[{"id":25694,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18978\/revisions\/25694"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}