{"id":18973,"date":"2025-10-25T10:33:28","date_gmt":"2025-10-25T08:33:28","guid":{"rendered":"https:\/\/www.darda.de\/concrete-slab"},"modified":"2026-03-26T08:59:02","modified_gmt":"2026-03-26T07:59:02","slug":"concrete-slab","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab","title":{"rendered":"Concrete slab"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The concrete slab is a central load-bearing member in building and structural engineering. It transfers loads from use, self-weight, and actions such as wind or earthquakes to walls, columns, and beams. In design, construction, service, repair, and deconstruction it imposes particular demands on <strong>structural analysis<\/strong>, <strong>building physics<\/strong>, and site workflow. In practice-oriented projects &#8211; from building gutting to selective <em><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a><\/em> &#8211; different hydraulic tools are used depending on the task. These include, for example, <em>concrete demolition shear<\/em> for controlled nibbling of component edges or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> for low-vibration widening of targeted separation cracks, especially for local <em>ceiling opening<\/em> in slabs. Increasingly, <strong>emission control<\/strong> and <strong>resource efficiency<\/strong> influence method selection across the slab life cycle.<\/p>\n<h2>Definition: What is a concrete slab?<\/h2>\n<p>A concrete slab is a planar, usually reinforced concrete or prestressed concrete horizontal or slightly inclined plate that resists bending moments and shear force and transfers loads to its supports. It can be executed as a cast-in-place concrete slab, a semi-precast slab (e.g., filigree slab with in-situ topping), or a precast floor slab (e.g., hollow-core). The structural action is one-way or two-way, depending on support conditions, geometry, and reinforcement layout. Key verifications include bending load-bearing capacity, shear and punching shear resistance, as well as serviceability (deflections, crack widths, vibrations). The concrete cover protects the reinforcement against corrosion and fire damage and is decisive for durability. Typical slab thicknesses range from low to medium double-digit millimeters for short spans to several hundred millimeters for high loads or long spans, with span-to-depth ratios governed by stiffness and serviceability.<\/p>\n<h2>Composition, structural behavior, and types of concrete slabs<\/h2>\n<p>The structural composition includes formwork or precast elements, reinforcement (bottom and top layers, punching shear reinforcement, edge and support reinforcement), possible prestressing, and the concrete with suitable consistency, concrete compressive strength class, and resistance to exposure. The slab or ceiling thickness is governed by span, imposed load, building acoustics, fire protection, and routing of services. Durable solutions consider <strong>exposure classes<\/strong>, crack control, and detailing of joints and penetrations to limit ingress of moisture or chlorides.<\/p>\n<h3>Common types<\/h3>\n<ul>\n<li>Cast-in-place concrete slabs: free-form, flexible in plan; good detailing of connections.<\/li>\n<li>Semi-precast slabs (e.g., filigree plates with cast-in-place topping): rapid erection, defined soffit.<\/li>\n<li>Precast floor slabs (solid and hollow): high prefabrication, short construction time.<\/li>\n<li>Prestressed concrete slabs: reduced deflection, larger spans, increased crack control.<\/li>\n<li>Voided or ribbed systems (e.g., hollow-core, waffle): material savings with directional load paths; attention to webs and shear transfer.<\/li>\n<\/ul>\n<h3>Load and deformation behavior<\/h3>\n<p>The structural behavior is determined by the supports (line or point), slab geometry, and stiffness distribution. Besides design for bending and shear, <strong>punching shear resistance<\/strong> at columns is a critical node. For serviceability, crack width limitation, deformation, and vibration comfort are decisive, especially for slender slabs and sensitive uses. Long-term effects such as <em>creep and shrinkage<\/em> influence deflection and crack development and must be reflected in reinforcement layout, detailing at restraints, and joint planning.<\/p>\n<h2>Planning, execution, and quality assurance<\/h2>\n<p>Execution requires a coordinated sequence: formwork and edge formwork, placing the reinforcement, integrating openings, concrete placement and compaction, concrete curing, and striking. Quality characteristics are dimensional accuracy, concrete cover, surface quality, and adherence to curing times. Robust <strong>inspection and test plans<\/strong> with hold points for reinforcement checks, cover and bar diameter verification, and curing records help to secure predictable serviceability and durability.<\/p>\n<h3>Openings and embedded items<\/h3>\n<p>Openings for installations should be planned early to avoid uncontrolled weakening. For subsequent penetrations, core drilling, handheld separation cuts, and subsequent removal of remaining webs are often combined. Where low vibration levels, small <em>edge distance<\/em>, or limited accessibility are required, <em>hydraulic splitter<\/em> can be used as a complementary technique to introduce controlled cracks and separate the member with low load input. Prior to cutting, reinforcement and potential prestressing should be located by suitable non-destructive testing to prevent unintended severing of critical steel.<\/p>\n<h2>Subsequent openings and selective deconstruction in concrete slabs<\/h2>\n<p>In alterations and building gutting, slabs often need adaptation &#8211; for shafts, stair <em>ceiling opening<\/em>, or new service routes. The approach depends on structural analysis, reinforcement layout, member thickness, accessibility, and emission requirements. A defined sequence of support, separation, removal, and waste handling minimizes risk to adjacent components and ongoing operations.<\/p>\n<h3>Methods and tool selection<\/h3>\n<ul>\n<li>Cutting and drilling methods: separation cuts and core drilling define the contour and minimize edge damage.<\/li>\n<li>Hydraulic removal: <strong>concrete demolition shear<\/strong> allows controlled nibbling, e.g., for edge removal or creating smooth chamfers at edges.<\/li>\n<li>Splitting technique: <strong>hydraulic splitter<\/strong> creates targeted crack formation with low vibration levels, helpful for thick slabs, connection details, or near sensitive structures.<\/li>\n<li>Resorting and metal separation: in steel-rich zones, combination tools, multi cutters, and <em>steel shear<\/em> support clean separation of reinforcement and embedded items.<\/li>\n<li>Ancillary measures: temporary <em>shoring<\/em>, debris protection, and dust suppression secure safe and low-emission execution.<\/li>\n<\/ul>\n<h3>Typical applications<\/h3>\n<ul>\n<li><em>Concrete demolition<\/em> and <em>special demolition<\/em>: selective removal of slab segments through constrained access.<\/li>\n<li>Building gutting and cutting: openings in existing slabs during ongoing use with strict emission requirements.<\/li>\n<li>Special operations: working on slab edges in contaminant-sensitive areas with controlled splitting technique.<\/li>\n<li>Change of use: adaptations for new load paths or service routes with staged separation and controlled removal.<\/li>\n<\/ul>\n<h3>Procedure for a local ceiling opening (general)<\/h3>\n<ol>\n<li>Structural assessment of the slab and plan temporary <em>shoring<\/em>\/supports.<\/li>\n<li><em>Exposure of utilities<\/em>, survey of the opening, definition of cut or drilling contours.<\/li>\n<li>Pre-drill at corners to reduce stresses, then perform contour cuts.<\/li>\n<li>Segmented removal: depending on conditions, use <em>concrete demolition shear<\/em> for edges, <em>hydraulic splitter<\/em> for remaining webs.<\/li>\n<li>Separate and recover the reinforcement with suitable cutting tools, orderly <em>disposal<\/em>\/<em>recycling<\/em>.<\/li>\n<li>Edge treatment and protection: round sharp edges, install temporary barriers, and prepare interfaces for subsequent works.<\/li>\n<li>Documentation: as-built records of reinforcement, cuts, and emissions control for quality and compliance.<\/li>\n<\/ol>\n<h2>Maintenance, damage, and repair of concrete slabs<\/h2>\n<p>Typical damage patterns include cracks due to restraint or overload, concrete carbonation with reinforcement corrosion, chloride contamination, spalling, and punching failures at columns. Early detection is via visual inspections, cover measurements, potential mapping, and <em>concrete cores (specimens)<\/em>. Rehabilitation strategies range from <em>crack injection<\/em> and concrete repair to structural reinforcement (e.g., overlay concrete, CFRP laminates) and local load redistribution. Depending on exposure, <em>freeze-thaw<\/em> damage, alkali-silica reaction, and fatigue may need consideration, supported by non-destructive testing and targeted material sampling.<\/p>\n<h3>Renovation-friendly dismantling<\/h3>\n<p>For material-separated deconstruction and hazardous substance remediation, a selective, low-damage approach is advantageous. Tools with precise force control such as <em>concrete demolition shear<\/em> help remove only what is necessary, while <em>hydraulic splitter<\/em> facilitates controlled separation of segments and reduces the risk of consequential damage. Benefits include reduced vibration, lower dust generation with appropriate suppression, and improved downstream sorting quality.<\/p>\n<h2>Fire protection, acoustics, and building physics<\/h2>\n<p>By design, concrete slabs provide good fire protection, which, however, depends on concrete cover, reinforcement position, and penetrations. Building acoustics and impact sound may require floating screeds and suitable flanking details. Thermal boundary conditions influence restraint and crack formation; controlled joints and proper concrete curing minimize early damage. Firestopping of penetrations and airtight interfaces are integral to maintain resistance ratings and acoustic performance.<\/p>\n<h2>Special aspects of prestressed slabs and precast systems<\/h2>\n<p>With prestressed or voided construction (e.g., hollow-core, partial advancement), interventions must be planned particularly carefully. Drilling and cutting must not compromise prestressing steel and webs. For removing edge zones, controlled methods are suitable; <strong>concrete demolition shear<\/strong> and splitting techniques can, in combination with cut-guided methods, make the intervention safe and sectional. Documentation of tendon courses and manufacturer data, complemented by scanning, mitigates the risk of unintentional strand severance.<\/p>\n<h2>Occupational safety, environment, and emissions<\/h2>\n<p>When working on concrete slabs, dust, noise, low vibration levels, and falling debris must be controlled. Proven measures include dust-reduced methods, <em>dust extraction<\/em>, water-assisted cutting, <em>safety distance<\/em>, and <em>load distribution<\/em> measures. Hydraulically driven tools &#8211; supplied via <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em> &#8211; enable sensitive force control and reduce vibration and secondary damage in many applications. Exposure to respirable crystalline silica requires effective capture and PPE, and waste must be classified and handled in line with applicable environmental rules.<\/p>\n<h2>Tool and method selection in the context of concrete slabs<\/h2>\n<p>The choice of technique depends on slab thickness, degree of reinforcement, edge distance, accessibility, required cut quality, and operational restrictions. Clear selection criteria and trial cuts in non-critical zones can validate assumptions before full execution.<\/p>\n<ul>\n<li><strong>Concrete demolition shear<\/strong>: targeted edge nibbling, segment removal, good control indoors.<\/li>\n<li><strong>Hydraulic splitter<\/strong>: low vibration levels, suitable for remaining webs, massive zones, and sensitive areas.<\/li>\n<li>Multi cutters and hydraulic shear: flexible separation for composite members or inserts.<\/li>\n<li><em>Steel shear<\/em>: efficient separation of reinforcing steel and steel sections after concrete removal.<\/li>\n<li><em>Hydraulic power pack<\/em>: energy supply for the tools with demand-oriented parameters.<\/li>\n<\/ul>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>Selective deconstruction of concrete slabs facilitates construction waste separation of concrete and steel and increases the <em>recycling rate<\/em>. Section-by-section removal, e.g., with <em>concrete demolition shear<\/em> and splitting techniques, reduces fines and improves the quality of recycled aggregates. Short transport routes, low-emission methods, and reuse of components promote resource-efficient project execution. Early deconstruction planning and digital material documentation support circularity and verifiable outcomes.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Unplanned openings without structural analysis: leads to inadmissible deformations or punching issues.<\/li>\n<li>Insufficient concrete curing: favors early shrinkage cracks and edge spalling.<\/li>\n<li>Uncontrolled demolition forces: risky vibrations, damage to adjacent members; controlled hydraulic methods prevent this.<\/li>\n<li>Inadequate assessment of dust and noise: impairs workflow and use; early emissions planning is essential.<\/li>\n<li>Overlooking prestressing or critical reinforcement: requires prior detection to avoid severe damage.<\/li>\n<li>Missing temporary support or inadequate sequencing: increases collapse risk during partial deconstruction.<\/li>\n<\/ul>\n<h2>Application areas of Darda GmbH tools in the context of concrete slabs<\/h2>\n<p>In projects around the concrete slab &#8211; from <em>concrete demolition<\/em> and <em>special demolition<\/em> to <em>building gutting<\/em> and cutting to <em>special operations<\/em> &#8211; different hydraulic solutions from Darda GmbH come into play depending on the task. While <strong>concrete demolition shear<\/strong> and <strong>hydraulic splitter<\/strong> form the core of slab-related work, <em>hydraulic power pack<\/em>, hydraulic shear, multi cutters, and <em>steel shear<\/em> complement the processes, for example when separating reinforcing steel or during deconstruction of adjacent steel construction. In special cases &#8211; such as complex systems and installations &#8211; additional tools from Darda GmbH support an orderly, safe, and material-efficient execution. Competent planning, qualified operation, and consistent maintenance of equipment are decisive for predictable results and reduced emissions.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The concrete slab is a central load-bearing member in building and structural engineering. It transfers loads from use, self-weight, and actions such as wind or earthquakes to walls, columns, and beams. In design, construction, service, repair, and deconstruction it imposes particular demands on structural analysis, building physics, and site workflow. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18973","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Slab | Structural Design, Types &amp; Methods<\/title>\n<meta name=\"description\" content=\"Expert insights on concrete slab design for structural engineering \u2713 types, openings &amp; selective deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Slab | Structural Design, Types &amp; Methods\" \/>\n<meta property=\"og:description\" content=\"Expert insights on concrete slab design for structural engineering \u2713 types, openings &amp; selective deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-26T07:59:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-slab\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-slab\",\"name\":\"Concrete Slab | Structural Design, Types & Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-25T08:33:28+00:00\",\"dateModified\":\"2026-03-26T07:59:02+00:00\",\"description\":\"Expert insights on concrete slab design for structural engineering \u2713 types, openings & selective deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-slab#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-slab\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-slab#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Concrete slab\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Slab | Structural Design, Types & Methods","description":"Expert insights on concrete slab design for structural engineering \u2713 types, openings & selective deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab","og_locale":"en_US","og_type":"article","og_title":"Concrete Slab | Structural Design, Types & Methods","og_description":"Expert insights on concrete slab design for structural engineering \u2713 types, openings & selective deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-26T07:59:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab","url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab","name":"Concrete Slab | Structural Design, Types & Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-25T08:33:28+00:00","dateModified":"2026-03-26T07:59:02+00:00","description":"Expert insights on concrete slab design for structural engineering \u2713 types, openings & selective deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/concrete-slab"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-slab#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Concrete slab"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18973","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18973"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18973\/revisions"}],"predecessor-version":[{"id":25686,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18973\/revisions\/25686"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}