{"id":18969,"date":"2025-10-25T11:53:53","date_gmt":"2025-10-25T09:53:53","guid":{"rendered":"https:\/\/www.darda.de\/concrete-demolition"},"modified":"2026-03-26T17:07:03","modified_gmt":"2026-03-26T16:07:03","slug":"concrete-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition","title":{"rendered":"Concrete demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Concrete demolition refers to the planned, controlled deconstruction of structures, components, and foundations made of reinforced or plain concrete. The focus is on precision, occupational safety, and the protection of adjacent structures. Depending on the task, different methods are used &#8211; from non-explosive splitting and crushing with hydraulic shears to selective cutting. In urban environments, low-vibration approaches, low emissions, and efficient demolition separation of materials are becoming increasingly important. In this context, <em>concrete demolition shear<\/em> as well as stone and concrete <em>hydraulic wedge splitters<\/em> play a central role, complemented by <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">high-performance hydraulic power units<\/a><\/em> and specialized cutting and shearing tools. The goal is always economical, safe, and material-appropriate deconstruction with a high recycling rate. Additional planning objectives include low dust loads, compliance with noise and vibration thresholds, and a workflow that supports source-separated collection of concrete, steel, and ancillary materials.<\/p>\n<h2>Definition: What is meant by concrete demolition?<\/h2>\n<p>Concrete demolition encompasses all technical methods for orderly removal, separation, and size reduction of concrete elements &#8211; from strip-out through lifting individual segments to complete dismantling. The term includes mechanical, hydraulic, and cutting methods, including preparatory steps (surveying, drilling, exposing reinforcement) as well as downstream processes (sorting, recycling). A defining feature is the adaptation of the approach to structural analysis, member thickness, reinforcement density, vibration and noise limits. In specialist deconstruction, particularly low-emission and low-vibration methods are preferred, such as non-explosive splitting using <strong>hydraulic wedge splitters<\/strong> or controlled nibbling of component edges with <strong>concrete demolition shear<\/strong>. In practice, the scope covers building and civil engineering structures alike and is implemented according to verified stability, temporary support concepts, and documented method statements.<\/p>\n<h2>Methods and procedures in concrete demolition<\/h2>\n<p>There are three fundamental approaches in concrete demolition: first, mechanical breaking\/crushing (e.g., with concrete demolition shear, combination shears, multi cutters); second, hydraulic splitting (hydraulic wedge splitters, rock wedge splitters); and third, cutting separation (e.g., sawing and drilling as preparatory measures, combined with steel shears or tank cutters for metallic inserts). Selection is based on criteria such as member thickness, reinforcement ratio, accessibility, permissible vibration, noise control, and time windows. <em>Hydraulic power packs<\/em> provide the required energy for mobile handheld tools and attachments. While demolition shears nibble the structure in a controlled manner and expose reinforcement, splitting cylinders induce targeted crack propagation with minimal vibration input &#8211; ideal in existing buildings, sensitive areas, and for selective openings.<\/p>\n<ul>\n<li><strong>Mechanical crushing:<\/strong> rapid material removal and direct access to rebars, best for segmented dismantling and edge reduction.<\/li>\n<li><strong>Hydraulic splitting:<\/strong> crack induction along defined lines with very low vibration and minimal secondary damage to adjacent assemblies.<\/li>\n<li><strong>Cutting separation:<\/strong> dimensional accuracy and clean interfaces, enabling lifting and transport with predictable loads.<\/li>\n<\/ul>\n<h2>Tools and equipment at a glance<\/h2>\n<h3>Concrete demolition shear<\/h3>\n<p>Concrete demolition shears are hydraulic tools for removing edges, slabs, and columns as well as preparing separation cuts. They break concrete in a controlled manner and enable the exposure and subsequent cutting of reinforcement in downstream steps. In confined spaces and during strip-out, they excel through precise work and reduced vibration input. Modern variants offer optimized jaw geometry, rotation for approach accuracy, and metered bite forces for minimal edge spalling. Water-assisted operation and correct tool positioning further reduce dust and improve cut quality at interfaces.<\/p>\n<h3>Hydraulic wedge splitters<\/h3>\n<p>Hydraulic wedge splitters act via wedges or pistons inserted in core drill holes. The member is weakened along defined lines until the crack path forms the planned separation joint. This non-explosive technique is particularly suitable for massive components, foundation heads, and areas with stringent noise and vibration limits. Efficient results rely on correct hole spacing, sufficient anchorage depth, and a splitting sequence that directs cracks away from protected edges and embedded installations.<\/p>\n<h3>Rock wedge splitters<\/h3>\n<p>Rock wedge splitters are the central unit of the splitting system. Set up in boreholes, they transmit high forces and produce reproducible crack patterns. In conjunction with a matched <em>hydraulic power pack<\/em>, splitting sequences can be timed and safely controlled. Synchronized activation across several boreholes increases straightness of the separation joint and shortens cycle times, while pressure monitoring enhances process reliability.<\/p>\n<h3>Hydraulic power packs<\/h3>\n<p>Hydraulic power packs supply handheld tools and shears with pressure and flow. For demanding deconstruction tasks, robust, low-maintenance units that allow precise power metering are important. Electrically driven variants support low-emission work indoors. Useful features include noise-attenuated housings, oil cooling for continuous duty, quick-coupling manifolds, and load-sensing control to match flow to tool demand for energy-efficient operation.<\/p>\n<h3>Combination shears and multi cutters<\/h3>\n<p>Combination shears and multi cutters combine crushing of concrete with cutting of reinforcing steel. They are helpful for deconstructing reinforced concrete elements where the concrete matrix and reinforcement should be processed in a single operation. Interchangeable jaw sets and high-toughness blades increase versatility and reduce changeover time on complex assemblies.<\/p>\n<h3>Steel shears<\/h3>\n<p>Steel shears are used for separately cutting profiles, beams, and rebar bundles. They are frequently employed after concrete removal to improve source-separated recovery of valuable materials. Clean cuts facilitate stacking, weighing, and recycling logistics, and reduce the need for secondary trimming.<\/p>\n<h3>Tank cutters<\/h3>\n<p>Tank cutters are used for dismantling vessels and hollow bodies, for example in special operations or industrial demolition work. Combined with concrete demolition tasks, complex assemblies can be divided into manageable sections. When flammable residues or sensitive environments are present, spark-reduced cutting approaches and strict gas monitoring protocols are advisable.<\/p>\n<h2>Areas of application and typical use cases<\/h2>\n<h3>Concrete demolition and specialist deconstruction<\/h3>\n<p>In specialist deconstruction, the priority is minimizing vibration and secondary damage, aligning with <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a> principles. <strong>Concrete demolition shear<\/strong> enable edge-near work on sensitive components; <strong>hydraulic wedge splitters<\/strong> are the first choice for massive foundations, bridge abutments, and heavily reinforced cores. Sequenced removal limits load redistribution, while interim supports and monitoring maintain stability at all stages.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Before structural removal, strip-out is performed: removal of non-load-bearing elements, utilities, and installations. Cutting separations (sawing, drilling) define geometries, while shears transfer components into transportable sections. Accurate dimensioning of cut lines and pre-installed lifting points shortens crane times and reduces rework.<\/p>\n<h3>Rock removal and tunnel construction<\/h3>\n<p>At the interface between artificial and natural materials, there are high requirements for safety and precision. Splitters provide low-vibration work close to infrastructure without excessively loading adjacent structures. The controlled crack propagation is compatible with settlement-sensitive zones and operational rail or roadway constraints.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Splitting technology is used to extract and adapt natural stone blocks. The non-explosive approach promotes controlled fracture surfaces and protects surrounding structures. Reproducible break lines improve downstream machining and reduce waste.<\/p>\n<h3>Special operations<\/h3>\n<p>In special operations &#8211; such as confined site conditions, night work, or sensitive facilities &#8211; compact hydraulic systems, quiet power packs, and precise shears are crucial to meet emission and safety requirements. Carefully planned logistics, shielding, and real-time noise and vibration tracking support compliance within narrow time windows.<\/p>\n<h2>Process, planning, and interfaces<\/h2>\n<p>A robust deconstruction concept begins with an as-built assessment: drawings, rebar detection, material testing, and vibration forecasts. From this, the demolition sequence, cut lines, lifting points, and load cases are derived. Scheduling takes logistics, dust and noise control, and the separation of valuable materials into account. Tools are selected according to member thickness, reinforcement ratio, and accessibility: <em>concrete demolition shear<\/em> for controlled edge removal, <em>hydraulic wedge splitters<\/em> for massive structures, supplemented by shears and cutting tools. Close coordination with structural design, occupational safety, and <em>waste disposal logistics<\/em> is essential.<\/p>\n<ul>\n<li>Permits and notifications: traffic management, working hours, environmental constraints.<\/li>\n<li>Utility coordination: detection, shut-off, or protection of live services.<\/li>\n<li>Monitoring: baseline and ongoing measurements for dust, noise, and vibration.<\/li>\n<li>Load handling: lifting gear verification and exclusion zone planning.<\/li>\n<\/ul>\n<h2>Material and method selection in detail<\/h2>\n<h3>Criteria for tool selection<\/h3>\n<ul>\n<li>Member geometry: thickness, edges, inserts, joints<\/li>\n<li>Reinforcement: diameter, density, location<\/li>\n<li>Environmental conditions: vibration limits, noise control, dust<\/li>\n<li>Accessibility: interior, height, confined shafts<\/li>\n<li>Resources: power supply for hydraulic power packs, water, extraction<\/li>\n<li>Condition of concrete: cracks, strength class, moisture, and contamination<\/li>\n<li>Interfaces: adjacent finishes, fa\u00c3\u00a7ade systems, and sensitive equipment<\/li>\n<li>Removal concept: segment size, lifting routes, on-site processing capacity<\/li>\n<\/ul>\n<h3>Application matrix (simplified guidelines)<\/h3>\n<ul>\n<li>Thick walls\/foundations: <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock Splitters<\/a> and hydraulic wedge splitters, supplemented by steel shears<\/li>\n<li>Edge-near removal: concrete demolition shear with fine metering<\/li>\n<li>Selective separation: sawing\/drilling plus combination shears<\/li>\n<li>Metal inserts: steel shears or multi cutters<\/li>\n<li>Vessels and hollow bodies: tank cutters in combination with shears<\/li>\n<li>Confined interiors: handheld splitters and compact, low-noise power packs<\/li>\n<\/ul>\n<h2>Safety, emissions, and environmental protection<\/h2>\n<p>Safe working takes priority. This includes stability and load-bearing capacity verifications, safety zones, shoring, PPE, and a clear communication structure. Dust is reduced through wet cutting, localized extraction, and orderly material handling. Noise and vibration management is implemented through method selection (e.g., splitting instead of impact) and sequencing. Water and slurries generated must be properly collected and disposed of. Legal requirements may vary by region; coordination with the responsible authorities is generally recommended and carried out on a project-specific basis.<\/p>\n<ul>\n<li>Health protection: silica dust control, hand-arm vibration exposure management, and adequate lighting.<\/li>\n<li>Site control: signage, barriers, banksmen, and access management for mixed operations.<\/li>\n<li>Environmental care: spill prevention, oil containment for hydraulic systems, and compliant wastewater treatment.<\/li>\n<li>Emergency readiness: rescue routes, first-aid equipment, and stop-work criteria linked to monitoring thresholds.<\/li>\n<\/ul>\n<h2>Complementary techniques and interfaces<\/h2>\n<p>Concrete demolition is often combined with drilling and sawing to produce precise cut edges and load segments. Subsequently, <strong>concrete demolition shear<\/strong> perform selective removal, while <strong>hydraulic wedge splitters<\/strong> prepare components that are later separated with shears. A coordinated hydraulic supply keeps tool efficiency and cycle times stable. In sequence planning, pre-cutting, controlled splitting, and final steel separation are aligned so that handling, lifting, and recycling proceed with minimal rework.<\/p>\n<h2>Quality, documentation, and recycling<\/h2>\n<p>Quality in concrete demolition is evidenced by planned separation joints, minimal edge spalling, and cleanly exposed connection surfaces. Documentation includes the demolition sequence, measured values for vibration\/noise, material quantities, and sorting rates. The aim is a high level of recycling of concrete and steel; source-separated cutting by shears makes a decisive contribution.<\/p>\n<ul>\n<li>Evidence: photo logs of interfaces, measurement records, and batch documentation for removed materials.<\/li>\n<li>Recycling: production of consistent concrete fractions and clean reinforcement for efficient downstream processing.<\/li>\n<li>Sustainability: tracking of diversion rates and avoidance of contamination to support circular construction goals.<\/li>\n<\/ul>\n<h2>Failure patterns and practical tips<\/h2>\n<ul>\n<li>Uncontrolled crack formation: adjust spacing of splitting holes, change splitting sequence<\/li>\n<li>Excessive edge spalling: reduce jaw force, control feed<\/li>\n<li>Tool wear: lubrication, cutting edge maintenance, check hydraulic pressure<\/li>\n<li>Performance drop: check <em>hydraulic power packs<\/em> for filters, oil temperature, and couplings<\/li>\n<li>Rebar congestion: plan pre-cutting with steel shears or multi cutters<\/li>\n<li>Hole misalignment: improve drilling guides and verify borehole perpendicularity before splitting<\/li>\n<li>Oil leaks: check hose integrity, couplings, and torque settings prior to pressure-up<\/li>\n<li>Overheating: reduce duty cycle, enhance cooling airflow, and verify oil grade for ambient conditions<\/li>\n<\/ul>\n<h2>Product and tool selection in practice<\/h2>\n<p>The combination of tool geometry, hydraulic power, and component parameters determines efficiency. For thick members, sequential splitting with rock wedge splitters is recommended, supported by a suitable <em>hydraulic power pack<\/em>. For delicate elements or connections, <em>concrete demolition shear<\/em> offer precise control. Combination shears and multi cutters are useful when concrete and reinforcement are to be handled in a single pass. For steel profiles, beams, or vessels, steel shears and tank cutters complement the workflow.<\/p>\n<p>Optimized outcomes depend on matched flow and pressure, appropriate jaw selection, and quick-coupling systems that minimize downtime. Operator training, systematic tool inspection, and documented changeover procedures reduce error rates and keep cycle times predictable.<\/p>\n<h2>Trends and developments<\/h2>\n<p>The focus is on lower-emission drives, quiet hydraulic power packs, reduced vibration, and digitally assisted process control. Modular systems facilitate switching between shear, splitter, and cutter. Data-driven planning, for example based on measured vibrations and tool condition, improves process reliability and supports sustainable deconstruction concepts. Further trends include battery-electric and hybrid power supplies, remote-capable tool operation for enhanced safety, and standardized interfaces that make fleets more flexible and resource-efficient.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Concrete demolition refers to the planned, controlled deconstruction of structures, components, and foundations made of reinforced or plain concrete. The focus is on precision, occupational safety, and the protection of adjacent structures. Depending on the task, different methods are used &#8211; from non-explosive splitting and crushing with hydraulic shears to <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18969","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Demolition | Methods, Safety &amp; Tools<\/title>\n<meta name=\"description\" content=\"Discover controlled deconstruction of reinforced concrete \u2713 Concrete demolition methods, low vibration, safety &amp; recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Demolition | Methods, Safety &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Discover controlled deconstruction of reinforced concrete \u2713 Concrete demolition methods, low vibration, safety &amp; recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-26T16:07:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-demolition\",\"name\":\"Concrete Demolition | Methods, Safety & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-25T09:53:53+00:00\",\"dateModified\":\"2026-03-26T16:07:03+00:00\",\"description\":\"Discover controlled deconstruction of reinforced concrete \u2713 Concrete demolition methods, low vibration, safety & recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Concrete demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Demolition | Methods, Safety & Tools","description":"Discover controlled deconstruction of reinforced concrete \u2713 Concrete demolition methods, low vibration, safety & recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition","og_locale":"en_US","og_type":"article","og_title":"Concrete Demolition | Methods, Safety & Tools","og_description":"Discover controlled deconstruction of reinforced concrete \u2713 Concrete demolition methods, low vibration, safety & recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-26T16:07:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition","name":"Concrete Demolition | Methods, Safety & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-25T09:53:53+00:00","dateModified":"2026-03-26T16:07:03+00:00","description":"Discover controlled deconstruction of reinforced concrete \u2713 Concrete demolition methods, low vibration, safety & recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Concrete demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18969","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18969"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18969\/revisions"}],"predecessor-version":[{"id":25710,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18969\/revisions\/25710"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}