{"id":18944,"date":"2025-10-29T16:33:04","date_gmt":"2025-10-29T15:33:04","guid":{"rendered":"https:\/\/www.darda.de\/jaw-crusher-bucket"},"modified":"2026-03-24T09:55:03","modified_gmt":"2026-03-24T08:55:03","slug":"jaw-crusher-bucket","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket","title":{"rendered":"Jaw crusher bucket"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A <strong>jaw crusher bucket<\/strong> is a processing tool that can be mounted on excavators to crush mineral construction materials such as concrete, masonry, or natural stone directly on the construction site. In combination with solutions from <strong>Darda GmbH<\/strong> &#8211; such as <em>concrete demolition shears<\/em> for selective demolition or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a> for low-vibration breaking &#8211; this enables an efficient, low-emission process chain from the structural element to reusable RC material. In practice, this reduces truck movements, landfill volumes, and interface losses while supporting resource-efficient workflows.<\/p>\n<h2>Definition: What is meant by a jaw crusher bucket?<\/h2>\n<p>A jaw crusher bucket (also <em>crusher bucket<\/em>) is a hydraulically driven crushing unit in the form of a bucket. By means of oscillating crusher jaws, the fed material is reduced between a fixed and a moving jaw plate. It is mounted to the excavator\u2019s stick and uses its hydraulics, typically via an auxiliary circuit and quick coupler. Typical fields of application are <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special demolition<\/a>, the mobile processing of construction debris, tasks in <em>rock excavation and tunnel construction<\/em>, <em>natural stone extraction<\/em>, and <em>special applications<\/em> with limited space or strict emission requirements. RC material denotes recycled construction aggregates produced to defined size distributions for reuse.<\/p>\n<h2>Design and operating principle of a jaw crusher bucket<\/h2>\n<p>The core principle corresponds to a classic jaw crusher: a moving jaw approaches a fixed jaw; the set gap determines the target grain size. The bucket body serves as an intake hopper; after crushing, the material drops through the preset gap. Many models provide a reversing function to clear bridging as well as overload protection. Depending on design, the jaw motion is generated via an eccentric shaft and toggle or via hydraulic actuators; gap adjustment is implemented by shims, spacers, or hydraulically assisted systems for faster changeovers.<\/p>\n<h3>Key components and parameters<\/h3>\n<ul>\n<li><strong>Jaw opening and gap width:<\/strong> determine maximum feed size and resulting size fractions.<\/li>\n<li><strong>Throughput:<\/strong> depends on material strength, moisture, particle shape, and carrier performance.<\/li>\n<li><strong>Hydraulic requirements:<\/strong> the excavator\u2019s oil flow and pressure must match the bucket.<\/li>\n<li><strong>Weight and excavator size class:<\/strong> consider static and dynamic loads; ensure stability.<\/li>\n<li><strong>Wear parts:<\/strong> manganese-steel crusher jaws, side wear plates, where applicable wedges\/clamping bars.<\/li>\n<li><strong>Options:<\/strong> magnet separator for reinforcing steel, water spray system for dust suppression.<\/li>\n<li><strong>Jaw geometry and speed:<\/strong> nip angle, jaw profile, and stroke influence product shape, fines content, and efficiency.<\/li>\n<li><strong>Control and safety:<\/strong> reverse run logic, anti-stall settings, and relief valves protect tool and carrier.<\/li>\n<\/ul>\n<h2>Applications and scope in deconstruction<\/h2>\n<p>Jaw crusher buckets show their strengths wherever short transport routes, flexible gradations, and immediate reuse are required. In many projects they are combined with tools from <strong>Darda GmbH<\/strong> to work selectively, with low noise, and efficiently. Their compactness supports processing close to the point of extraction, reducing handling by wheel loaders and excavators.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p><strong>Concrete demolition shears<\/strong> from Darda GmbH cut load-bearing components in a controlled manner and open concrete bodies, exposing reinforcement. The prepared material can then be crushed in the jaw crusher bucket to defined RC gradations (for example 0-45 mm or 0-63 mm depending on use). Where vibration is critical (heritage-protected neighboring structures, sensitive facilities), <strong>stone and concrete splitters<\/strong> are used to loosen large cross-sections; the loosened blocks are then crushed on site with reduced energy input and fewer fines.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Clean separation helps before crushing: tools such as <em>combination shears<\/em>, <em>multi cutters<\/em>, <em>steel shears<\/em>, or <em>tank cutters<\/em> from Darda GmbH separate metals, sheet materials, and tank components. The jaw crusher bucket then processes the mineral fraction without excessive contaminants, improving magnet performance and wear life.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In rock, <em>stone splitting cylinders<\/em> and <em>stone and concrete splitters<\/em> loosen blocky material with <em>low vibration<\/em>. The crusher bucket reduces the blocks to transport- or installation-ready sizes. In tunnel and underground work, dust suppression, ventilation, and spark protection require particular attention, supported by water misting and careful selection of hydraulic settings.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries and during the extraction of natural stone, oversize and spalled pieces can be converted by the jaw crusher bucket into marketable fractions. Splitting preserves block quality; crushing generates usable by-product rock for base layers, gabions, or site infrastructure.<\/p>\n<h3>Special applications<\/h3>\n<p>On island job sites, in alpine terrain, or on small inner-city areas, mobile crushing saves transport routes. In noise-sensitive areas, a combination of splitting, shear-based demolition, and moderate crushing with water spraying is often chosen. On remote sites, avoiding ferry or long-haul transport can decisively improve project schedules and carbon footprints.<\/p>\n<h2>Process chain: From the structural element to RC construction material<\/h2>\n<h3>Pre-sorting and pre-crushing<\/h3>\n<p>Selective deconstruction with <strong>concrete demolition shears<\/strong> reduces contaminants, separates reinforcement, and produces manageable pieces. <strong>Stone and concrete splitters<\/strong> loosen massive components with controlled cracking, resulting in a more uniform feed size for the jaw crusher bucket. Consistent piece size and reduced impurity content stabilize throughput and product quality.<\/p>\n<h3>Crushing process in the bucket<\/h3>\n<p>Feeding is ideally performed with even dosing. Correct gap setting ensures reproducible size distributions. Entangling reinforcement is removed beforehand; reverse run and magnet separator support continuous operation. Uniform orientation of elongated pieces and avoiding overfilled hoppers further reduce bridging and wear; hydraulic flow should be set to the manufacturer\u2019s recommended window.<\/p>\n<h3>Post-screening and size control<\/h3>\n<p>For precisely defined fractions, separate screening is advisable. Depending on the use, the gradations are used as subbase, backfill material, or for construction logistics; fines content must be considered depending on the material. Oversize can be returned for a second crushing pass or reserved for other site uses to avoid double handling.<\/p>\n<h2>Selection criteria and sizing<\/h2>\n<p>Proper sizing prevents bottlenecks and overload. In addition to the excavator size class, material properties and the desired size distributions play a key role.<\/p>\n<ul>\n<li><strong>Material:<\/strong> concrete strength, reinforcement content, brick content, natural stone strength, moisture.<\/li>\n<li><strong>Target gradation:<\/strong> select gap width according to intended use; define oversize strategy.<\/li>\n<li><strong>Hydraulic reserve:<\/strong> ensure constant oil supply and temperature management.<\/li>\n<li><strong>Construction site layout:<\/strong> provide space for pre-sorting, intermediate stockpiles, dust suppression, and haulage.<\/li>\n<li><strong>Interfaces:<\/strong> plan interaction with <em>concrete demolition shears<\/em>, <em>stone splitting cylinders<\/em>, and other tools.<\/li>\n<li><strong>Carrier stability:<\/strong> verify lifting capacity at working radius, quick coupler compatibility, and transport weights.<\/li>\n<li><strong>Hydraulic limits:<\/strong> check return backpressure and case drain requirements to prevent overheating.<\/li>\n<\/ul>\n<h2>Operation, safety, and environmental protection<\/h2>\n<p>Occupational safety and environmental protection are integral to use. The notes are general in nature and do not replace a project-specific hazard analysis or regulatory requirements. Risk assessments, defined work areas, and communication rules between machine operators and logistics are essential.<\/p>\n<h3>Dust, noise, and vibration<\/h3>\n<ul>\n<li><strong>Dust suppression:<\/strong> water spray system at feed and discharge; where applicable consider wind direction and neighbors.<\/li>\n<li><strong>Noise reduction:<\/strong> coordinate working hours, feed material gently, use acoustic shielding, maintain wear parts.<\/li>\n<li><strong>Vibration:<\/strong> jaw crusher buckets generate low vibration levels; in sensitive environments, prefer splitting technology and shear-based demolition.<\/li>\n<li><strong>Exposure control:<\/strong> monitor dust levels where required; adjust water flow and adopt short feed cycles to limit peaks.<\/li>\n<\/ul>\n<h3>Metal content and spark protection<\/h3>\n<p>Cut exposed reinforcement before crushing (e.g., with <em>concrete demolition shears<\/em> or <em>steel shears<\/em>). A magnet separator at the discharge reduces metal residues. Minimize sparks and provide fire protection measures; where applicable, coordinate hot-work permits and maintain extinguishing equipment in the work zone.<\/p>\n<h3>Hydraulics and operation<\/h3>\n<p>Regularly check the excavator\u2019s system pressure and flow rate. Clean couplings prevent contamination. Detect and rectify overload indicators early (e.g., rising oil temperatures, reduced throughput). Flow dividers or adjustable valves help fine-tune performance; after hose changes, bleed air and recheck relief settings.<\/p>\n<h2>Maintenance and wear management<\/h2>\n<p>Regular inspections extend service life and ensure consistent particle quality. Document wear measurements on crusher jaws and side plates; turn or replace in good time. Lubricate bearings and pins, retighten fasteners, and keep the crushing chamber free of blocking foreign bodies. Maintain records of service hours, stock critical spares on site, and select jaw profiles suited to the feed material to balance throughput and fines.<\/p>\n<h2>Alternative and complementary methods<\/h2>\n<p>The choice of method depends on structural analysis, surroundings, and target material.<\/p>\n<ol>\n<li><strong>Splitting instead of crushing:<\/strong> for vibration-sensitive objects, first loosen with <em>stone and concrete splitters<\/em>; crush only in a second step.<\/li>\n<li><strong>Shear-based demolition:<\/strong> <em>concrete demolition shears<\/em> for selective separation and exposing reinforcement; reduces contaminants in the crusher feed.<\/li>\n<li><strong>Cutting and separating:<\/strong> <em>combination shears<\/em>, <em>multi cutters<\/em>, <em>steel shears<\/em>, <em>tank cutters<\/em> for metallic installations; minimizes downtime at the crusher bucket.<\/li>\n<li><strong>Pre-screening:<\/strong> simple scalping with a separate screen or grid improves throughput where fines or clay would otherwise pack the chamber.<\/li>\n<\/ol>\n<h2>Economic considerations and logistics<\/h2>\n<p>On-site crushing reduces transport and disposal costs. A coordinated material flow &#8211; from shear-based demolition through splitting to the bucket crusher &#8211; avoids double handling. The carrier machine\u2019s hydraulic reserves, fuel demand, and the service life of wear parts have a decisive impact on unit costs. Balanced loading cycles, short travel paths, clear stockpiles, and reliable magnet handling reduce idle times and raise effective tons per hour.<\/p>\n<h2>Common issues and practical tips<\/h2>\n<ul>\n<li><strong>Bridging:<\/strong> uneven feeding or pieces that are too large; clear with reverse run, reduce feed size.<\/li>\n<li><strong>Entangling reinforcement:<\/strong> remove metal content beforehand with <em>concrete demolition shears<\/em> and <em>steel shears<\/em>.<\/li>\n<li><strong>Overheated hydraulics:<\/strong> adjust flow rate, schedule breaks, check the cooling system.<\/li>\n<li><strong>Oversize fraction too high:<\/strong> check the gap, plan for post-screening, feed more evenly.<\/li>\n<li><strong>High wear:<\/strong> reduce unsuitable feed fines (sand\/silt), choose appropriate jaw material, turn in time.<\/li>\n<li><strong>Packing due to fines or moisture:<\/strong> increase water spray, use scalping, avoid processing saturated mud.<\/li>\n<li><strong>Weak metal separation:<\/strong> lower the magnet closer to the belt discharge and clear tramp steel from the work area frequently.<\/li>\n<\/ul>\n<h2>Standards, recycling rates, and quality requirements<\/h2>\n<p>The use of RC construction materials is subject to technical rules and quality levels depending on the region. Reproducible size distributions, low contaminant content, and documented processes are crucial. Structured deconstruction with <strong>concrete demolition shears<\/strong>, controlled loosening with <strong>stone and concrete splitters<\/strong>, and targeted crushing in the bucket support consistent product quality.<\/p>\n<h3>Quality assurance and documentation<\/h3>\n<p>Sampling, test certificates, and traceable batch documentation underpin acceptance. Defined procedures for pre-sorting, gap settings, and screening, combined with maintenance records, support compliance and reproducibility over the entire project duration.<\/p>\n<h2>Terminology and distinctions in practice<\/h2>\n<p>Jaw crusher buckets work with pressure- and shear-oriented mechanisms and produce angular particle shapes. They differ from other bucket crushers with impact- or cone-based principles. In practice, terms such as crusher bucket are often used synonymously; what is meant is an excavator-operated crushing tool with adjustable gap width for mobile processing. In contrast to impact-oriented units, jaw systems typically yield lower fines and a more cubic-angled product suited to subbases and backfill.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A jaw crusher bucket is a processing tool that can be mounted on excavators to crush mineral construction materials such as concrete, masonry, or natural stone directly on the construction site. In combination with solutions from Darda GmbH &#8211; such as concrete demolition shears for selective demolition or stone and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-18944","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Jaw Crusher Bucket | Excavator Attachment<\/title>\n<meta name=\"description\" content=\"Excavator-mounted jaw crusher bucket turns concrete, masonry and rock into reusable aggregate \u2713 adjustable gap on site.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jaw Crusher Bucket | Excavator Attachment\" \/>\n<meta property=\"og:description\" content=\"Excavator-mounted jaw crusher bucket turns concrete, masonry and rock into reusable aggregate \u2713 adjustable gap on site.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-24T08:55:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jaw-crusher-bucket\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jaw-crusher-bucket\",\"name\":\"Jaw Crusher Bucket | Excavator Attachment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-29T15:33:04+00:00\",\"dateModified\":\"2026-03-24T08:55:03+00:00\",\"description\":\"Excavator-mounted jaw crusher bucket turns concrete, masonry and rock into reusable aggregate \u2713 adjustable gap on site.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jaw-crusher-bucket#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jaw-crusher-bucket\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jaw-crusher-bucket#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Jaw crusher bucket\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jaw Crusher Bucket | Excavator Attachment","description":"Excavator-mounted jaw crusher bucket turns concrete, masonry and rock into reusable aggregate \u2713 adjustable gap on site.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket","og_locale":"en_US","og_type":"article","og_title":"Jaw Crusher Bucket | Excavator Attachment","og_description":"Excavator-mounted jaw crusher bucket turns concrete, masonry and rock into reusable aggregate \u2713 adjustable gap on site.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-24T08:55:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket","url":"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket","name":"Jaw Crusher Bucket | Excavator Attachment","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-29T15:33:04+00:00","dateModified":"2026-03-24T08:55:03+00:00","description":"Excavator-mounted jaw crusher bucket turns concrete, masonry and rock into reusable aggregate \u2713 adjustable gap on site.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/jaw-crusher-bucket#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Jaw crusher bucket"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18944"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18944\/revisions"}],"predecessor-version":[{"id":25566,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18944\/revisions\/25566"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}