{"id":18936,"date":"2025-10-29T11:46:02","date_gmt":"2025-10-29T10:46:02","guid":{"rendered":"https:\/\/www.darda.de\/asbestos-remediation"},"modified":"2026-03-24T11:48:02","modified_gmt":"2026-03-24T10:48:02","slug":"asbestos-remediation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation","title":{"rendered":"Asbestos remediation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Asbestos remediation refers to the professional removal, enclosure, or controlled deconstruction of asbestos-containing materials in buildings and industrial facilities. The goal is to prevent the release of asbestos fibers and ensure safe disposal. In day-to-day construction practice, the topic touches numerous trades-from hazardous substance investigation to gutting works and selective deconstruction. Tools and techniques for low-emission cutting and low-vibration detachment of components play a central role. Especially in the context of <strong>concrete demolition and special demolition<\/strong>, hydraulic tools-such as <em>concrete pulverizers<\/em> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> by Darda GmbH-help separate components in a controlled manner and thus structure asbestos-related work in a prepared and safe way.<\/p>\n<h2>Definition: What is meant by asbestos remediation?<\/h2>\n<p>Asbestos remediation comprises a set of structured risk-reduction measures that, depending on the material type and use situation, consist of removal, enclosure (encapsulation), or securing. The focus is on minimizing fiber release, adhering to recognized rules of technology, and proper packaging and disposal of waste. The typical sequence includes investigation, assessment, planning, establishing a controlled work area, executing the work with suitable methods and tools, cleaning, verification, and documentation.<\/p>\n<ul>\n<li><strong>Objectives:<\/strong> prevent fiber release, protect health, maintain structural integrity, and ensure legally compliant disposal.<\/li>\n<li><strong>Approach selection:<\/strong> removal for severely damaged or weakly bound materials, encapsulation for intact and accessible surfaces, securing where immediate removal is impractical.<\/li>\n<li><strong>Controls:<\/strong> negative-pressure containment, wet methods, and validated cleaning prior to reoccupation or follow-on works.<\/li>\n<\/ul>\n<h2>Process and methods for professional asbestos remediation<\/h2>\n<p>The specific approach depends on whether the products are firmly bound (for example, asbestos cement) or weakly bound asbestos products (for example, sprayed asbestos). As a rule, mechanical processing of asbestos-containing components is avoided; materials are removed as intact as possible, surfaces are wetted, work areas are enclosed and kept under negative pressure. In construction projects with complex load-bearing structures, access to affected areas is often created by selectively detaching adjacent, non-contaminated components. Low-vibration and controlled methods-such as hydraulic splitting of concrete or crushing non-contaminated concrete protrusions with concrete pulverizers-help expose contaminant-relevant layers without causing unnecessary secondary damage.<\/p>\n<ul>\n<li><strong>Avoid:<\/strong> dry cutting, grinding, drilling, or sweeping that can aerosolize fibers.<\/li>\n<li><strong>Prefer:<\/strong> wetting, point extraction with high-efficiency filtration, and controlled dismantling techniques.<\/li>\n<li><strong>Small-scale solutions:<\/strong> glove-bag and mini-enclosure methods for localized interventions with strict air management.<\/li>\n<li><strong>Interface management:<\/strong> define handover criteria between remediation and subsequent deconstruction to prevent cross-contamination.<\/li>\n<\/ul>\n<h2>Materials: Types of asbestos and typical locations<\/h2>\n<p>Asbestos was used for decades in a wide range of construction products. Common locations include asbestos cement boards (roofs, facades), floor coverings and adhesives, joint compounds and plasters, fire protection linings, gaskets, pipe claddings, sprayed asbestos on ceilings or beams, and technical insulation in plants. While firmly bound products tend to release fewer fibers when handled properly, weakly bound materials can release fibers into the air under minor stress-remediation procedures are correspondingly differentiated.<\/p>\n<ul>\n<li><strong>Firmly bound:<\/strong> cement boards, fiber-cement pipes, facade shingles.<\/li>\n<li><strong>Weakly bound:<\/strong> sprayed coatings, soft thermal insulation, certain plasters and fillers.<\/li>\n<li><strong>Typical triggers for action:<\/strong> damage, planned penetrations, change of use, or renovation that affects suspect layers.<\/li>\n<\/ul>\n<h2>Occupational safety, emission control, and recognized rules of technology<\/h2>\n<p>Asbestos fibers are respirable; protective measures are therefore non-negotiable. These include establishing a <strong>black area<\/strong> with airlocks, maintaining negative pressure with appropriate filtration, using dust-binding methods (wetting), approved protective equipment, and seamless documentation. The work follows applicable regulations and recognized rules of technology. Project- and site-specific risk assessments determine which work methods and tools may be used under which conditions.<\/p>\n<ul>\n<li><strong>PPE:<\/strong> suitable respirators with high-efficiency filters, protective suits, gloves, and eye protection; organized donning and doffing procedures.<\/li>\n<li><strong>Air management:<\/strong> monitored negative pressure, directional airflow checks, and regular filter maintenance.<\/li>\n<li><strong>Waste handling:<\/strong> double-bagging, clear labeling, interim storage in closed containers, and traceable handover to authorized facilities.<\/li>\n<li><strong>Verification:<\/strong> visual inspections and, where required, airborne fiber measurements to confirm cleaning success before area release.<\/li>\n<\/ul>\n<h2>Tools and methods for low-emission deconstruction<\/h2>\n<p>Methods are required that detach components in a controlled manner, limit vibration, and avoid dust for a safe project flow. Hydraulic tools from Darda GmbH support this goal when correctly integrated into the overall process-typically for exposing and separating <em>non-contaminated<\/em> components, preparing access routes, or for subsequent deconstruction after asbestos removal has been completed.<\/p>\n<h3>Stone and concrete splitters<\/h3>\n<p>Hydraulic splitting technology generates high splitting forces in the drilled hole and separates concrete in a controlled manner, without impact, without sparks, and with very low vibration. In the context of asbestos remediation, this is helpful for releasing load-bearing or massive components at the edges when adjacent components are contaminated and should not be mechanically stressed. The splitting effect reduces secondary material abrasion and facilitates selective removal in <em>gutting works and cutting<\/em>. Where feasible, pre-drilling strategies and splitting sequences are planned to minimize contact with suspect layers.<\/p>\n<h3>Concrete pulverizers<\/h3>\n<p>Concrete pulverizers are suitable for powerful yet controlled size reduction of concrete components. In the context of asbestos remediation, they are used particularly where <strong>non-asbestos-containing<\/strong> concrete components must be reduced or removed to create access to contaminated layers, or to continue deconstruction after the asbestos-containing materials have been removed. The combination of crushing and simultaneous separation of reinforcement minimizes work steps and supports a clean project flow. Selection criteria include reach, jaw geometry, and available bearing capacity to maintain precision.<\/p>\n<h3>Hydraulic power packs<\/h3>\n<p>Hydraulic power packs supply splitters, concrete pulverizers, combination shears, and other tools with the required power. In enclosed areas, a compact, quiet, and reliable energy supply-such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>-is advantageous to keep emissions and disturbances low and to facilitate work organization in the black area. Centralized power supply also simplifies hose routing and reduces tripping hazards in tight setups.<\/p>\n<h3>Combination shears and multi cutters<\/h3>\n<p>Combination shears and multi cutters enable cutting of sections, sheets, pipes, and light reinforcement-cold, low-spark, and precise. In asbestos remediation, they are used to selectively remove non-contaminated installations such as substructures, ventilation ducts, or cable trays. This reduces the use of dust-intensive cutoff grinders and supports a low-emission approach. Interchangeable jaw systems can extend application ranges without changing the carrier.<\/p>\n<h3>Steel shears<\/h3>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a> cut massive steel components cold. In plants with formerly asbestos-containing insulation, steel beams or pipe racks can be safely dismantled without thermal input after removal of contaminants-an advantage where sparks must be excluded in sensitive areas. Clean cuts also facilitate sorting and recycling of metal fractions.<\/p>\n<h3>Tank cutters<\/h3>\n<p>In industrial facilities, tanks, vessels, and piping systems may be affected as part of overall deconstruction. After proper removal of asbestos-containing claddings or gaskets, a tank cutter enables controlled segmentation of large steel vessels without introducing heat. This supports a safe approach in <em>special applications<\/em> scenarios. Cutting plans should define section sizes for safe handling and transport.<\/p>\n<h2>Application areas in the context of asbestos remediation<\/h2>\n<p>Asbestos remediation frequently overlaps with work from the areas of <strong>concrete demolition and special demolition<\/strong>, <strong>gutting works and cutting<\/strong>, and <strong>special applications<\/strong>. A clear sequence is crucial at every stage: First identify, enclose, and treat contaminant zones; then selectively detach and deconstruct adjacent, non-contaminated components. In tunnels or underground structures, historical fire protection layers may contain asbestos-here, incorporating low-vibration methods is particularly important to preserve structural stability.<\/p>\n<ul>\n<li><strong>Typical environments:<\/strong> building cores, basements, shafts, tunnels, and process plants with complex piping.<\/li>\n<li><strong>Interfaces:<\/strong> coordination with structural engineers, building services, and waste logistics to maintain schedule integrity.<\/li>\n<li><strong>Protection of neighbors:<\/strong> optimized delivery routes, timed material movements, and noise-reduced tool use.<\/li>\n<\/ul>\n<h2>Site organization: From investigation to disposal<\/h2>\n<p>A structured sequence improves safety, quality, and scheduling.<\/p>\n<ol>\n<li>Hazardous substance investigation and sampling by qualified professionals; evaluation of findings and definition of the remediation strategy.<\/li>\n<li>Planning of work areas with enclosure, negative pressure, and material\/personnel airlocks; defining equipment and tool logistics.<\/li>\n<li>Preparatory measures: selective detachment of non-contaminated components, creation of safe access routes, load relief, and stabilization.<\/li>\n<li>Asbestos remediation: careful removal of asbestos-containing components using dust-binding methods; safe packaging in suitable containers.<\/li>\n<li>Subsequent deconstruction: controlled cutting and size reduction of remaining components, for example with concrete pulverizers or stone and concrete splitters.<\/li>\n<li>Cleaning, visual inspection, and measurement-based verification in accordance with applicable requirements; orderly disposal via authorized receiving facilities.<\/li>\n<\/ol>\n<ul>\n<li><strong>Hold points:<\/strong> defined inspections before enclosure closure, before area release, and before subsequent deconstruction starts.<\/li>\n<li><strong>Change control:<\/strong> procedures for scope adjustments in case of unforeseen findings to maintain compliance and quality.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Transparent documentation of the entire process is essential: from investigation to clearance plans and evidence of waste streams. In addition, airborne fiber measurements and visual inspections can be used to assess cleaning success. The evaluation also serves as a basis for the next project phase, for example the subsequent concrete deconstruction.<\/p>\n<ul>\n<li><strong>Documentation set:<\/strong> sampling reports, risk assessments, method statements, daily logs, equipment maintenance records, and waste transfer notes.<\/li>\n<li><strong>Acceptance criteria:<\/strong> clean-surface requirements, filter change records, and validated measurement results where applicable.<\/li>\n<li><strong>Traceability:<\/strong> unique identifiers for enclosures, tools, and waste containers to ensure complete chain-of-custody.<\/li>\n<\/ul>\n<h2>Typical challenges and practical solutions<\/h2>\n<ul>\n<li>Hidden asbestos findings: plan contingency and escalation processes; include selective openings using splitting or cutting, low-emission methods.<\/li>\n<li>Confined access: use compact hydraulic power packs and handheld tools; reduce loads through pre-fragmentation with concrete pulverizers.<\/li>\n<li>Sensitive neighborhood: deploy low-vibration splitting technology; adjust working hours and logistics; intensify dust-binding measures.<\/li>\n<li>Complex reinforcement: use combination shears or steel shears to cut reinforcement and sections cold and accelerate follow-up work.<\/li>\n<li>Structural constraints: coordinate with engineering to stage temporary supports and choose low-impact sequences.<\/li>\n<li>Weather and moisture: protect enclosures and waste handling lines; ensure slip-safe routes and safeguarded electrical supplies.<\/li>\n<\/ul>\n<h2>Sustainability and resource conservation in hazardous-material deconstruction<\/h2>\n<p>Selective deconstruction with clear separation of hazardous substances and construction material fractions enables recycling wherever technically and legally feasible. Low-emission methods reduce cleaning effort and protect adjacent components from contamination-this conserves resources and reduces disposal volumes. Hydraulic tools that enable controlled separation instead of brute destruction contribute to this.<\/p>\n<ul>\n<li><strong>Resource efficiency:<\/strong> cleaner fractions improve recycling yields for metals and mineral materials.<\/li>\n<li><strong>Emission prevention:<\/strong> minimized dust and vibration protect building fabric and reduce rework.<\/li>\n<li><strong>Planning benefit:<\/strong> predictable sequences lower idle times and transport runs, improving the overall footprint.<\/li>\n<\/ul>\n<h2>Practical focus: Selective deconstruction with concrete pulverizers and splitting technology<\/h2>\n<p>A proven approach is to first reduce load-bearing and partition walls outside contaminated zones in a controlled way to create safe work areas. <strong>Concrete pulverizers<\/strong> enable small-scale removal of concrete, while <strong>stone and concrete splitters<\/strong> release massive components without impact. In combination with <em>hydraulic power packs<\/em> and complementary tools such as <em>combination shears<\/em>, a continuous, low-emission process is created from exposure through to haul-off-well-suited for <em>gutting works and cutting<\/em> as well as <em>concrete demolition and special demolition<\/em>. Clear interface definitions and measured verification support a reliable handover from remediation to subsequent deconstruction.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Asbestos remediation refers to the professional removal, enclosure, or controlled deconstruction of asbestos-containing materials in buildings and industrial facilities. The goal is to prevent the release of asbestos fibers and ensure safe disposal. In day-to-day construction practice, the topic touches numerous trades-from hazardous substance investigation to gutting works and selective <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18936","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Asbestos Remediation - Abatement Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Safe asbestos remediation for buildings &amp; industrial facilities \u2713 removal, enclosure and controlled deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Asbestos Remediation - Abatement Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Safe asbestos remediation for buildings &amp; industrial facilities \u2713 removal, enclosure and controlled deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-24T10:48:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/asbestos-remediation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/asbestos-remediation\",\"name\":\"Asbestos Remediation - Abatement Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-29T10:46:02+00:00\",\"dateModified\":\"2026-03-24T10:48:02+00:00\",\"description\":\"Safe asbestos remediation for buildings & industrial facilities \u2713 removal, enclosure and controlled deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/asbestos-remediation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/asbestos-remediation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/asbestos-remediation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Asbestos remediation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Asbestos Remediation - Abatement Methods & Safety","description":"Safe asbestos remediation for buildings & industrial facilities \u2713 removal, enclosure and controlled deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation","og_locale":"en_US","og_type":"article","og_title":"Asbestos Remediation - Abatement Methods & Safety","og_description":"Safe asbestos remediation for buildings & industrial facilities \u2713 removal, enclosure and controlled deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-24T10:48:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation","url":"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation","name":"Asbestos Remediation - Abatement Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-29T10:46:02+00:00","dateModified":"2026-03-24T10:48:02+00:00","description":"Safe asbestos remediation for buildings & industrial facilities \u2713 removal, enclosure and controlled deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/asbestos-remediation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Asbestos remediation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18936"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18936\/revisions"}],"predecessor-version":[{"id":25580,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18936\/revisions\/25580"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}