{"id":18925,"date":"2025-10-30T15:58:29","date_gmt":"2025-10-30T14:58:29","guid":{"rendered":"https:\/\/www.darda.de\/compactor-attachment"},"modified":"2026-03-23T09:54:03","modified_gmt":"2026-03-23T08:54:03","slug":"compactor-attachment","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment","title":{"rendered":"Compactor attachment"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A <strong>compactor attachment<\/strong> is a hydraulically powered attachment for excavators, wheeled excavators, or compact excavators that compacts soils, bulk materials, and backfills by means of directed vibrations. On deconstruction, earthworks, and tunnel-construction projects, it enables safe, reproducible compaction in areas that are difficult to reach with hand-guided plates or rollers &#8211; such as trenches, slope edges, or between foundation remnants. In many construction workflows, the compactor attachment is directly linked to demolition and separation tasks: after loosening concrete with <strong>concrete demolition shear<\/strong> or controlled fragmentation using <strong>hydraulic wedge splitter<\/strong>, pits and utility corridors are often refilled layer by layer and compacted with the compactor attachment to the required degree. Compared with hand-guided equipment, the excavator-mounted solution increases area output, reduces personnel exposure in hazard zones, and provides more consistent results in confined geometries.<\/p>\n<h2>Definition: What is a compactor attachment?<\/h2>\n<p>A <em>compactor attachment<\/em> is a compaction unit coupled to the carrier machine, typically in the form of a vibrating base plate with an integrated exciter (eccentric shaft). Frequently referred to as a <em>hydraulic plate compactor<\/em> or <em>vibratory plate attachment for excavators<\/em>, it is driven by the excavator\u2019s hydraulic circuit. The exciter generates a defined frequency and centrifugal force that compacts the ground via cyclic loading. Typical applications include compacting trench backfills, excavations, foundation bases, slopes, and work paths, as well as creating bedding for pipelines and post-compaction after demolition activities. The design allows safe compaction from the carrier\u2019s standing position, delivering high area output while keeping personnel exposure in hazard zones low and minimizing the need for manual rework.<\/p>\n<h2>Design and operating principle of a compactor attachment<\/h2>\n<p>A compactor attachment consists of a mounting interface (adapter plate or quick coupler-compatible mount), a housing with exciter shaft(s), bearings, damping elements, a robust base plate, and hydraulic connections. The carrier machine supplies oil flow and operating pressure; the hydraulic motor drives the eccentric shaft. Frequency and amplitude, together with the self-weight, determine the <em>centrifugal force<\/em> and thus the compaction performance. Effective vibration isolation between the exciter housing and the mounting interface protects the boom and reduces structure-borne noise transmission. Depending on the model, optional tilt or rotation modules improve access on slopes and near edges.<\/p>\n<h3>Key parameters<\/h3>\n<ul>\n<li><strong>Frequency<\/strong>: determines vibration speed and suitability for different soil types (higher frequencies for fine-grained soils, lower for coarse-grained).<\/li>\n<li><strong>Centrifugal force<\/strong> and <strong>self-weight<\/strong>: influence the penetration depth of compaction energy and the achievable layer thickness.<\/li>\n<li><strong>Amplitude and contact pressure<\/strong>: govern energy input into the lift and help avoid surface over-vibration or material pumping.<\/li>\n<li><strong>Working width<\/strong> of the base plate: defines area output and accessibility in narrow trenches.<\/li>\n<li><strong>Hydraulic oil flow and pressure<\/strong>: must match the carrier to avoid overheating and performance loss.<\/li>\n<li><strong>Vibration isolation<\/strong>: reduces transmission to the excavator boom and improves component protection.<\/li>\n<\/ul>\n<h2>Application areas in deconstruction, earthworks, and tunnel construction<\/h2>\n<p>In <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/strong>, the compactor attachment is used for layer-by-layer backfilling and compaction after removing components &#8211; for example, after separation with <strong>concrete demolition shear<\/strong> or after controlled splitting of foundations with <strong>hydraulic wedge splitter<\/strong>. During <strong>building gutting and cutting<\/strong>, it handles post-compaction of temporary site roads or the bedding for transport routes in confined spaces. Where near-edge work is required, the excavator\u2019s reach enables precise compaction along walls, shoring, or foundation remnants with controlled energy input.<\/p>\n<p>In <strong>rock excavation and tunnel construction<\/strong>, it is used to compact spoil for temporary access routes, backfill pipelines or cable routes, and secure work areas in the heading. In <strong>natural stone extraction<\/strong>, access roads, storage areas, and slope sections are compacted, often in zones with limited bearing capacity. In <strong>special operations<\/strong>, the compactor attachment provides compaction around exposed utilities, shafts, or support structures where precise, near-edge work is required. The method is also suitable for compacting lifts around manholes and culverts where trench rollers or self-propelled equipment cannot safely enter.<\/p>\n<h2>Process chain: from loosening to compaction<\/h2>\n<p>In many projects, the compactor attachment is an integral part of a process chain: components are first loosened or size-reduced with suitable demolition tools, then voids are backfilled and compacted.<\/p>\n<ol>\n<li>Selective deconstruction of concrete components, e.g., with <strong>concrete demolition shear<\/strong> or <em>combination shears<\/em>, separation of reinforcement with <em>steel shear<\/em>.<\/li>\n<li>Controlled splitting of massive foundations or rock with <strong>hydraulic wedge splitter<\/strong> or <em>rock wedge splitter<\/em> with low vibration input.<\/li>\n<li>Placement and leveling of suitable fill materials (grading matched to the required bearing capacity).<\/li>\n<li>Layer-by-layer compaction with the compactor attachment to the specified degree of compaction.<\/li>\n<li>Quality assurance via suitable test procedures, followed by superstructure or fit-out where applicable.<\/li>\n<li>Documentation of results and as-built records as required by the specification or permit.<\/li>\n<\/ol>\n<h2>Selection and sizing: matching the device to the soil<\/h2>\n<p>Proper sizing ensures that compaction targets are achieved economically and safely. The following aspects are essential:<\/p>\n<ul>\n<li><strong>Carrier size<\/strong>: the excavator\u2019s self-weight and hydraulic performance must match the compactor attachment (adequate oil flow, suitable return line, pressure limiting).<\/li>\n<li><strong>Soil type<\/strong>: sand, gravel, and crushed stone behave differently than silty or clayey soils. Higher frequencies suit fine-grained soils; higher centrifugal forces suit coarse-grained fills.<\/li>\n<li><strong>Layer thickness<\/strong>: set lift thickness so that the vibration penetration is sufficient; prefer multiple thinner lifts over inadequate depth effect.<\/li>\n<li><strong>Accessibility<\/strong>: narrow plates for tight trenches, wider plates for area output; optional tilt or rotation units for slopes.<\/li>\n<li><strong>Vibration management<\/strong>: consider requirements for protection near sensitive structures; if necessary, reduce output and increase the number of passes.<\/li>\n<li><strong>Operating orientation<\/strong>: ensure the selected mount and any tilt-rotator maintain stable plate contact on slopes and along edges.<\/li>\n<li><strong>Transport and lifting limits<\/strong>: observe lifting charts and ground bearing to avoid overloading near trench crests or on temporary works.<\/li>\n<\/ul>\n<h2>Soil and compaction strategy<\/h2>\n<p>The compaction strategy is based on soil class, grain-size distribution, and moisture. Careful adjustment of process parameters avoids over- or under-compaction. Target densities commonly relate to laboratory reference values (e.g., standard or modified Proctor), with acceptance grades defined in the specification.<\/p>\n<h3>Guidelines for typical soils<\/h3>\n<ul>\n<li><strong>Coarse-grained soils<\/strong> (sand, gravel, crushed stone): medium to high centrifugal force, moderate frequency; larger layer thicknesses are possible.<\/li>\n<li><strong>Fine-grained soils<\/strong> (silt, clay): higher frequencies, smaller layer thicknesses, keep moisture in the optimal range (near optimum moisture).<\/li>\n<li><strong>Mixed or recycled construction materials<\/strong>: place homogeneous lifts, account for cohesive constituents; quality assurance via load plate tests or dynamic testing.<\/li>\n<li><strong>Frost-susceptible or collapsible soils<\/strong>: apply conservative lift heights, ensure drainage and moisture control, and verify bearing by short-interval testing.<\/li>\n<\/ul>\n<h3>Moisture and placement<\/h3>\n<p>Material moisture has a strong influence on compactability. Lifts that are too dry create dust and interlock poorly; lifts that are too wet \u201cpump.\u201d The <em>degree of compaction<\/em> is defined via suitable reference values; the methods used are project-specific and follow applicable technical standards. Where necessary, adjust moisture by controlled watering and mixing or by aeration and reworking before compaction, and correct the lift thickness if penetration is insufficient.<\/p>\n<h2>Hydraulic interfaces and power supply<\/h2>\n<p>Compactor attachments are typically operated via the carrier\u2019s breaker circuit. Sufficient, cleanly filtered oil flow, a free return line, and a system pressure suited to the device are critical. Pressure relief valves, temperature monitoring, and regular maintenance protect components. On sites without suitable excavator hydraulics, separate <strong>hydraulic power pack<\/strong> units can be considered as the energy source for hydraulic tools, provided the technical requirements align and safety is ensured.<\/p>\n<ul>\n<li><strong>Backpressure and case drain<\/strong>: observe permissible return-line backpressure and case-drain requirements to prevent heat build-up and bearing damage.<\/li>\n<li><strong>Flow control<\/strong>: set flow within the device\u2019s operating window; excessive flow increases temperature and does not improve compaction.<\/li>\n<li><strong>Thermal limits<\/strong>: monitor oil temperature and pause operation if limits are approached; verify cooler performance on hot days.<\/li>\n<li><strong>Hose routing<\/strong>: protect hoses against abrasion and pinch points, especially when working near shoring or foundation edges.<\/li>\n<\/ul>\n<h2>Combination with tools from Darda GmbH<\/h2>\n<p>In deconstruction workflows, the compactor attachment complements the tools from <strong>Darda GmbH<\/strong> without replacing them: <strong>concrete demolition shear<\/strong> separates and size-reduces reinforced-concrete components with low vibration; <strong>hydraulic wedge splitter<\/strong> creates defined fracture planes in massive elements or rock formations. After removing and hauling away the material, voids and utility corridors are backfilled in layers with suitable material and compacted using the compactor attachment. This produces a continuous, controlled process from dismantling to achieving the required subgrade bearing capacity and reduces cycle times through coordinated tool use on the same carrier platform.<\/p>\n<h2>Occupational safety, vibrations, and environmental protection<\/h2>\n<p>Compaction from the cab reduces personnel exposure in trenches and hazard zones. Nevertheless, safety distances to trench slopes, utilities, and structures must be observed. Vibrations can transmit into adjacent structures; careful parameterization and ongoing observation are advisable.<\/p>\n<ul>\n<li><strong>Safety<\/strong>: ensure carrier stability, define lashing and lifting points and exclusion zones; locate utilities.<\/li>\n<li><strong>Vibrations<\/strong>: consider sensitive facilities (instruments, historic fabric); provide a measurement concept if needed.<\/li>\n<li><strong>Noise and dust<\/strong>: optimize placement moisture, minimize dust generation; observe permitted operating hours.<\/li>\n<li><strong>Trench edges<\/strong>: maintain sufficient distance from the crest depending on excavation depth and support conditions; avoid slewing loads over unsupported edges.<\/li>\n<li><strong>Attachment security<\/strong>: verify quick coupler engagement and locking; perform functional checks before entering confined areas.<\/li>\n<\/ul>\n<p>Legal requirements, standards, and official approvals must be checked on a project-specific basis. The following notes are general in nature and do not replace binding planning.<\/p>\n<h2>Quality assurance of compaction<\/h2>\n<p>Proof of bearing capacity is provided through suitable tests. Common practice includes dynamic compaction measurements, density tests against reference values, or load plate tests. Test intervals, thresholds, and procedures are usually specified in the tender or the applicable technical rules. Depending on the project, methods may include light-weight deflectometer measurements, in-situ density testing (e.g., sand replacement or nuclear density methods), or dynamic probing to verify uniformity over depth.<\/p>\n<h3>Practical tips<\/h3>\n<ul>\n<li>Create test sections to determine optimal layer thicknesses and equipment parameters.<\/li>\n<li>Define a compaction pass plan (lane overlap, number of passes, whether to treat edge areas first or last depending on geometry).<\/li>\n<li>Treat edge-adjacent zones and areas at component edges with reduced output to avoid damage.<\/li>\n<li>Check elevations after compaction and allow for densification in the grading plan to hit final levels without overfilling.<\/li>\n<li>Break down oversize clods or remove particles exceeding the specified maximum grain size to prevent bridging.<\/li>\n<\/ul>\n<h2>Maintenance, operation, and typical failure patterns<\/h2>\n<p>Regular maintenance prevents failures and preserves compaction performance.<\/p>\n<ul>\n<li><strong>Hydraulics<\/strong>: check for leaks, inspect hoses and couplings, monitor filter condition.<\/li>\n<li><strong>Bearings and exciter<\/strong>: monitor lubrication and play; treat unusual noises as warning signs.<\/li>\n<li><strong>Base plate<\/strong>: check wear condition and flatness; avoid breaking the edges.<\/li>\n<li><strong>Damping elements<\/strong>: replace cracked or settled elements in time to keep vibrations away from the boom.<\/li>\n<li><strong>Fasteners<\/strong>: re-torque mounting bolts at specified intervals and after impacts; inspect for elongation and corrosion.<\/li>\n<li><strong>Exciter oil or grease<\/strong>: if applicable, maintain the specified fill level and service intervals to prevent overheating and bearing damage.<\/li>\n<\/ul>\n<h3>Common causes of insufficient compaction<\/h3>\n<ul>\n<li>Layer thickness too large relative to the device size.<\/li>\n<li>Unsuitable frequency\/centrifugal force for the soil type.<\/li>\n<li>Inappropriate moisture content of the placed material.<\/li>\n<li>Carrier machine\u2019s hydraulic performance insufficient or incorrectly set.<\/li>\n<li>Material segregation or oversized particles causing bridging and local voids.<\/li>\n<li>Excessive return-line backpressure reducing effective exciter performance.<\/li>\n<\/ul>\n<h2>Limits and alternatives<\/h2>\n<p>In very cohesive soils with unfavorable moisture, near highly sensitive neighboring structures, or on large, level areas with stringent flatness requirements, other methods (rollers, static compaction, specialized vibratory vehicles) may be more suitable. The compactor attachment shows its strengths where accessibility, trench safety, and precise, layer-by-layer compaction are paramount. In extremely confined spots or narrow corners, rammers or trench rollers can complement the excavator-mounted plate to close coverage gaps.<\/p>\n<h2>Sustainability and material cycle<\/h2>\n<p>The combination of material-conserving deconstruction and targeted compaction supports the re-use of suitable mineral construction materials. After size reduction, for example with <strong>concrete demolition shear<\/strong>, and controlled grading management, recycled aggregates can be compacted in layers. This reduces transport routes and leverages available resources, provided that material quality and project-specific requirements permit it. Transparent documentation of recycled content and achieved bearing values supports compliance with environmental and procurement criteria while maintaining structural reliability.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A compactor attachment is a hydraulically powered attachment for excavators, wheeled excavators, or compact excavators that compacts soils, bulk materials, and backfills by means of directed vibrations. On deconstruction, earthworks, and tunnel-construction projects, it enables safe, reproducible compaction in areas that are difficult to reach with hand-guided plates or rollers <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18925","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Compactor Attachment | Excavator Soil Compaction<\/title>\n<meta name=\"description\" content=\"Hydraulic excavator compactor attachment guide \u2713 uses, soil types, sizing, safety, and best practices.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Compactor Attachment | Excavator Soil Compaction\" \/>\n<meta property=\"og:description\" content=\"Hydraulic excavator compactor attachment guide \u2713 uses, soil types, sizing, safety, and best practices.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-23T08:54:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-attachment\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-attachment\",\"name\":\"Compactor Attachment | Excavator Soil Compaction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-30T14:58:29+00:00\",\"dateModified\":\"2026-03-23T08:54:03+00:00\",\"description\":\"Hydraulic excavator compactor attachment guide \u2713 uses, soil types, sizing, safety, and best practices.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-attachment#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-attachment\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-attachment#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Compactor attachment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Compactor Attachment | Excavator Soil Compaction","description":"Hydraulic excavator compactor attachment guide \u2713 uses, soil types, sizing, safety, and best practices.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment","og_locale":"en_US","og_type":"article","og_title":"Compactor Attachment | Excavator Soil Compaction","og_description":"Hydraulic excavator compactor attachment guide \u2713 uses, soil types, sizing, safety, and best practices.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-23T08:54:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment","url":"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment","name":"Compactor Attachment | Excavator Soil Compaction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-30T14:58:29+00:00","dateModified":"2026-03-23T08:54:03+00:00","description":"Hydraulic excavator compactor attachment guide \u2713 uses, soil types, sizing, safety, and best practices.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/compactor-attachment#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Compactor attachment"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18925"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18925\/revisions"}],"predecessor-version":[{"id":25537,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18925\/revisions\/25537"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}