{"id":18908,"date":"2025-11-01T15:39:21","date_gmt":"2025-11-01T14:39:21","guid":{"rendered":"https:\/\/www.darda.de\/demolition-sorting"},"modified":"2026-09-12T19:53:01","modified_gmt":"2026-09-12T17:53:01","slug":"demolition-sorting","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting","title":{"rendered":"Demolition sorting"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Demolition sorting<\/strong> is a core step of selective deconstruction. It determines recycling rates, disposal costs, emissions, and the quality of the recovered secondary raw materials. The more consistently materials such as concrete, steel, masonry, wood, gypsum, plastics, and cables are systematically separated, the more efficiently material cycles can be closed. In practice, tool selection, work method, and construction logistics interact directly. Especially for massive components, <strong>concrete demolition shears<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> have a major impact on separation precision, low contamination, and the purity of the fractions. Early pre-demolition audits and a clear separation concept align the waste hierarchy with on-site execution and enable verifiable circular outcomes.<\/p>\n<h2>Definition: What is meant by demolition sorting?<\/h2>\n<p>Demolition sorting is the planned separation, recording, and allocation of all building materials arising during deconstruction into defined fractions. Ideally, it begins <em>before<\/em> mechanical demolition with the strip-out and continues on site in several stages: loosening, downsizing, separating, and controlled removal. The goal is a <strong>high degree of single-grade purity<\/strong> with minimal mixing. This improves recoverability, reduces the mass of cost-intensive residuals, and supports the circular economy. Pre-demolition material inventories, including hazardous substances registers and BIM-based quantity takeoffs, define target fractions, purity classes, and documentation levels for compliant processing.<\/p>\n<h2>Process and separation principles of demolition sorting<\/h2>\n<p>Demolition sorting follows a multi-stage approach: preliminary investigation and decontamination, strip-out, selective deconstruction, mechanical separation, interim storage by fraction, and documented haul-off. In the structural phase, hydraulic tools are used whose characteristics shape the separation quality. <strong>Concrete demolition shears<\/strong> separate concrete selectively, grip components in a controlled manner, and cut embedded reinforcement with integrated blades. This lowers contaminants in the mineral fraction while the steel portion accrues separately and cleanly. <strong>Rock and concrete splitters<\/strong> act wedge-based in the borehole and create cracks along defined lines without a blasting effect. The result is coarse, largely low-dust breakage with a low fines content &#8211; beneficial for the quality of the recycled concrete fraction and for noise-sensitive environments. <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em> supply the tools with constant output; consistently available hydraulic pressures support reproducible separation patterns. Depending on the material mix, <em>combination shears, multi cutters, steel shears<\/em> or <em>tank cutters<\/em> complement the process to separate metals, lines, profiles, and vessels in a controlled manner. The choice of separation principle &#8211; shearing, splitting, pinching, cutting &#8211; depends on cross-section, accessibility, vibration control, and the requirements for single-grade purity.<\/p>\n<p><em>Separation principles at a glance:<\/em><\/p>\n<ul>\n<li><strong>Shearing:<\/strong> Targeted biting and cutting for reinforced concrete and steel-bearing elements with low shock input.<\/li>\n<li><strong>Splitting:<\/strong> Borehole-based crack initiation along defined lines for thick, sensitive, or confined components.<\/li>\n<li><strong>Cutting and pinching:<\/strong> Segmenting of lines, vessels, and profiles to maintain clean metal and residual streams.<\/li>\n<\/ul>\n<h2>Fractions and material streams in deconstruction<\/h2>\n<p>A viable sorting strategy defines the target fractions and the pathways in advance. Typical material streams are:<\/p>\n<ul>\n<li><strong>Mineral fractions:<\/strong> Concrete, reinforced concrete, masonry, screeds. Concrete demolition shears reduce foreign matter such as metal content in the concrete fraction, while splitters deliver large, clean chunks that are easy to further classify.<\/li>\n<li><strong>Metals:<\/strong> Reinforcing steel, sections, sheet. Steel shears and combination shears cut beams, profiles, and reinforcement so that the steel can be removed separately as scrap.<\/li>\n<li><strong>Lightweight materials:<\/strong> Wood, plastics, insulation. These are removed in the upstream strip-out to avoid contaminating mineral fractions.<\/li>\n<li><strong>Gypsum and fines:<\/strong> Gypsum-based materials, plasters, fines. Fines can be kept low through splitting methods; they require separate collection.<\/li>\n<li><strong>Lines and vessels:<\/strong> Pipes, tanks, apparatus. Multi cutters and tank cutters enable safe segmenting to control contents and keep materials separated.<\/li>\n<li><strong>Hazardous and regulated materials:<\/strong> Asbestos-containing components, PCB-bearing sealants, and other substances require specialist removal with chain-of-custody documentation.<\/li>\n<li><strong>Residual and mixed fractions:<\/strong> Cost drivers that should be minimized through clean interfaces, last-minute checks at the container, and clear acceptance criteria.<\/li>\n<\/ul>\n<h2>Applications and typical scenarios<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In massive reinforced concrete, forces and cross-sections dominate. <strong>Concrete demolition shears<\/strong> set targeted break lines, separate reinforcement, and minimize rebar residues in the concrete fraction. In sensitive environments &#8211; such as in existing buildings, hospitals, or bridges with traffic &#8211; <strong>rock and concrete splitters<\/strong> enable low-vibration loosening, preventing cracks in the remaining structure and secondary damage. Special deconstruction benefits from controlled sequencing: first separate, then lift, and place single-grade.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Before the structural demolition, fixtures, lightweight materials, and utility systems are removed. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">multi cutters<\/a>, combination shears, and steel shears cut pipes, conduits, and profiles so that clean metal fractions accrue. Separate removal reduces contaminants in mineral construction debris and increases recycling quality.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>When loosening rock or shotcrete linings, low vibration and controlled crack patterns are crucial. <strong>Rock and concrete splitters<\/strong> as well as <em>rock wedge splitters<\/em> create defined crack systems without pressure waves, pre-structuring the material during loosening and preparing it for subsequent sorting. The resulting coarse pieces can be placed in a targeted manner and transported separately.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries, block quality is decisive. Splitting processes generate smooth cracks along natural joints. Sorting starts at the initial break: blocks, sections, and backfill are placed directly by quality and size, fines are kept low, and transport routes are optimized.<\/p>\n<h3>Special applications<\/h3>\n<p>For sensitive assets, in city centers, or in plants with limited access, splitting and shearing methods enable low-emission, precise work. Defined cut and split lines create manageable segments that are placed directly onto prepared load carriers or into containers for the respective fraction.<\/p>\n<p>Across scenarios, the method mix is adapted to structure, access, and emission constraints. Pre-splitting relieves components, small carriers handle interior work, and shear-based downsizing supports fast removal with clean fraction placement.<\/p>\n<h2>Equipment selection and work methodology<\/h2>\n<p>The choice of tool is guided by the targeted separation pattern, emission goals, and logistics.<\/p>\n<ul>\n<li><strong>Concrete demolition shears:<\/strong> For selective biting of reinforced concrete, separating corbels, walls, and slabs. Advantageous when reinforcing steel is to be cut and separated directly.<\/li>\n<li><strong>Rock and concrete splitters:<\/strong> For low-vibration release of thick components, massive foundations, plinths\/footings, and blocks. Low dust and noise, coarse, clean fragments.<\/li>\n<li><strong>Combination shears and multi cutters:<\/strong> For changing material mixes during strip-out and mixed demolition; cut steel sections, pipes, and sheet bundles.<\/li>\n<li><strong>Steel shears:<\/strong> For heavy steel cross-sections, beams, and reinforcement bundles to obtain a clean metal fraction.<\/li>\n<li><strong>Tank cutters:<\/strong> For vessels and hollow bodies, segmented in a controlled manner to safely separate contents.<\/li>\n<li><strong>Power units:<\/strong> For constant energy supply to the tools; stable pressure promotes reproducible separation quality.<\/li>\n<\/ul>\n<p><em>Work methodology:<\/em> From outside to inside, top to bottom, light to heavy. Pre-cut or pre-split to relieve components, then remove in a controlled manner and place single-grade. Spatial separation of staging areas (mineral, metal, wood, gypsum, residual) minimizes mixing.<\/p>\n<p><strong>Selection criteria:<\/strong><\/p>\n<ul>\n<li><strong>Carrier and access:<\/strong> Available excavator class, reach, and working height in relation to component geometry and site constraints.<\/li>\n<li><strong>Jaw opening, force, and cycle time:<\/strong> Matching cross-sections and required throughput without compromising separation accuracy.<\/li>\n<li><strong>Hydraulic compatibility:<\/strong> Pressure, flow, and power reserve of <em>hydraulic power units<\/em> or carriers for stable tool performance.<\/li>\n<li><strong>Emission targets:<\/strong> Noise, vibration, and dust limits dictating the share of splitting versus percussive or high-impact methods.<\/li>\n<li><strong>Fraction targets:<\/strong> Required purity classes determining cut positions, split lines, and removal sequencing.<\/li>\n<\/ul>\n<h2>Quality assurance, documentation, and KPIs<\/h2>\n<p>Robust demolition sorting is based on preliminary investigation, a deconstruction concept, and ongoing control. Common records are weighing data per fraction, delivery notes, shift reports, and photo documentation. Practical indicators include:<\/p>\n<ul>\n<li><strong>Separation rate:<\/strong> Share of single-grade captured mass relative to total mass.<\/li>\n<li><strong>Recycling rate:<\/strong> Share of recovered mass relative to total mass.<\/li>\n<li><strong>Fines ratio:<\/strong> Measure of generated fines; splitting methods can reduce this.<\/li>\n<li><strong>Contaminant content:<\/strong> e.g., metal in mineral fractions; reducible through concrete demolition shears with rebar separation.<\/li>\n<li><strong>Purity index:<\/strong> Analytical or visual grading of fraction quality versus specification.<\/li>\n<li><strong>Carbon intensity:<\/strong> CO2e per tonne processed and hauled, influenced by downsizing method and logistics.<\/li>\n<li><strong>Reporting latency:<\/strong> Time from generation to verified record, enabling near real-time steering.<\/li>\n<\/ul>\n<p>Independent sampling, calibrated scales, and traceable container IDs strengthen evidence. Where applicable, results feed into material passports and client reporting frameworks.<\/p>\n<h2>Occupational safety, emissions, and environmental protection<\/h2>\n<p>Demolition sorting affects noise, dust, vibration, and shocks. Noise, vibration, dust generation and effects on adjacent components must be measured for the selected tools and compared with a defined alternative under equivalent conditions. Water mist systems, orderly staging, and short transport routes lower emissions. For all activities: appropriate PPE, secured zones, monitored load paths, and coordinated signals.<\/p>\n<ul>\n<li><strong>Practical controls:<\/strong> Wet cutting or misting for silica dust, local extraction in enclosed areas, and regular air monitoring.<\/li>\n<li><strong>Noise and vibration:<\/strong> Use of acoustic barriers, time windows, and vibration monitoring to protect neighbors and structures.<\/li>\n<li><strong>Environmental safeguards:<\/strong> Spill kits, protected drains, and covered containers to prevent soil and water contamination.<\/li>\n<\/ul>\n<h2>Logistics and space management on the construction site<\/h2>\n<p>The best sorting strategy fails without smart logistics. Required are:<\/p>\n<ol>\n<li>Zoning of the area into work, staging, and traffic zones.<\/li>\n<li>Clearly designated containers and storage areas per fraction with unambiguous labeling.<\/li>\n<li>Short routes between the demolition point and staging to avoid mixing.<\/li>\n<li>Takt planning for material removal to prevent congestion and double handling.<\/li>\n<li>Reserve areas for peaks and weather-related shifts.<\/li>\n<li>One-way traffic and a marshal concept to reduce conflicts and idle time.<\/li>\n<li>Digital container IDs and QR-coded signage to link fractions with documentation in the field.<\/li>\n<\/ol>\n<p>Tool changes and hydraulic supply must be planned to keep downtime low and ensure that single-grade purity does not suffer under time pressure.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li><strong>Unclear fraction definitions:<\/strong> Early alignment prevents mixed fractions.<\/li>\n<li><strong>Overly coarse pre-crushing:<\/strong> Avoid through targeted cuts with concrete demolition shears and controlled pre-splitting; fewer fines, better quality.<\/li>\n<li><strong>Mixing due to lack of staging order:<\/strong> Clear zones and short routes set standards.<\/li>\n<li><strong>Inappropriate tool selection:<\/strong> Splitters for thick, sensitive components; shears for metals; this raises separation precision.<\/li>\n<li><strong>Inadequate documentation:<\/strong> Ongoing weighing and logs secure records and optimization.<\/li>\n<li><strong>Insufficient pre-demolition audit:<\/strong> Omissions lead to rework and contamination; thorough investigation reduces surprises.<\/li>\n<li><strong>Neglecting emission constraints:<\/strong> Early consideration of noise, dust, and vibration limits avoids stoppages and redesign on site.<\/li>\n<\/ul>\n<h2>Cost-effectiveness and project success<\/h2>\n<p>Consistent demolition sorting lowers disposal costs, increases proceeds from metal fractions, and improves acceptance of recycled construction materials. Work methods with <strong>concrete demolition shears<\/strong> and <strong>rock and concrete splitters<\/strong> support high separation precision, reduce rework, and avoid costly mixed fractions. A robust takt, coordinated hydraulic supply, and clear workflows secure schedule and quality &#8211; and make the circular strategy in deconstruction measurably successful. Procurement specifications that define purity thresholds, handover conditions, and minimum recycling rates anchor targets contractually and improve outcomes.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Demolition sorting is a core step of selective deconstruction. It determines recycling rates, disposal costs, emissions, and the quality of the recovered secondary raw materials. The more consistently materials such as concrete, steel, masonry, wood, gypsum, plastics, and cables are systematically separated, the more efficiently material cycles can be closed. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18908","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Demolition Sorting | Construction Waste Recycling<\/title>\n<meta name=\"description\" content=\"Master demolition sorting for selective deconstruction \u2713 source separation, recycling KPIs and disposal logistics.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Demolition Sorting | Construction Waste Recycling\" \/>\n<meta property=\"og:description\" content=\"Master demolition sorting for selective deconstruction \u2713 source separation, recycling KPIs and disposal logistics.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:01+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-sorting\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-sorting\",\"name\":\"Demolition Sorting | Construction Waste Recycling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-01T14:39:21+00:00\",\"dateModified\":\"2026-09-12T17:53:01+00:00\",\"description\":\"Master demolition sorting for selective deconstruction \u2713 source separation, recycling KPIs and disposal logistics.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-sorting#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-sorting\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-sorting#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Demolition sorting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Demolition Sorting | Construction Waste Recycling","description":"Master demolition sorting for selective deconstruction \u2713 source separation, recycling KPIs and disposal logistics.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting","og_locale":"en_US","og_type":"article","og_title":"Demolition Sorting | Construction Waste Recycling","og_description":"Master demolition sorting for selective deconstruction \u2713 source separation, recycling KPIs and disposal logistics.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:01+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting","url":"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting","name":"Demolition Sorting | Construction Waste Recycling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-01T14:39:21+00:00","dateModified":"2026-09-12T17:53:01+00:00","description":"Master demolition sorting for selective deconstruction \u2713 source separation, recycling KPIs and disposal logistics.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/demolition-sorting#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Demolition sorting"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18908"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18908\/revisions"}],"predecessor-version":[{"id":29059,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18908\/revisions\/29059"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}