{"id":18904,"date":"2025-11-03T10:53:04","date_gmt":"2025-11-03T09:53:04","guid":{"rendered":"https:\/\/www.darda.de\/deconstruction-concept"},"modified":"2026-03-21T17:22:02","modified_gmt":"2026-03-21T16:22:02","slug":"deconstruction-concept","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept","title":{"rendered":"Deconstruction concept"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A deconstruction concept is the central planning document for the orderly, safe, and resource-efficient deconstruction of structures and facilities. It brings together technical, organizational, and environmental aspects and defines which methods &#8211; such as splitting, crushing, or cutting &#8211; and which tools, for example <em>concrete pulverizers<\/em> or <em>hydraulic splitters<\/em>, are used to execute the work. Especially in concrete demolition, special demolition, as well as in rock excavation and tunnel construction, a well-developed concept ensures manageable risks, clear processes, and adherence to quality and protection targets. In addition, it provides a traceable basis for permits, stakeholder communication, and later documentation of performance and compliance.<\/p>\n<h2>Definition: What is meant by a deconstruction concept?<\/h2>\n<p>A deconstruction concept is understood to be the systematic, written planning of the deconstruction of structures, structural components, or technical installations, including a survey of the existing condition, the selection of suitable <strong>demolition methods<\/strong>, the specification of safety and environmental protection measures, the allocation of equipment and personnel, as well as logistics and disposal. The concept prioritizes <strong>safety<\/strong>, <strong>structural stability<\/strong>, <strong>emission minimization<\/strong> (dust, noise, vibrations), <strong>resource efficiency<\/strong>, and <strong>documentation<\/strong>. Depending on the task, specific tools are specified, such as <em>concrete pulverizers<\/em> for selective crushing of reinforced concrete or <em>hydraulic splitters<\/em> for low-vibration separation, supplied by suitable <em>hydraulic power packs<\/em>. Where boundary conditions or risks change, the concept is updated with version control so that duties, assumptions, and residual risks remain transparent.<\/p>\n<h2>Goals and requirements of a deconstruction concept<\/h2>\n<p>A robust deconstruction concept translates project goals into precise, verifiable requirements. These include:<\/p>\n<ul>\n<li>Safe, controlled deconstruction without impermissible impairment of the structural stability of adjacent components<\/li>\n<li>Method selection suited to the structural system, materials, and installation conditions (e.g., <em>concrete pulverizer<\/em> instead of percussive breaking in sensitive areas)<\/li>\n<li>Minimization of emissions (dust, noise, vibrations) and protection of personnel and neighbors<\/li>\n<li>Resource conservation through source-separated sorting, reuse, and recycling<\/li>\n<li>Transparent schedule and cost control with measurable milestones<\/li>\n<li>Compliance with legal requirements and permits in general terms, including documentation of relevant evidence<\/li>\n<li>Defined responsibilities and interfaces across planning, execution, monitoring, and disposal<\/li>\n<li>KPIs for safety, emissions, and recycling quotas to enable objective performance tracking<\/li>\n<\/ul>\n<h2>Existing-condition survey and preliminary investigation<\/h2>\n<p>The basis of every decision is a careful investigation. It includes drawings, site inspections, material sampling, and analysis of the building history. Particular attention is paid to load-bearing components, reinforcement, embedded parts, cable and utility routing, as well as spatial constraints for equipment logistics. Where necessary, non-destructive testing, 3D scans, and utility detection complement the survey to reduce uncertainty and avoid conflicts in later phases.<\/p>\n<h3>Hazardous substances and contaminant management<\/h3>\n<p>A detailed hazardous substance register (e.g., asbestos, mineral wool, PCB, PAH) is to be prepared before execution. Remediation and disposal steps are to be defined prior to the actual deconstruction. Notes here are always to be understood in general terms; binding specifications result from the respective applicable standards and regulatory requirements. Responsibilities, qualified personnel, and clearance criteria are to be documented, including negative findings and chain-of-custody records.<\/p>\n<h2>Structural analysis for demolition and method selection<\/h2>\n<p>The structural analysis assesses load paths, stress redistributions, and the sequence of component removal. From this, the suitable method is derived. For massive concrete components, the choice often lies between <em>splitting<\/em>, <em>cutting<\/em>, and <em>crushing<\/em>. <strong>Concrete pulverizers<\/strong> enable controlled biting of reinforced concrete and are advantageous for selective interventions in existing structures. <strong>Hydraulic splitters<\/strong> and <strong>rock wedge splitters<\/strong> enable low-vibration separation, for example near sensitive installations or in special operations when blasting is excluded. Temporary supports, shoring, and staged load release are to be verified so that stability is ensured for each interim state, with fallback methods defined in case of deviations.<\/p>\n<h3>Blasting-free, low-vibration methods<\/h3>\n<p>Splitting technology reduces vibrations and is predestined for tunnel construction, rock excavation in urban environments, and special demolition. Concrete pulverizers and combination shears operate with high cutting and pressing force even with limited access, which is particularly beneficial in confined existing structures. Crack initiation, propagation control, and sequencing must be coordinated to protect adjacent structures and installations.<\/p>\n<h3>Hydraulic supply<\/h3>\n<p>The selection of suitable <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em> and their performance parameters (flow rate, pressure, number of parallel outlets) is an integral part of the deconstruction concept. The power supply must be matched to the combination of concrete pulverizers, Multi Cutters, steel shears, tank cutters, and splitters.<\/p>\n<ul>\n<li>Dimensioning accounts for hose lengths, pressure losses, and ambient conditions<\/li>\n<li>Energy source, redundancy, and maintenance access are planned for continuous operation<\/li>\n<li>Noise and exhaust management of power units are integrated into emission control<\/li>\n<\/ul>\n<h2>Equipment concept and logistics<\/h2>\n<p>A clearly structured equipment concept defines tools, accessories, and hydraulic supply and describes transport routes, storage areas, and assembly and disassembly steps on site. Where space is limited, compact, handheld tools with external hydraulic power packs are often advantageous. Access widths, floor load capacities, lifting gear, and staging areas are coordinated early to avoid bottlenecks.<\/p>\n<h3>Tool selection and combinations<\/h3>\n<ul>\n<li><strong>Concrete pulverizers<\/strong> for selective crushing of reinforced concrete, e.g., at slab edges, beams, and walls<\/li>\n<li><strong>Hydraulic splitters<\/strong> and <strong>rock wedge splitters<\/strong> for low-vibration separation of thick components or rock<\/li>\n<li><strong>Combination shears<\/strong> and <strong>Multi Cutters<\/strong> for mixed materials, reinforcement, and sections<\/li>\n<li><strong>Steel shears<\/strong> for steel sections, beams, reinforcement bundles<\/li>\n<li><strong>Tank cutters<\/strong> for vessels, boilers, and pipelines in industrial contexts<\/li>\n<li><strong>Hydraulic power packs<\/strong> to supply multiple tools with coordinated output<\/li>\n<li>Auxiliary equipment such as dust suppression attachments and quick-change systems to increase efficiency<\/li>\n<\/ul>\n<h3>Accessibility and work cycles<\/h3>\n<p>The concept describes how tools are brought into working position, which aids (lifting equipment) are required, and at what cycle components are crushed, separated, and hauled away. Takt planning links tool changeovers, material removal, and quality checks to stabilize output and minimize idle time.<\/p>\n<h2>Areas of application and typical scenarios<\/h2>\n<p>Deconstruction concepts differ depending on the task. Examples:<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> controlled crushing with concrete pulverizers, supplemented by splitting technology for massive areas sensitive to vibrations.<\/li>\n<li><strong>Building gutting and cutting:<\/strong> precise separation of non-load-bearing components, lines, and fit-outs; Multi Cutters, steel shears, and tank cutters structure the workflow.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> rock wedge splitters and hydraulic splitters enable blasting-free, directed separations; concrete pulverizers process segmental linings or concrete support elements.<\/li>\n<li><strong>Natural stone extraction:<\/strong> splitting technology for defined fracture faces; logistics for careful extraction and transport.<\/li>\n<li><strong>Bridge and infrastructure works:<\/strong> staged removal near live traffic with low-vibration methods and strict emission management.<\/li>\n<li><strong>Special deployments:<\/strong> work in potentially explosive atmospheres, under confined conditions, or during ongoing operations with particularly low emissions.<\/li>\n<\/ul>\n<h2>Occupational safety, environmental, and permitting aspects<\/h2>\n<p>The deconstruction concept contains the fundamentals of safety and health protection (e.g., barriers, safety distances, emergency routes) as well as measures for dust suppression and noise reduction. Vibration management is central in sensitive neighborhoods. Legal requirements must be checked for each project; the aspects mentioned here are general in nature and do not replace case-by-case assessment. Task risk assessments, permit-to-work procedures, and lockout-tagout for energy sources are to be incorporated and verified before execution.<\/p>\n<h2>Resource efficiency and circular economy<\/h2>\n<p>Source-separated sorting begins at the component. By targeted use of concrete pulverizers, reinforcing steel and concrete can be separated, improving recyclability. Splitting technology produces defined fracture edges, favors fewer fines, and facilitates subsequent material flow control. Pre-demolition audits and material passports support documentation and raise recovery rates.<\/p>\n<h3>Construction material separation and reuse<\/h3>\n<ul>\n<li>Early separation of steel, concrete, masonry, timber, plastics<\/li>\n<li>Gentle deconstruction to harvest reusable components<\/li>\n<li>Documentation of mass flows for evidence and optimization<\/li>\n<li>On-site processing with defined particle size distributions to meet end-use specifications<\/li>\n<\/ul>\n<h2>Process structure and phase planning<\/h2>\n<p>A clear phase logic increases transparency and controllability:<\/p>\n<ol>\n<li>Analysis: documentation, investigations, structural and emissions assessment<\/li>\n<li>Concept: method selection, tool set, hydraulic power packs, safety measures<\/li>\n<li>Preparation: site setup, contaminant remediation, trial steps<\/li>\n<li>Deconstruction: cycle-based execution, measurement and quality control<\/li>\n<li>Post-processing: processing, disposal certificates, final documentation<\/li>\n<\/ol>\n<p>Gate reviews with defined acceptance criteria between phases help manage change, align stakeholders, and protect schedule and budget integrity.<\/p>\n<h2>Measurement and monitoring concept<\/h2>\n<p>Monitoring measures ensure quality and protect the surroundings. Baseline measurements precede work so that changes can be attributed reliably, and acceptance thresholds are defined contractually.<\/p>\n<h3>Ground vibration and structural monitoring<\/h3>\n<p>Monitoring points at critical locations, limit values according to generally accepted rules, and continuous evaluation. Splitting technology and concrete pulverizers help to maintain limit values. Trigger levels, automatic alarms, and documented response plans ensure prompt corrective action.<\/p>\n<h3>Dust and noise<\/h3>\n<p>Misting, extraction, and pacing of work steps. Tool selection with low emission profiles is part of the concept. Acoustic screens, silencers, and enclosure techniques further reduce immissions where sensitive receptors are nearby.<\/p>\n<h2>Interface management and communication<\/h2>\n<p>A good deconstruction concept assigns responsibilities and defines information pathways between the client, planning participants, execution, disposal companies, and &#8211; where required &#8211; authorities. Digital existing-condition models and regular situation reports support management. Clear escalation paths, issue logs, and defined reporting intervals maintain coordination across shifts and contractors.<\/p>\n<h2>Cost and schedule control<\/h2>\n<p>With the choice of efficient methods, e.g., the combined use of concrete pulverizers and hydraulic splitters, work cycles can be stabilized and interfaces reduced. Buffers in logistics (transport, container changeovers) secure the schedule chain. Earned value techniques, quantity-based progress tracking, and disciplined change control provide transparency and early warning signals.<\/p>\n<h2>Quality criteria for a robust deconstruction concept<\/h2>\n<ul>\n<li>Complete existing-condition and hazardous-substance data<\/li>\n<li>Plausible, structurally justified deconstruction sequence<\/li>\n<li>Tool and hydraulic planning suited to material and access<\/li>\n<li>Emission management with measurable targets<\/li>\n<li>Resource and disposal concept with documentation<\/li>\n<li>Safety and communication structure<\/li>\n<li>Contingency planning with verified fallback methods<\/li>\n<li>Defined acceptance criteria for interim and final states<\/li>\n<\/ul>\n<h2>Examples of methodological decisions<\/h2>\n<p>Massive reinforced concrete slab above sensitive occupancy: set relief boreholes, release the slab with hydraulic splitters, then reduce edges with concrete pulverizers &#8211; low vibrations, good separation quality. Deconstruction of a beam grid: pre-cut with steel shears, densify the cycles with Multi Cutters; reinforcement bundles are hauled away separately. Industrial tank: gas-free measurements, controlled opening with tank cutters, flanked by extraction and fire protection measures. Confined shaft: splitting technology to relieve stresses, followed by selective crushing with compact tools to control fragment size and removal path.<\/p>\n<h2>Planning depth and documentation<\/h2>\n<p>The deconstruction concept typically comprises site plans, component catalogs, deconstruction stages, equipment and tool lists (including <em>hydraulic power packs<\/em>), inspection and test plans, and disposal pathways. Seamless documentation facilitates later proof and optimization. Versioning, sign-offs, and as-built records ensure traceability and support audits or claims management.<\/p>\n<h2>Minimizing typical planning risks<\/h2>\n<ul>\n<li>Unclear structural assumptions: plan exploratory openings and probes in advance<\/li>\n<li>Underestimated emissions: prioritize methods with low immissions (e.g., splitting, pulverizers)<\/li>\n<li>Logistics bottlenecks: schedule material flow early, define intermediate storage<\/li>\n<li>Tool mismatch: align tool sizing and hydraulic performance<\/li>\n<li>Permitting sequence gaps: align approvals with phase gates to avoid idle time<\/li>\n<li>Communication deficits: fix interfaces, reporting formats, and escalation rules upfront<\/li>\n<\/ul>\n<h2>Method comparison: cutting, splitting, crushing<\/h2>\n<p>Splitting excels where low vibration levels and massive cross-sections are involved; <strong>concrete pulverizers<\/strong> play to their strengths in selective removal, exposing reinforcement, and controlled edge trimming. Cutting methods (combination shears, Multi Cutters, steel shears, tank cutters) structure metals and mixed materials, create manageable piece sizes, and improve material flow separation. The deconstruction concept combines these methods so that safety, quality, and resource efficiency work together optimally. In practice, hybrid approaches with clearly defined changeovers often yield the best balance of control, productivity, and environmental performance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A deconstruction concept is the central planning document for the orderly, safe, and resource-efficient deconstruction of structures and facilities. It brings together technical, organizational, and environmental aspects and defines which methods &#8211; such as splitting, crushing, or cutting &#8211; and which tools, for example concrete pulverizers or hydraulic splitters, are <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-18904","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction Concept for Structural Demolition<\/title>\n<meta name=\"description\" content=\"Plan safe, low vibration demolition with a deconstruction concept for buildings and tunnels \u27a4 methods, tools, safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction Concept for Structural Demolition\" \/>\n<meta property=\"og:description\" content=\"Plan safe, low vibration demolition with a deconstruction concept for buildings and tunnels \u27a4 methods, tools, safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-21T16:22:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-concept\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-concept\",\"name\":\"Deconstruction Concept for Structural Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-03T09:53:04+00:00\",\"dateModified\":\"2026-03-21T16:22:02+00:00\",\"description\":\"Plan safe, low vibration demolition with a deconstruction concept for buildings and tunnels \u27a4 methods, tools, safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-concept#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-concept\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-concept#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction concept\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction Concept for Structural Demolition","description":"Plan safe, low vibration demolition with a deconstruction concept for buildings and tunnels \u27a4 methods, tools, safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept","og_locale":"en_US","og_type":"article","og_title":"Deconstruction Concept for Structural Demolition","og_description":"Plan safe, low vibration demolition with a deconstruction concept for buildings and tunnels \u27a4 methods, tools, safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-21T16:22:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept","name":"Deconstruction Concept for Structural Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-03T09:53:04+00:00","dateModified":"2026-03-21T16:22:02+00:00","description":"Plan safe, low vibration demolition with a deconstruction concept for buildings and tunnels \u27a4 methods, tools, safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-concept#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction concept"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18904"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18904\/revisions"}],"predecessor-version":[{"id":24337,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18904\/revisions\/24337"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}