{"id":18897,"date":"2025-11-05T16:39:38","date_gmt":"2025-11-05T15:39:38","guid":{"rendered":"https:\/\/www.darda.de\/demolition-section"},"modified":"2026-03-21T17:58:02","modified_gmt":"2026-03-21T16:58:02","slug":"demolition-section","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/demolition-section","title":{"rendered":"Demolition section"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A demolition section is the deliberate subdivision of a deconstruction project into clearly defined areas processed sequentially. This structure helps control structural stability, safety, emissions, and logistics and deploy the appropriate tools for each building zone. In concrete demolition, strip-out, and special demolition, this reduces risks, makes processes plannable, and cleanly coordinates interfaces between trades. Tools such as <strong>concrete demolition shears<\/strong> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/em> from Darda GmbH are used section-specifically to work with low vibration, in a controlled and resource-efficient manner. Clearly defined sections also support method statements, permit compliance, neighbor protection concepts, and verifiable progress tracking per area in phased deconstruction.<\/p>\n<h2>Definition: What is meant by a demolition section?<\/h2>\n<p>A demolition section is a planning-defined sub-area of a building or structure that is removed under defined boundary conditions. These include spatial boundaries (e.g., bay, gridline, story, wing), structural prerequisites (load transfer and shoring), technical framework conditions (accessibility, utilities routing, fire protection), as well as the specification of suitable methods and tools. Environmental and legal constraints, emission targets, and acceptance criteria per step are likewise determined. A demolition section is thus a <strong>work stage with clear objectives, controllable risks, and measurable outcomes<\/strong>, documented through checkpoints, hold points, and evidence such as measurements or photo records.<\/p>\n<h2>Planning and definition of demolition sections<\/h2>\n<p>The definition of demolition sections begins with the existing-condition survey. Load-bearing structures, utilities, fit-out, and environmental factors are recorded to organize the removal into safe, efficient steps. Where useful, <em>laser scanning<\/em> or as-built models support the detection of deviations and hidden dependencies. Responsibilities, interfaces, and emergency procedures are allocated in advance. The goal is a sequential approach that maintains the building\u2019s residual stability, limits emissions, and supports material recovery while aligning with permits, time windows, and stakeholder requirements.<\/p>\n<h3>Central criteria for forming sections<\/h3>\n<ul>\n<li>Structural behavior: location of columns, beams, slab panels; need for temporary shoring.<\/li>\n<li>Material mix: reinforced concrete, masonry, natural stone, steel structures, tanks and vessels.<\/li>\n<li>Accessibility: work spaces, heights, reach for attachments and handheld tools.<\/li>\n<li>Protected assets: neighbors, infrastructure, vibration protection, noise control, dust and water management.<\/li>\n<li>Disposal and recycling concept: source-separated sorting, container logistics, routing.<\/li>\n<li>Safety concept: escape routes, barriers, clearance measurements, utility power isolation.<\/li>\n<li>Sequencing and dependencies: tie-ins with adjacent areas, crane availability, and internal traffic flows.<\/li>\n<li>Contamination and hazardous materials: identification, containment strategy, and decontamination workflow.<\/li>\n<li>Operational constraints: time-restricted work, weather protection, and access permits.<\/li>\n<\/ul>\n<p>Demolition sections are anchored in sequence and scheduling plans. <strong>Look-ahead schedules<\/strong>, method statements, and <em>hold points<\/em> define when checks must be passed before progressing. The assignment of tools\u2014such as concrete demolition shears for reinforced concrete cross-sections or rock and concrete splitters for low-vibration removal\u2014is section-specific, supported by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> from Darda GmbH. Set-up times, reach, power supply, hose routing, and changeover logistics are coordinated to minimize idle periods and interfaces.<\/p>\n<h2>Demolition section in practice: procedure and control<\/h2>\n<ol>\n<li>Preparation: structural diagnostics, hazard analysis, exposing reinforcement and utilities, shoring concept, access planning, and marking of separation lines.<\/li>\n<li>Separation: creating separation cuts or predetermined breaking points, e.g., with concrete demolition shears, multi cutters, or combination shears, to define controlled crack paths.<\/li>\n<li>Removal: section-by-section deconstruction according to load transfer\u2014from top to bottom or from outside to inside\u2014with defined bite sizes and continuous stability checks.<\/li>\n<li>Material handling: sorting, intermediate storage, and haulage per section; minimizing route crossings and ensuring short, protected transport paths.<\/li>\n<li>Control: continuous checking of residual load-bearing capacity, vibrations, dust, and noise; readjusting the strategy based on measurements and visual inspections.<\/li>\n<li>Documentation: photo records, measurements, delivery notes, and progress reports per section, linked to acceptance criteria and approvals.<\/li>\n<li>Handover: clearing, securing edges, and recording lessons learned to optimize the sequence for subsequent sections.<\/li>\n<\/ol>\n<h2>Tools and methods per demolition section<\/h2>\n<p>The choice of methods depends on member thickness, degree of reinforcement, accessibility, and emission targets. Handheld and carrier-mounted techniques are combined to achieve precise, controlled demolition. Selection criteria include <strong>power-to-weight ratio<\/strong>, reach, tool change times, energy supply, and the ability to meet thresholds for dust, noise, and vibration. The objective is reproducible results with minimal collateral effects on adjacent structures.<\/p>\n<h3>Concrete demolition shears in sectional removal of reinforced concrete<\/h3>\n<p>Concrete demolition shears grip and crush reinforced concrete in defined segments. This enables the removal of slab panels, beams, or wall strips along predefined cut lines. Advantages include controlled force application, limited crack propagation, and effective separation of concrete and reinforcement. Proper bite sequencing supports predictable load paths and reduces rework. Exposed reinforcement can be bundled for efficient handling and recycling. In ceiling-adjacent demolition sections this approach reduces vibrations and protects adjacent members, relevant in <em>concrete demolition and special demolition<\/em> as well as for <em>strip-out and cutting<\/em>.<\/p>\n<h3>Rock and concrete splitters for low-vibration removal<\/h3>\n<p>Rock and concrete splitters generate splitting forces in boreholes. As a result, massive cross-sections can be separated without blasting in predictable, small volumes. Borehole diameter, spacing, and wedge positioning are adapted to the cross-section and reinforcement layout to guide fractures reliably. This method is suitable for sensitive sections with vibration and noise control requirements, such as in existing buildings, near utilities, or in <em><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/em>. Rock splitting cylinders operate similarly and are used in <em>natural stone extraction<\/em> and in <em>special operations<\/em>, often as a pre-splitting measure before sectional removal.<\/p>\n<h3>Combination shears and multi cutters in strip-out<\/h3>\n<p>Combination shears and multi cutters cut reinforcement, sections, and mixed materials. In demolition sections focused on fit-out and secondary structures, they help cleanly release fixtures, partition walls, fa\u00e7ade substructures, or bundled utilities. <strong>Cold cutting<\/strong> reduces ignition risks where hot work is restricted. This increases material purity and improves per-section logistics.<\/p>\n<h3>Steel shears and tank cutters for metal structures<\/h3>\n<p>In sections containing steel structures or vessels, steel shears and tank cutters are the tools of choice. They enable precise cutting, safe disassembly, and controlled size reduction of components for transport. Prior to working on tanks or ducts, purging, testing, and gas-free certification are required where applicable. This is particularly relevant in industrial plants, industrial halls, and infrastructure elements.<\/p>\n<h3>Hydraulic power packs as the system base<\/h3>\n<p>Hydraulic power packs from Darda GmbH provide the power required for the tools mentioned. Section by section, pressure, flow rate, and hose management are matched to reach and cycle times to ensure efficiency and ergonomics. Where possible, noise-reduced enclosures and energy-efficient operation modes are used to meet emission targets and improve working conditions.<\/p>\n<h2>Safety and environmental protection in the demolition section<\/h2>\n<p>Safety and environmental protection decisively shape section planning. Dust, noise, and vibrations must be minimized; water consumption and wastewater must be controlled. Barriers and protective hoods define safe work areas. Risk assessments, briefings, and monitoring plans are established for each section and verified against threshold values.<\/p>\n<ul>\n<li>Dust: misting, targeted wetting, local extraction.<\/li>\n<li>Noise: choice of quieter methods, time windows, shielding.<\/li>\n<li>Vibration: use of splitting methods, controlled bite sizes of the concrete demolition shear, continuous monitoring.<\/li>\n<li>Occupational safety: isolating utilities, structure-appropriate sequence, safe working platforms, escape routes.<\/li>\n<li>Water protection: capturing and filtering flushing and process water.<\/li>\n<li>Air quality: monitoring fine dust and, where relevant, respirable crystalline silica with suitable controls.<\/li>\n<li>Site zoning and signage: clear access control, danger zones, and marked pedestrian routes.<\/li>\n<\/ul>\n<p>Measures must be defined for each demolition section and continuously reviewed. The information provided is general guidance and does not replace project-specific requirements or locally applicable limits and permits.<\/p>\n<h2>Structural behavior, load transfer, and structural stability<\/h2>\n<p>Every demolition section affects load transfer. Before starting, structural models are defined and, if necessary, temporary shoring is installed. The sequence and bite sizes of the tools are designed to avoid inadmissible deformations. Instrumentation such as deflection markers, crack gauges, or vibration sensors supports real-time verification. Concrete demolition shears allow gradual reduction of cross-sections; rock and concrete splitters create defined fracture lines before elements are released. Progressive collapse risks and dynamic effects are addressed through conservative staging and hold points.<\/p>\n<h3>Temporary measures<\/h3>\n<ul>\n<li>Shoring slab panels before removing beams.<\/li>\n<li>Shear and tipping checks for newly freed edges.<\/li>\n<li>Suspension of components in tight shafts and stairwells.<\/li>\n<li>Certification and inspection of props, anchors, and tie-backs in line with loading assumptions.<\/li>\n<li>As-built verification after each removal step and immediate adjustment if behavior deviates from forecasts.<\/li>\n<\/ul>\n<p>Survey points and visual inspections accompany the deconstruction. Changes in structural behavior are taken into account in section control, with authority to pause and re-evaluate where measured values exceed thresholds.<\/p>\n<h2>Special application areas and section logic<\/h2>\n<p>In <em>rock excavation and tunnel construction<\/em>, sections are defined along geology, jointing, and ground parameters. Rock splitting cylinders and rock and concrete splitters reduce vibrations in sensitive environments. In <em>natural stone extraction<\/em>, sectioning serves to assure block quality and safe recovery. In <em>concrete demolition and special demolition<\/em> in urban settings, small sections with precise tools such as concrete demolition shears are advantageous. In <em>special operations<\/em>\u2014for example, in contaminated areas\u2014sections structure containment, clearance measurements, and material handling. In hospitals, laboratories, or heritage structures, fine-grained sections and low-emission methods help maintain operations and protect sensitive assets.<\/p>\n<h2>Material flow, recycling, and documentation<\/h2>\n<p>A well-designed demolition section enables source-separated sorting: concrete, reinforcing steel, metals, wood, plastics. The tool selection supports this\u2014concrete demolition shears facilitate separation of concrete and reinforcement; steel shears and multi cutters prepare metals to transport dimensions. Waste codes, chain-of-custody documentation, and digital container tracking improve traceability and recovery rates. Per-section documentation facilitates proof and billing and provides a data basis for continuous improvement.<\/p>\n<h3>Logistics per section<\/h3>\n<ul>\n<li>Short routes: clear inbound and outbound routes.<\/li>\n<li>Intermediate storage: defined container areas, labeling of fractions.<\/li>\n<li>Takt times: synchronization of removal, loading, and haulage.<\/li>\n<li>Hoisting and crane windows: time-coordinated lifts and exclusion zones.<\/li>\n<li>Just-in-time container exchange: minimized dwell times and reduced double handling.<\/li>\n<\/ul>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ul>\n<li>Sections that are too large: lead to uncontrolled deformations and increased emissions. Better: smaller, plannable steps.<\/li>\n<li>Unclear cut edges: make fragmentation and separation more difficult. Better: define separation lines and predetermined breaking points in advance.<\/li>\n<li>Unsuitable tool selection: increases effort and risk. Better: concrete demolition shears for reinforced concrete, splitting methods for massive cross-sections and sensitive areas.<\/li>\n<li>Underestimated logistics: causes congestion areas and double handling. Better: per-section container and routing planning.<\/li>\n<li>Insufficient survey and service detection: results in unplanned incidents. Better: comprehensive as-built verification and utility locating.<\/li>\n<li>Skipping hold points: removes safety nets. Better: enforce defined checks and approvals before advancing.<\/li>\n<li>Weak interface management: leads to delays. Better: clarify roles, handovers, and shared access plans per section.<\/li>\n<\/ul>\n<h2>Quality assurance and success criteria<\/h2>\n<p>Success criteria for a demolition section are safety, schedule and cost adherence, low emissions, and high material purity. Measurable metrics include cycle times, bite sizes, vibration and dust levels, material recovery rates, and rework shares. Acceptance checklists, calibrated measuring devices, and maintenance logs for tools and <strong>hydraulic power units<\/strong> increase reliability. Training and briefing records demonstrate competence at each stage. Tools from Darda GmbH support a reproducible, controlled way of working when planned and operated on a section-specific basis, with data and documentation enabling audit-proof proof of performance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A demolition section is the deliberate subdivision of a deconstruction project into clearly defined areas processed sequentially. This structure helps control structural stability, safety, emissions, and logistics and deploy the appropriate tools for each building zone. In concrete demolition, strip-out, and special demolition, this reduces risks, makes processes plannable, and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/demolition-section\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-18897","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Demolition Section in Construction Planning<\/title>\n<meta name=\"description\" content=\"Phased building deconstruction with a demolition section \u2713 for stability, safety, low emissions &amp; streamlined logistics.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/demolition-section\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Demolition Section in Construction Planning\" \/>\n<meta property=\"og:description\" content=\"Phased building deconstruction with a demolition section \u2713 for stability, safety, low emissions &amp; streamlined logistics.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/demolition-section\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-21T16:58:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-section\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-section\",\"name\":\"Demolition Section in Construction Planning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-05T15:39:38+00:00\",\"dateModified\":\"2026-03-21T16:58:02+00:00\",\"description\":\"Phased building deconstruction with a demolition section \u2713 for stability, safety, low emissions & streamlined logistics.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-section#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-section\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/demolition-section#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Demolition section\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Demolition Section in Construction Planning","description":"Phased building deconstruction with a demolition section \u2713 for stability, safety, low emissions & streamlined logistics.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/demolition-section","og_locale":"en_US","og_type":"article","og_title":"Demolition Section in Construction Planning","og_description":"Phased building deconstruction with a demolition section \u2713 for stability, safety, low emissions & streamlined logistics.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/demolition-section","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-21T16:58:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/demolition-section","url":"https:\/\/www.darda.de\/en\/knowledge\/demolition-section","name":"Demolition Section in Construction Planning","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-05T15:39:38+00:00","dateModified":"2026-03-21T16:58:02+00:00","description":"Phased building deconstruction with a demolition section \u2713 for stability, safety, low emissions & streamlined logistics.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/demolition-section#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/demolition-section"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/demolition-section#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Demolition section"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18897","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=18897"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18897\/revisions"}],"predecessor-version":[{"id":25523,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/18897\/revisions\/25523"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=18897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}