{"name":"Darda GmbH","description":"","url":"https:\/\/www.darda.de","home":"https:\/\/www.darda.de\/en","gmt_offset":1,"timezone_string":"Europe\/Berlin","page_for_posts":0,"page_on_front":361,"show_on_front":"page","namespaces":["oembed\/1.0","wpml\/v1","aioseo404To301\/v1","404-to-301\/v1","cms-tpv\/v1","indexnow\/v_1.0.4","matomo\/v1","members\/v1","real-media-library\/v1","real-product-manager-wp-client\/v1","real-utils\/v1","safe-svg\/v1","wordfence-login-security\/v1","wordfence\/v1","yoast\/v1","wp-all-import\/v1","wpml\/st\/v1","wpml\/tm\/v1","wpml\/ate\/v1","duplicate-post\/v1","if-menu\/v1","wp-mail-smtp\/v1","wp-mail-smtp\/setup-wizard\/v1","llar\/v1","realmedialibrary\/v1","otgs\/installer\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":[],"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/oembed\/1.0\/proxy"}]}},"\/wpml\/v1":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1"}]}},"\/wpml\/v1\/ate\/connection":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/ate\/connection"}]}},"\/wpml\/v1\/ate\/connection\/probe":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/ate\/connection\/probe"}]}},"\/wpml\/v1\/ate\/connection\/hide-support":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/ate\/connection\/hide-support"}]}},"\/wpml\/v1\/dashboard\/taxonomies":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"since":{"type":"string","required":false},"search":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/dashboard\/taxonomies"}]}},"\/wpml\/v1\/dashboard\/taxonomies\/rescan-labels":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomy":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/dashboard\/taxonomies\/rescan-labels"}]}},"\/wpml\/v1\/dashboard\/taxonomies\/translate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"selectedTaxonomies":{"type":"array","required":true},"selectedLabels":{"type":"array","default":[],"required":false},"languageCodes":{"type":"array","required":false},"alreadyTranslated":{"type":"string","default":"leave","required":false},"whenFinished":{"type":"string","default":"publish","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/dashboard\/taxonomies\/translate"}]}},"\/wpml\/v1\/custom-xml-config":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"content":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/custom-xml-config"}]}},"\/wpml\/v1\/custom-xml-config\/validate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"content":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/custom-xml-config\/validate"}]}},"\/aioseo404To301\/v1":{"namespace":"aioseo404To301\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"aioseo404To301\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/aioseo404To301\/v1"}]}},"\/aioseo404To301\/v1\/options":{"namespace":"aioseo404To301\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/aioseo404To301\/v1\/options"}]}},"\/aioseo404To301\/v1\/objects":{"namespace":"aioseo404To301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/aioseo404To301\/v1\/objects"}]}},"\/aioseo404To301\/v1\/plugins\/deactivate":{"namespace":"aioseo404To301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/aioseo404To301\/v1\/plugins\/deactivate"}]}},"\/aioseo404To301\/v1\/plugins\/install":{"namespace":"aioseo404To301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/aioseo404To301\/v1\/plugins\/install"}]}},"\/aioseo404To301\/v1\/settings\/toggle-radio":{"namespace":"aioseo404To301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/aioseo404To301\/v1\/settings\/toggle-radio"}]}},"\/aioseo404To301\/v1\/settings\/items-per-page":{"namespace":"aioseo404To301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/aioseo404To301\/v1\/settings\/items-per-page"}]}},"\/404-to-301\/v1":{"namespace":"404-to-301\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"404-to-301\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1"}]}},"\/404-to-301\/v1\/settings":{"namespace":"404-to-301\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"settings":{"type":"object","description":"Flat settings payload \u2014 only known keys are written.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/settings"}]}},"\/404-to-301\/v1\/settings\/export":{"namespace":"404-to-301\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/settings\/export"}]}},"\/404-to-301\/v1\/settings\/import":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"settings":{"type":"object","description":"Settings payload \u2014 the `settings` object from a prior export envelope.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/settings\/import"}]}},"\/404-to-301\/v1\/logs":{"namespace":"404-to-301\/v1","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","default":1,"required":false},"per_page":{"type":"integer","default":20,"required":false},"orderby":{"type":"string","default":"updated_at","required":false},"order":{"type":"string","enum":["ASC","DESC","asc","desc"],"default":"DESC","required":false},"search":{"type":"string","required":false},"status":{"type":"integer","enum":[0,1,2],"required":false},"date_from":{"type":"string","required":false},"date_to":{"type":"string","required":false},"referrer":{"type":"string","enum":["internal","external","none"],"required":false},"kind":{"type":"string","enum":["content","asset"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"ids":{"type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/logs"}]}},"\/404-to-301\/v1\/logs\/summary":{"namespace":"404-to-301\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/logs\/summary"}]}},"\/404-to-301\/v1\/logs\/purge":{"namespace":"404-to-301\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/logs\/purge"}]}},"\/404-to-301\/v1\/logs\/bulk-update":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","items":{"type":"integer"},"required":true},"status":{"type":"integer","enum":[0,1,2],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/logs\/bulk-update"}]}},"\/404-to-301\/v1\/logs\/(?P<id>\\d+)":{"namespace":"404-to-301\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"status":{"type":"integer","enum":[0,1,2],"required":false},"redirect_id":{"type":"integer","required":false},"override_redirect":{"type":"integer","enum":[0,1,2],"required":false},"override_email":{"type":"integer","enum":[0,1,2],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/404-to-301\/v1\/redirects":{"namespace":"404-to-301\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","default":1,"required":false},"per_page":{"type":"integer","default":20,"required":false},"orderby":{"type":"string","default":"id","required":false},"order":{"type":"string","enum":["ASC","DESC","asc","desc"],"default":"DESC","required":false},"search":{"type":"string","required":false},"match_type":{"type":"string","enum":["exact","prefix","regex"],"required":false},"target_type":{"type":"string","enum":["link","page","none"],"required":false},"redirect_type":{"type":"integer","required":false},"is_active":{"type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"source":{"type":"string","required":true},"match_type":{"type":"string","enum":["exact","prefix","regex"],"required":false},"target_type":{"type":"string","enum":["link","page","none"],"required":false},"target_url":{"type":"string","required":false},"target_page_id":{"type":"integer","required":false},"redirect_type":{"type":"integer","enum":[301,302,303,307,308,410,451],"required":false},"is_active":{"type":"boolean","required":false},"notes":{"type":"string","required":false},"query_handling":{"type":"string","enum":["ignore","preserve","require"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"ids":{"type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/redirects"}]}},"\/404-to-301\/v1\/redirects\/summary":{"namespace":"404-to-301\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/redirects\/summary"}]}},"\/404-to-301\/v1\/redirects\/bulk-update":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","items":{"type":"integer"},"required":true},"is_active":{"type":"boolean","required":false},"redirect_type":{"type":"integer","enum":[301,302,303,307,308,410,451],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/redirects\/bulk-update"}]}},"\/404-to-301\/v1\/redirects\/(?P<id>\\d+)":{"namespace":"404-to-301\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"source":{"type":"string","required":false},"match_type":{"type":"string","enum":["exact","prefix","regex"],"required":false},"target_type":{"type":"string","enum":["link","page","none"],"required":false},"target_url":{"type":"string","required":false},"target_page_id":{"type":"integer","required":false},"redirect_type":{"type":"integer","enum":[301,302,303,307,308,410,451],"required":false},"is_active":{"type":"boolean","required":false},"notes":{"type":"string","required":false},"query_handling":{"type":"string","enum":["ignore","preserve","require"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/404-to-301\/v1\/imports\/sources":{"namespace":"404-to-301\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/imports\/sources"}]}},"\/404-to-301\/v1\/imports\/upload":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/imports\/upload"}]}},"\/404-to-301\/v1\/imports\/preview":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"source_id":{"type":"string","required":true},"csv_token":{"type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/imports\/preview"}]}},"\/404-to-301\/v1\/imports\/run":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"source_id":{"type":"string","required":true},"csv_token":{"type":"string","default":"","required":false},"offset":{"type":"integer","default":0,"required":false},"limit":{"type":"integer","default":100,"required":false},"update_existing":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/imports\/run"}]}},"\/404-to-301\/v1\/imports\/cleanup":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"csv_token":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/imports\/cleanup"}]}},"\/404-to-301\/v1\/migration":{"namespace":"404-to-301\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/migration"}]}},"\/404-to-301\/v1\/migration\/tick":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/migration\/tick"}]}},"\/404-to-301\/v1\/mcp\/install-adapter":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/mcp\/install-adapter"}]}},"\/404-to-301\/v1\/mcp\/app-password":{"namespace":"404-to-301\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/404-to-301\/v1\/mcp\/app-password"}]}},"\/cms-tpv\/v1":{"namespace":"cms-tpv\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"cms-tpv\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/cms-tpv\/v1"}]}},"\/cms-tpv\/v1\/tree":{"namespace":"cms-tpv\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"cms_tpv_post_type":{"type":"string","default":"page","required":false},"parent":{"type":"integer","default":0,"required":false},"view":{"type":"string","default":"all","enum":["all","all_with_trash","mine","publish","draft","pending","trash"],"required":false},"cms_tpv_search":{"type":"string","default":"","required":false},"filter":{"type":"string","default":"","enum":["","all","mine","publish","draft","pending","trash"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/cms-tpv\/v1\/tree"}]}},"\/cms-tpv\/v1\/counts":{"namespace":"cms-tpv\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"cms_tpv_post_type":{"type":"string","default":"page","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/cms-tpv\/v1\/counts"}]}},"\/cms-tpv\/v1\/page\/(?P<id>[\\d]+)":{"namespace":"cms-tpv\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/cms-tpv\/v1\/move":{"namespace":"cms-tpv\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","required":true},"refId":{"type":"integer","required":true},"type":{"type":"string","enum":["before","after","inside"],"required":true},"postType":{"type":"string","default":"","required":false},"view":{"type":"string","default":"all","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/cms-tpv\/v1\/move"}]}},"\/cms-tpv\/v1\/pages":{"namespace":"cms-tpv\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"names":{"type":"array","items":{"type":"string"},"required":true},"position":{"type":"string","enum":["after","inside"],"required":true},"status":{"type":"string","default":"draft","enum":["draft","pending","publish","published"],"required":false},"refId":{"type":"integer","default":0,"required":false},"postType":{"type":"string","default":"","required":false},"view":{"type":"string","default":"all","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/cms-tpv\/v1\/pages"}]}},"\/cms-tpv\/v1\/trash":{"namespace":"cms-tpv\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/cms-tpv\/v1\/trash"}]}},"\/cms-tpv\/v1\/activity":{"namespace":"cms-tpv\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"cms_tpv_post_type":{"type":"string","default":"page","required":false},"post":{"type":"integer","default":0,"required":false},"per_page":{"type":"integer","default":8,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/cms-tpv\/v1\/activity"}]}},"\/indexnow\/v_1.0.4":{"namespace":"indexnow\/v_1.0.4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"indexnow\/v_1.0.4","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4"}]}},"\/indexnow\/v_1.0.4\/apiKey":{"namespace":"indexnow\/v_1.0.4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/apiKey"}]}},"\/indexnow\/v_1.0.4\/apiSettings":{"namespace":"indexnow\/v_1.0.4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/apiSettings"}]}},"\/indexnow\/v_1.0.4\/automaticSubmission":{"namespace":"indexnow\/v_1.0.4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/automaticSubmission"}]}},"\/indexnow\/v_1.0.4\/submitUrl":{"namespace":"indexnow\/v_1.0.4","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/submitUrl"}]}},"\/indexnow\/v_1.0.4\/getStats":{"namespace":"indexnow\/v_1.0.4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/getStats"}]}},"\/indexnow\/v_1.0.4\/allSubmissions":{"namespace":"indexnow\/v_1.0.4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/allSubmissions"}]}},"\/indexnow\/v_1.0.4\/getIndexNowInsightsUrl":{"namespace":"indexnow\/v_1.0.4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/getIndexNowInsightsUrl"}]}},"\/indexnow\/v_1.0.4\/deleteSubmissions":{"namespace":"indexnow\/v_1.0.4","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/deleteSubmissions"}]}},"\/indexnow\/v_1.0.4\/excludedPaths":{"namespace":"indexnow\/v_1.0.4","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/indexnow\/v_1.0.4\/excludedPaths"}]}},"\/matomo\/v1":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"matomo\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1"}]}},"\/matomo\/v1\/hit":{"namespace":"matomo\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/hit"}]}},"\/matomo\/v1\/api\/processed_report":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/processed_report"}]}},"\/matomo\/v1\/api\/report_metadata":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/report_metadata"}]}},"\/matomo\/v1\/api\/matomo_version":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/matomo_version"}]}},"\/matomo\/v1\/api\/metadata":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/metadata"}]}},"\/matomo\/v1\/api\/segments_metadata":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/segments_metadata"}]}},"\/matomo\/v1\/api\/widget_metadata":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/widget_metadata"}]}},"\/matomo\/v1\/api\/row_evolution":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/row_evolution"}]}},"\/matomo\/v1\/api\/suggested_values_for_segment":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/suggested_values_for_segment"}]}},"\/matomo\/v1\/api\/settings":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/api\/settings"}]}},"\/matomo\/v1\/annotations\/add":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/annotations\/add"}]}},"\/matomo\/v1\/annotations\/all":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/annotations\/all"}]}},"\/matomo\/v1\/core_admin_home\/invalidate_archived_reports":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/core_admin_home\/invalidate_archived_reports"}]}},"\/matomo\/v1\/core_admin_home\/run_scheduled_tasks":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/core_admin_home\/run_scheduled_tasks"}]}},"\/matomo\/v1\/core_admin_home\/run_cron_archiving":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/core_admin_home\/run_cron_archiving"}]}},"\/matomo\/v1\/dashboard\/dashboards":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/dashboard\/dashboards"}]}},"\/matomo\/v1\/image_graph\/get":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/image_graph\/get"}]}},"\/matomo\/v1\/visits_summary\/visits":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/visits_summary\/visits"}]}},"\/matomo\/v1\/visits_summary\/unique_visitors":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/visits_summary\/unique_visitors"}]}},"\/matomo\/v1\/languages_manager\/available_languages":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/languages_manager\/available_languages"}]}},"\/matomo\/v1\/languages_manager\/available_languages_info":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/languages_manager\/available_languages_info"}]}},"\/matomo\/v1\/languages_manager\/available_language_names":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/languages_manager\/available_language_names"}]}},"\/matomo\/v1\/languages_manager\/language_for_user":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/languages_manager\/language_for_user"}]}},"\/matomo\/v1\/live\/counters":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/live\/counters"}]}},"\/matomo\/v1\/live\/last_visits_details":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/live\/last_visits_details"}]}},"\/matomo\/v1\/live\/visitor_profile":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/live\/visitor_profile"}]}},"\/matomo\/v1\/live\/most_recent_visitor_id":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/live\/most_recent_visitor_id"}]}},"\/matomo\/v1\/privacy_manager\/data_subjects":{"namespace":"matomo\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/privacy_manager\/data_subjects"}]}},"\/matomo\/v1\/privacy_manager\/export_data_subjects":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/privacy_manager\/export_data_subjects"}]}},"\/matomo\/v1\/privacy_manager\/anonymize_some_raw_data":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/privacy_manager\/anonymize_some_raw_data"}]}},"\/matomo\/v1\/scheduled_reports\/reports":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/scheduled_reports\/reports"}]}},"\/matomo\/v1\/scheduled_reports\/send_report":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/scheduled_reports\/send_report"}]}},"\/matomo\/v1\/segment_editor\/add":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/segment_editor\/add"}]}},"\/matomo\/v1\/segment_editor\/update":{"namespace":"matomo\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/segment_editor\/update"}]}},"\/matomo\/v1\/segment_editor\/delete":{"namespace":"matomo\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/segment_editor\/delete"}]}},"\/matomo\/v1\/segment_editor\/get":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/segment_editor\/get"}]}},"\/matomo\/v1\/segment_editor\/all":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/segment_editor\/all"}]}},"\/matomo\/v1\/sites_manager\/all_sites":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/sites_manager\/all_sites"}]}},"\/matomo\/v1\/sites_manager\/all_sites_id":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/sites_manager\/all_sites_id"}]}},"\/matomo\/v1\/sites_manager\/sites_id_with_at_least_view_access":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/sites_manager\/sites_id_with_at_least_view_access"}]}},"\/matomo\/v1\/users_manager\/users":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/users_manager\/users"}]}},"\/matomo\/v1\/users_manager\/users_login":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/users_manager\/users_login"}]}},"\/matomo\/v1\/users_manager\/user":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/users_manager\/user"}]}},"\/matomo\/v1\/goals\/goals":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/goals\/goals"}]}},"\/matomo\/v1\/visits_summary\/get":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/visits_summary\/get"}]}},"\/matomo\/v1\/goals\/goal":{"namespace":"matomo\/v1","methods":["GET","POST","PUT","DELETE"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/goals\/goal"}]}},"\/matomo\/v1\/tag_manager\/container_tags":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_tags"}]}},"\/matomo\/v1\/tag_manager\/container_tag":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_tag"}]}},"\/matomo\/v1\/tag_manager\/container_triggers":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_triggers"}]}},"\/matomo\/v1\/tag_manager\/container_trigger":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_trigger"}]}},"\/matomo\/v1\/tag_manager\/container_variables":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_variables"}]}},"\/matomo\/v1\/tag_manager\/container_variable":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_variable"}]}},"\/matomo\/v1\/tag_manager\/container":{"namespace":"matomo\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container"}]}},"\/matomo\/v1\/tag_manager\/containers":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/containers"}]}},"\/matomo\/v1\/tag_manager\/container_versions":{"namespace":"matomo\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_versions"}]}},"\/matomo\/v1\/tag_manager\/container_version":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/container_version"}]}},"\/matomo\/v1\/tag_manager\/publish_container_version":{"namespace":"matomo\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/matomo\/v1\/tag_manager\/publish_container_version"}]}},"\/members\/v1":{"namespace":"members\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"members\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/members\/v1"}]}},"\/members\/v1\/content-permissions\/(?P<id>\\d+)":{"namespace":"members\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"integer","required":true},"roles":{"type":"array","items":{"type":"string"},"required":true},"message":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/members\/v1\/ai":{"namespace":"members\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"read_only":{"type":"boolean","required":false},"disabled":{"type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/members\/v1\/ai"}]}},"\/members\/v1\/ai\/log":{"namespace":"members\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"type":"integer","minimum":1,"default":1,"required":false},"changes_only":{"type":"boolean","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/members\/v1\/ai\/log"}]}},"\/members\/v1\/ai\/app-password":{"namespace":"members\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/members\/v1\/ai\/app-password"}]}},"\/members\/v1\/ai\/adapter":{"namespace":"members\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/members\/v1\/ai\/adapter"}]}},"\/real-media-library\/v1":{"namespace":"real-media-library\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"real-media-library\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/real-media-library\/v1"}]}},"\/real-media-library\/v1\/plugin":{"namespace":"real-media-library\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/real-media-library\/v1\/plugin"}]}},"\/real-product-manager-wp-client\/v1":{"namespace":"real-product-manager-wp-client\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"real-product-manager-wp-client\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/real-product-manager-wp-client\/v1"}]}},"\/real-product-manager-wp-client\/v1\/plugin-update\/(?P<slug>[a-zA-Z0-9_-]+)":{"namespace":"real-product-manager-wp-client\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["PATCH"],"args":{"licenses":{"type":"string","required":false},"terms":{"type":"boolean","required":true},"autoUpdates":{"type":"boolean","default":true,"required":false},"telemetry":{"type":"boolean","default":false,"required":false},"newsletter":{"type":"boolean","default":false,"required":false},"firstName":{"type":"string","required":false},"email":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/plugin-update\/(?P<slug>[a-zA-Z0-9_-]+)\/skip":{"namespace":"real-product-manager-wp-client\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/plugin-update\/(?P<slug>[a-zA-Z0-9_-]+)\/license\/(?P<blogId>[0-9_-]+)":{"namespace":"real-product-manager-wp-client\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/plugin-update\/(?P<slug>[a-zA-Z0-9_-]+)\/license\/(?P<blogId>[0-9_-]+)\/retry":{"namespace":"real-product-manager-wp-client\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/plugin-update\/(?P<slug>[a-zA-Z0-9_-]+)\/license\/(?P<blogId>[0-9_-]+)\/client-uuid":{"namespace":"real-product-manager-wp-client\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/plugin-update\/(?P<slug>[a-zA-Z0-9_-]+)\/telemetry\/(?P<blogId>[0-9_-]+)":{"namespace":"real-product-manager-wp-client\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/plugin-update\/(?P<slug>[a-zA-Z0-9_-]+)\/license-notice":{"namespace":"real-product-manager-wp-client\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/announcement\/(?P<slug>[a-zA-Z0-9_-]+)\/active":{"namespace":"real-product-manager-wp-client\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"state":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/announcement\/(?P<slug>[a-zA-Z0-9_-]+)\/(?P<id>[0-9_-]+)\/view":{"namespace":"real-product-manager-wp-client\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-product-manager-wp-client\/v1\/feedback\/(?P<slug>[a-zA-Z0-9_-]+)":{"namespace":"real-product-manager-wp-client\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"skip":{"type":"boolean","default":false,"required":false},"reason":{"type":"string","required":true},"note":{"type":"string","default":"","required":false},"email":{"type":"string","default":"","required":false},"name":{"type":"string","default":"","required":false},"deactivateLicense":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-utils\/v1":{"namespace":"real-utils\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"real-utils\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/real-utils\/v1"}]}},"\/real-utils\/v1\/feedback\/(?P<slug>[a-zA-Z0-9_-]+)":{"namespace":"real-utils\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"reason":{"type":"string","required":true},"note":{"type":"string","required":true},"email":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/real-utils\/v1\/rating\/(?P<slug>[a-zA-Z0-9_-]+)\/dismiss":{"namespace":"real-utils\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/safe-svg\/v1":{"namespace":"safe-svg\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"safe-svg\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/safe-svg\/v1"}]}},"\/safe-svg\/v1\/svg\/(?P<id>\\d+)":{"namespace":"safe-svg\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"type":"integer","minimum":1,"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wordfence-login-security\/v1":{"namespace":"wordfence-login-security\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wordfence-login-security\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence-login-security\/v1"}]}},"\/wordfence-login-security\/v1\/internal\/passkey-login\/begin":{"namespace":"wordfence-login-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence-login-security\/v1\/internal\/passkey-login\/begin"}]}},"\/wordfence-login-security\/v1\/internal\/passkey-login\/finish":{"namespace":"wordfence-login-security\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence-login-security\/v1\/internal\/passkey-login\/finish"}]}},"\/wordfence\/v1":{"namespace":"wordfence\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wordfence\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence\/v1"}]}},"\/wordfence\/v1\/authenticate":{"namespace":"wordfence\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence\/v1\/authenticate"}]}},"\/wordfence\/v1\/config":{"namespace":"wordfence\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence\/v1\/config"}]}},"\/wordfence\/v1\/disconnect":{"namespace":"wordfence\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence\/v1\/disconnect"}]}},"\/wordfence\/v1\/scan\/issues":{"namespace":"wordfence\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence\/v1\/scan\/issues"}]}},"\/wordfence\/v1\/scan":{"namespace":"wordfence\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence\/v1\/scan"}]}},"\/wordfence\/v1\/scan\/issue":{"namespace":"wordfence\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wordfence\/v1\/scan\/issue"}]}},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/bulk_editor\/posts_content":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ids":{"type":"array","minItems":1,"maxItems":20,"items":{"type":"integer","minimum":1},"description":"The IDs of the posts to return the content of. Accepts a comma separated list.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/posts_content"}]}},"\/yoast\/v1\/bulk_editor\/posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"content_type":{"type":"string","description":"The content type to fetch posts for.","required":true},"per_page":{"type":"integer","default":20,"minimum":1,"maximum":100,"description":"The number of posts to fetch.","required":false},"page":{"type":"integer","default":1,"minimum":1,"description":"The page of posts to fetch.","required":false},"search":{"type":"string","default":"","description":"The term to search posts by.","required":false},"status":{"type":"array","default":["publish","draft","pending","future"],"items":{"type":"string","enum":["publish","draft","pending","future"]},"description":"The post statuses to include.","required":false},"needs_improvement":{"type":"array","default":[],"items":{"type":"string","enum":["seo_title","meta_description","social_title","social_description"]},"description":"The fields to filter posts by; a field matches when it is empty, or (for search fields, while SEO analysis is enabled and the content type shows Yoast's controls and assessments) when its score needs improvement.","required":false},"include":{"type":"array","default":[],"maxItems":100,"items":{"type":"integer","minimum":1},"description":"Limits the posts to these post IDs, e.g. a selection carried over from the posts overview.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/posts"}]}},"\/yoast\/v1\/bulk_editor\/update_scores":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post score updates to apply.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/update_scores"}]}},"\/yoast\/v1\/bulk_editor\/update_search":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post updates to apply.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/update_search"}]}},"\/yoast\/v1\/bulk_editor\/update_social":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post updates to apply.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/bulk_editor\/update_social"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/site_kit_configuration_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/site_kit_configuration_permanent_dismissal"}]}},"\/yoast\/v1\/readability_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/readability_scores"}]}},"\/yoast\/v1\/seo_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/seo_scores"}]}},"\/yoast\/v1\/setup_steps_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"setup_widget_loaded":{"type":"string","enum":["yes","no"],"required":false},"first_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"last_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"setup_widget_temporarily_dismissed":{"type":"string","enum":["yes","no"],"required":false},"setup_widget_permanently_dismissed":{"type":"string","enum":["yes","no"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/setup_steps_tracking"}]}},"\/yoast\/v1\/introductions\/(?P<introduction_id>[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/available_posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","default":"","required":false},"postType":{"type":"string","default":"page","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/available_posts"}]}},"\/yoast\/v1\/myyoast\/status":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/myyoast\/status"}]}},"\/yoast\/v1\/myyoast\/refresh-status":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/myyoast\/refresh-status"}]}},"\/yoast\/v1\/myyoast\/register":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/myyoast\/register"}]}},"\/yoast\/v1\/myyoast\/registration":{"namespace":"yoast\/v1","methods":["PUT","DELETE"],"endpoints":[{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/myyoast\/registration"}]}},"\/yoast\/v1\/myyoast\/authorize":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"return_url":{"type":"string","description":"URL to send the browser back to once the flow completes. Validated against the site host; an invalid or off-site URL is ignored.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/myyoast\/authorize"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P<plugin>[\\w-]+)\/(?P<type>[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/semrush\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/semrush\/authenticate"}]}},"\/yoast\/v1\/semrush\/country_code":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"country_code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/semrush\/country_code"}]}},"\/yoast\/v1\/semrush\/related_keyphrases":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"keyphrase":{"required":true},"country_code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/semrush\/related_keyphrases"}]}},"\/yoast\/v1\/wincher\/authorization-url":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wincher\/authorization-url"}]}},"\/yoast\/v1\/wincher\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"websiteId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wincher\/authenticate"}]}},"\/yoast\/v1\/wincher\/keyphrases\/track":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wincher\/keyphrases\/track"}]}},"\/yoast\/v1\/wincher\/keyphrases":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":false},"permalink":{"required":false},"startAt":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wincher\/keyphrases"}]}},"\/yoast\/v1\/wincher\/keyphrases\/untrack":{"namespace":"yoast\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wincher\/keyphrases\/untrack"}]}},"\/yoast\/v1\/wincher\/account\/limit":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wincher\/account\/limit"}]}},"\/yoast\/v1\/wincher\/account\/upgrade-campaign":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/wincher\/account\/upgrade-campaign"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/workouts"}]}},"\/yoast\/v1\/complete_task":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"options":{"type":"object","properties":{"task":{"type":"string","required":true,"sanitize_callback":"sanitize_text_field"}},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/complete_task"}]}},"\/yoast\/v1\/get_tasks":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"options":{"type":"object","properties":{"filter":{"type":"string","required":false,"sanitize_callback":"sanitize_text_field"},"limit":{"type":"int","required":false,"sanitize_callback":"absint"}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/get_tasks"}]}},"\/yoast\/v1\/action_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/yoast\/v1\/action_tracking"}]}},"\/wp-all-import\/v1":{"namespace":"wp-all-import\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-all-import\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-all-import\/v1"}]}},"\/wp-all-import\/v1\/addon\/fields":{"namespace":"wp-all-import\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-all-import\/v1\/addon\/fields"}]}},"\/wpml\/st\/v1":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/st\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1"}]}},"\/wpml\/st\/v1\/strings\/settings":{"namespace":"wpml\/st\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"autoregisterType":{"type":"integer","default":0,"required":false},"shouldRegisterBackendStrings":{"type":"integer","default":0,"required":false},"setNoticeThatCachePluginCanBlockAutoregisterAsDismissed":{"type":"integer","default":0,"required":false},"setDetectStringsInJS":{"type":"integer","default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/strings\/settings"}]}},"\/wpml\/st\/v1\/strings\/itemscount":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/strings\/itemscount"}]}},"\/wpml\/st\/v1\/strings":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/strings"}]}},"\/wpml\/st\/v1\/strings\/filters":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/strings\/filters"}]}},"\/wpml\/st\/v1\/string-packages":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/string-packages"}]}},"\/wpml\/st\/v1\/strings\/processstringsqueue":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/strings\/processstringsqueue"}]}},"\/wpml\/tm\/v1":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/tm\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1"}]}},"\/wpml\/tm\/v1\/release-notice":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_id":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/release-notice"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/store":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_job_id":{"type":"string","required":true},"ate_job_data":{"type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/store"}]}},"\/wpml\/tm\/v1\/xliff\/fetch\/(?P<jobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wpml\/tm\/v1\/ams\/register_manager":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ams\/register_manager"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/translators":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/translators"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/managers":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/managers"}]}},"\/wpml\/tm\/v1\/ams\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ams\/status"}]}},"\/wpml\/tm\/v1\/ams\/console":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ams\/console"}]}},"\/wpml\/tm\/v1\/ams\/engines":{"namespace":"wpml\/tm\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ams\/engines"}]}},"\/wpml\/tm\/v1\/ate\/jobs":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wpml\/tm\/v1\/jobs":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"local_job_ids":{"type":"string","required":false},"scope":{"type":"string","required":false},"id":{"type":"integer","required":false},"job_id":{"type":"integer","required":false},"title":{"type":"string","required":false},"source_language":{"type":"string","required":false},"target_language":{"type":"string","required":false},"status":{"type":"string","required":false},"needs_update":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"sorting":{"required":false},"translated_by":{"type":"string","required":false},"sent_from":{"type":"string","required":false},"sent_to":{"type":"string","required":false},"deadline_from":{"type":"string","required":false},"deadline_to":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/jobs"}]}},"\/wpml\/tm\/v1\/jobs\/assign":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"jobId":{"required":true},"type":{"required":false},"translatorId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/jobs\/assign"}]}},"\/wpml\/tm\/v1\/jobs\/cancel":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/jobs\/cancel"}]}},"\/wpml\/tm\/v1\/jobs\/in-flight-charged":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/jobs\/in-flight-charged"}]}},"\/wpml\/tm\/v1\/tp\/xliff\/download\/(?P<job_id>\\d+)\/(?P<job_type>\\w+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"job_id":{"required":true},"job_type":{"required":true},"json":{"type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wpml\/tm\/v1\/tp\/apply-translations":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/tp\/apply-translations"}]}},"\/wpml\/tm\/v1\/tp\/batches\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/tp\/batches\/sync"}]}},"\/wpml\/tm\/v1\/tp\/batches\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/tp\/batches\/status"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"lockKey":{"type":"string","required":false},"ateToken":{"type":"string","required":false},"page":{"type":"int","required":false},"numberOfPages":{"type":"int","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/sync"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/download":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/download"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/retry":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/retry"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/receive\/(?P<wpmlJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpmlJobId":{"type":"int","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wpml\/tm\/v1\/ate\/jobs\/public\/create":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"site_identifier":{"type":"string","required":true},"check":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/public\/create"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)\/fix":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wpml\/tm\/v1\/ate\/pull\/collect":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/pull\/collect"}]}},"\/wpml\/tm\/v1\/ate\/pull\/ping":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tabId":{"type":"string","required":false},"force":{"type":"boolean","default":false,"required":false},"wake":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/tm\/v1\/ate\/pull\/ping"}]}},"\/wpml\/ate\/v1":{"namespace":"wpml\/ate\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/ate\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/ate\/v1"}]}},"\/wpml\/ate\/v1\/ate\/proxy":{"namespace":"wpml\/ate\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/ate\/v1\/ate\/proxy"}]}},"\/wpml\/st\/v1\/import_mo_strings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"plugins":{"type":"array","required":false},"themes":{"type":"array","required":false},"other":{"type":"array","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/import_mo_strings"}]}},"\/wpml\/st\/v1\/pre_generate_mo_files":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/pre_generate_mo_files"}]}},"\/wpml\/st\/v1\/settings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"group":{"required":true},"key":{"required":true},"data":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/st\/v1\/settings"}]}},"\/wpml\/v1\/updates":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/updates"}]}},"\/wpml\/v1\/item-sections\/populated":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/item-sections\/populated"}]}},"\/wpml\/v1\/posts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/posts"}]}},"\/wpml\/v1\/posts\/count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/posts\/count"}]}},"\/wpml\/v1\/send-to-translation\/validate-translation-options":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchName":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/send-to-translation\/validate-translation-options"}]}},"\/wpml\/v1\/send-to-translation\/default-batch-name":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/send-to-translation\/default-batch-name"}]}},"\/wpml\/v1\/send-to-translation\/validate-batch-name":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchName":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/send-to-translation\/validate-batch-name"}]}},"\/wpml\/v1\/set-review-translation-option":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"reviewOption":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/set-review-translation-option"}]}},"\/wpml\/v1\/posts\/hierarchical":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"search":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/posts\/hierarchical"}]}},"\/wpml\/v1\/posts\/taxonomies":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"sourceLanguageCode":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/posts\/taxonomies"}]}},"\/wpml\/v1\/posts\/terms":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomyId":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"search":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/posts\/terms"}]}},"\/wpml\/v1\/translate-everything\/enable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/translate-everything\/enable"}]}},"\/wpml\/v1\/translate-everything\/disable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/translate-everything\/disable"}]}},"\/wpml\/v1\/translate-everything\/recheck-reachability":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/translate-everything\/recheck-reachability"}]}},"\/wpml\/v1\/cancelallautomaticjobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/cancelallautomaticjobs"}]}},"\/wpml\/v1\/getautomaticjobsinprogress":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/getautomaticjobsinprogress"}]}},"\/wpml\/v1\/getuntranslatedtypescount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/getuntranslatedtypescount"}]}},"\/wpml\/v1\/save-translator-note":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/save-translator-note"}]}},"\/wpml\/v1\/translation-proxy\/commit-batch":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/translation-proxy\/commit-batch"}]}},"\/wpml\/v1\/tranlsation-proxy\/getlastpickedup":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tranlsation-proxy\/getlastpickedup"}]}},"\/wpml\/v1\/translation-proxy\/getRemoteJobsCount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/translation-proxy\/getRemoteJobsCount"}]}},"\/wpml\/v1\/gettranslationstatus":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/gettranslationstatus"}]}},"\/wpml\/v1\/getlocaltranslatorbyid":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"translatorId":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/getlocaltranslatorbyid"}]}},"\/wpml\/v1\/reloadremotetranslationservice":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/reloadremotetranslationservice"}]}},"\/wpml\/v1\/gettranslationeditortype":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/gettranslationeditortype"}]}},"\/wpml\/v1\/translate-existing-content":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/translate-existing-content"}]}},"\/wpml\/v1\/get-needs-update-count-created-in-cte":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-needs-update-count-created-in-cte"}]}},"\/wpml\/v1\/get-engines":{"namespace":"wpml\/v1","methods":["GET","GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-engines"}]}},"\/wpml\/v1\/website-contexts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/website-contexts"}]}},"\/wpml\/v1\/has-posts-using-native-editor":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/has-posts-using-native-editor"}]}},"\/wpml\/v1\/get-credits-per-word":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-credits-per-word"}]}},"\/wpml\/v1\/get-words-to-translate-for-items":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-words-to-translate-for-items"}]}},"\/wpml\/v1\/get-words-to-translate-for-types":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-words-to-translate-for-types"}]}},"\/wpml\/v1\/save-automatic-translation-settings":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/save-automatic-translation-settings"}]}},"\/wpml\/v1\/support\/plugin-report":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/support\/plugin-report"}]}},"\/wpml\/v1\/support\/activate-repair-tools":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/support\/activate-repair-tools"}]}},"\/wpml\/v1\/troubleshooting\/posthog":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/troubleshooting\/posthog"}]}},"\/wpml\/v1\/troubleshooting\/remote-xml-config-log\/clear":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/troubleshooting\/remote-xml-config-log\/clear"}]}},"\/wpml\/v1\/support\/enable-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/support\/enable-alias-domain"}]}},"\/wpml\/v1\/support\/register-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/support\/register-alias-domain"}]}},"\/wpml\/v1\/support\/reset-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/support\/reset-alias-domain"}]}},"\/wpml\/v1\/tea-calculation-types":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tea-calculation-types"}]}},"\/wpml\/v1\/tea-calculation-update-types-include":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tea-calculation-update-types-include"}]}},"\/wpml\/v1\/tea-calculation-update-types-include-batch":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tea-calculation-update-types-include-batch"}]}},"\/wpml\/v1\/tea-calculation-discard-pending-offer":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tea-calculation-discard-pending-offer"}]}},"\/wpml\/v1\/tea-calculation-dismiss-parked-offer":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tea-calculation-dismiss-parked-offer"}]}},"\/wpml\/v1\/tea-calculation-persist-offered-defaults":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tea-calculation-persist-offered-defaults"}]}},"\/wpml\/v1\/tea-calculation-items":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/tea-calculation-items"}]}},"\/wpml\/v1\/get-eatewidget-data":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-eatewidget-data"}]}},"\/wpml\/v1\/get-migration-code":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-migration-code"}]}},"\/wpml\/v1\/account-balances":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/account-balances"}]}},"\/wpml\/v1\/credits":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/credits"}]}},"\/wpml\/v1\/getlocaltranslators":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/getlocaltranslators"}]}},"\/wpml\/v1\/glossary-count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/glossary-count"}]}},"\/wpml\/v1\/normalized-suggestions-count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/normalized-suggestions-count"}]}},"\/wpml\/v1\/dismiss-queued-retranslation-reminder":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/dismiss-queued-retranslation-reminder"}]}},"\/wpml\/v1\/dismiss-pending-suggestions-nudge":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/dismiss-pending-suggestions-nudge"}]}},"\/wpml\/v1\/enable-ate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/enable-ate"}]}},"\/wpml\/v1\/get-dismissed-notices":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/get-dismissed-notices"}]}},"\/wpml\/v1\/minimum-requirements":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/minimum-requirements"}]}},"\/wpml\/v1\/rest\/status":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/rest\/status"}]}},"\/wpml\/v1\/posthog\/refresh-cache":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/posthog\/refresh-cache"}]}},"\/wpml\/v1\/dismiss-notice":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/dismiss-notice"}]}},"\/wpml\/v1\/dismiss-notice-per-user":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/dismiss-notice-per-user"}]}},"\/wpml\/v1\/cancel-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/cancel-jobs"}]}},"\/wpml\/v1\/unsolvable-jobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/unsolvable-jobs"}]}},"\/wpml\/v1\/resend-unsolvable-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/resend-unsolvable-jobs"}]}},"\/wpml\/v1\/wpml\/posthog\/capture-event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/wpml\/posthog\/capture-event"}]}},"\/wpml\/v1\/capture\/event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/capture\/event"}]}},"\/wpml\/v1\/wpml-proxy\/status":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/wpml-proxy\/status"}]}},"\/wpml\/v1\/wpml-content-stats":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/wpml-content-stats"}]}},"\/wpml\/v1\/wpml-ph-make-external-request":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/wpml-ph-make-external-request"}]}},"\/wpml\/v1\/posthog\/dashboard-session":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wpml\/v1\/posthog\/dashboard-session"}]}},"\/duplicate-post\/v1":{"namespace":"duplicate-post\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"duplicate-post\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/duplicate-post\/v1"}]}},"\/duplicate-post\/v1\/original\/(?P<post_id>\\d+)":{"namespace":"duplicate-post\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"post_id":{"description":"The ID of the post to remove the original reference from.","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/if-menu\/v1":{"namespace":"if-menu\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"if-menu\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/if-menu\/v1"}]}},"\/if-menu\/v1\/did-you-made-this-request":{"namespace":"if-menu\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/if-menu\/v1\/did-you-made-this-request"}]}},"\/wp-mail-smtp\/v1":{"namespace":"wp-mail-smtp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-mail-smtp\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/v1"}]}},"\/wp-mail-smtp\/v1\/e\/(?P<data>.+)":{"namespace":"wp-mail-smtp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp-mail-smtp\/setup-wizard\/v1":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-mail-smtp\/setup-wizard\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/health":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/health"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/hydrate":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/hydrate"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/update":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/update"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/settings":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/settings"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/import-settings":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/import-settings"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-connected-data":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-connected-data"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-oauth-url":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-oauth-url"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/remove-oauth-connection":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/remove-oauth-connection"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/sendlayer-disconnect":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/sendlayer-disconnect"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/check-mailer-configuration":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/check-mailer-configuration"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/mailer-preflight":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/mailer-preflight"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/install-plugin":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/install-plugin"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/upgrade-plugin":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/upgrade-plugin"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-partner-plugins-info":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-partner-plugins-info"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-amazon-ses-identities":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-amazon-ses-identities"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/amazon-ses-identity-registration":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/amazon-ses-identity-registration"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/verify-license-key":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/verify-license-key"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/refresh-license-key":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/refresh-license-key"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/remove-license-key":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/remove-license-key"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/remove-gmail-one-click-setup-oauth-connection":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/remove-gmail-one-click-setup-oauth-connection"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/remove-outlook-one-click-setup-oauth-connection":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/remove-outlook-one-click-setup-oauth-connection"}]}},"\/llar\/v1":{"namespace":"llar\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"llar\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/llar\/v1"}]}},"\/llar\/v1\/mfa\/send-code":{"namespace":"llar\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","required":true},"secret":{"type":"string","required":true},"code":{"type":"string","required":false},"ip":{"type":"string","required":false},"browser":{"type":"string","required":false},"location":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/llar\/v1\/mfa\/send-code"}]}},"\/realmedialibrary\/v1":{"namespace":"realmedialibrary\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"realmedialibrary\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1"}]}},"\/realmedialibrary\/v1\/tree":{"namespace":"realmedialibrary\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/tree"}]}},"\/realmedialibrary\/v1\/tree\/dropdown":{"namespace":"realmedialibrary\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/tree\/dropdown"}]}},"\/realmedialibrary\/v1\/hierarchy\/(?P<id>\\d+)":{"namespace":"realmedialibrary\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/realmedialibrary\/v1\/usersettings":{"namespace":"realmedialibrary\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/usersettings"}]}},"\/realmedialibrary\/v1\/folders\/content\/counts":{"namespace":"realmedialibrary\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/folders\/content\/counts"}]}},"\/realmedialibrary\/v1\/folders\/(?P<fid>\\d+)\/content\/sortables":{"namespace":"realmedialibrary\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/realmedialibrary\/v1\/folders\/(?P<fid>\\d+)\/sortables":{"namespace":"realmedialibrary\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/realmedialibrary\/v1\/folders\/(?P<id>\\d+)\/meta":{"namespace":"realmedialibrary\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/realmedialibrary\/v1\/folders\/(?P<id>\\d+)":{"namespace":"realmedialibrary\/v1","methods":["PUT","DELETE"],"endpoints":[{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/realmedialibrary\/v1\/folders":{"namespace":"realmedialibrary\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/folders"}]}},"\/realmedialibrary\/v1\/attachments\/(?P<id>\\d+)":{"namespace":"realmedialibrary\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/realmedialibrary\/v1\/attachments\/(?P<id>\\d+)\/shortcutInfo":{"namespace":"realmedialibrary\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/realmedialibrary\/v1\/attachments\/bulk\/move":{"namespace":"realmedialibrary\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/attachments\/bulk\/move"}]}},"\/realmedialibrary\/v1\/reset\/order":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/reset\/order"}]}},"\/realmedialibrary\/v1\/reset\/count":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/reset\/count"}]}},"\/realmedialibrary\/v1\/reset\/slugs":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/reset\/slugs"}]}},"\/realmedialibrary\/v1\/reset\/relations":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/reset\/relations"}]}},"\/realmedialibrary\/v1\/reset\/folders":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/reset\/folders"}]}},"\/realmedialibrary\/v1\/export":{"namespace":"realmedialibrary\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/export"}]}},"\/realmedialibrary\/v1\/import":{"namespace":"realmedialibrary\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/import"}]}},"\/realmedialibrary\/v1\/import\/taxonomy":{"namespace":"realmedialibrary\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/import\/taxonomy"}]}},"\/realmedialibrary\/v1\/import\/mlf":{"namespace":"realmedialibrary\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/import\/mlf"}]}},"\/realmedialibrary\/v1\/import\/filebird":{"namespace":"realmedialibrary\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/import\/filebird"}]}},"\/realmedialibrary\/v1\/reset\/debug":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/reset\/debug"}]}},"\/realmedialibrary\/v1\/notice\/lite":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/notice\/lite"}]}},"\/realmedialibrary\/v1\/notice\/import":{"namespace":"realmedialibrary\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/realmedialibrary\/v1\/notice\/import"}]}},"\/otgs\/installer\/v1":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"otgs\/installer\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/otgs\/installer\/v1"}]}},"\/otgs\/installer\/v1\/push\/fetch-subscription":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/otgs\/installer\/v1\/push\/fetch-subscription"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rml"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"rml_folder":{"description":"Fetch only media in a folder by folder id.","type":"integer","required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"generate_sub_sizes":{"type":"boolean","default":true,"description":"Whether to generate image sub sizes.","required":false},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false},"url":{"type":"string","format":"uri","description":"URL of an external image to sideload into the media library, instead of uploading a file.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/sideload":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"image_size":{"description":"Image size. Can be a single size name or an array of size names to register the same file under multiple sizes.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"convert_format":{"type":"boolean","default":true,"description":"Whether to convert image formats.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/finalize":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"sub_sizes":{"description":"Array of sub-size metadata collected from sideload responses.","type":"array","default":[],"maxItems":100,"items":{"type":"object","properties":{"image_size":{"description":"Size name, or an array of size names when a single file is registered under multiple sizes with matching dimensions.","type":["string","array"],"items":{"type":"string","minLength":1},"minItems":1,"minLength":1,"required":true},"width":{"type":"integer","minimum":1},"height":{"type":"integer","minimum":1},"file":{"type":"string","minLength":1},"mime_type":{"type":"string","pattern":"^image\/.*"},"filesize":{"type":"integer","minimum":1},"original_image":{"type":"string","minLength":1}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_downloads":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_downloads"}]}},"\/wp\/v2\/ls_downloads\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_downloads\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_downloads\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_downloads\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_downloads\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_dealers":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_dealers"}]}},"\/wp\/v2\/ls_dealers\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_dealers\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_dealers\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_dealers\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_dealers\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_jobs":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ls_jobs_cat":{"description":"Limit result set to items with specific terms assigned in the ls_jobs_cat taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ls_jobs_cat_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ls_jobs_cat taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_jobs_cat":{"description":"The terms assigned to the post in the ls_jobs_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_jobs"}]}},"\/wp\/v2\/ls_jobs\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_jobs_cat":{"description":"The terms assigned to the post in the ls_jobs_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_jobs\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_jobs\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_jobs\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_jobs_cat":{"description":"The terms assigned to the post in the ls_jobs_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_jobs\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_events":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ls_events_cat":{"description":"Limit result set to items with specific terms assigned in the ls_events_cat taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ls_events_cat_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ls_events_cat taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_events_cat":{"description":"The terms assigned to the post in the ls_events_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_events"}]}},"\/wp\/v2\/ls_events\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_events_cat":{"description":"The terms assigned to the post in the ls_events_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_events\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_events\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_events\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_events_cat":{"description":"The terms assigned to the post in the ls_events_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_events\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_merchandise":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ls_merchandise_cat":{"description":"Limit result set to items with specific terms assigned in the ls_merchandise_cat taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ls_merchandise_cat_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ls_merchandise_cat taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_merchandise_cat":{"description":"The terms assigned to the post in the ls_merchandise_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_merchandise"}]}},"\/wp\/v2\/ls_merchandise\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_merchandise_cat":{"description":"The terms assigned to the post in the ls_merchandise_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_merchandise\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_merchandise\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_merchandise\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ls_merchandise_cat":{"description":"The terms assigned to the post in the ls_merchandise_cat taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_merchandise\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/wpb_gutenberg_param":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","dp-rewrite-republish","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/wpb_gutenberg_param"}]}},"\/wp\/v2\/wpb_gutenberg_param\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/wpb_gutenberg_param\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/wpb_gutenberg_param\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_jobs_cat":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_jobs_cat"}]}},"\/wp\/v2\/ls_jobs_cat\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_events_cat":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_events_cat"}]}},"\/wp\/v2\/ls_events_cat\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/ls_merchandise_cat":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/ls_merchandise_cat"}]}},"\/wp\/v2\/ls_merchandise_cat\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","ls_downloads":"ls_downloads","ls_dealers":"ls_dealers","ls_jobs":"ls_jobs","ls_events":"ls_events","ls_merchandise":"ls_merchandise","wpb_gutenberg_param":"wpb_gutenberg_param"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","de_DE"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","de_DE"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","de_DE"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","ls_downloads","ls_dealers","ls_jobs","ls_events","ls_merchandise","wpb_gutenberg_param","category","post_tag","ls_jobs_cat","ls_events_cat","ls_merchandise_cat","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false},"namespace":{"description":"Limit results to abilities in a specific namespace.","type":"string","required":false},"meta":{"description":"Limit results to abilities matching all of the given meta fields.","type":"object","properties":{"annotations":{"description":"Limit results to abilities matching the given behavioral annotations.","type":"object","properties":{"readonly":{"description":"Whether the ability does not modify its environment.","type":["boolean","null"]},"destructive":{"description":"Whether the ability may perform destructive updates to its environment.","type":["boolean","null"]},"idempotent":{"description":"Whether repeated calls with the same arguments have no additional effect.","type":["boolean","null"]}},"additionalProperties":true}},"additionalProperties":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/icons":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/icons"}]}},"\/wp\/v2\/icons\/(?P<collection>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"collection":{"description":"Limit results to icons belonging to the given collection slug.","type":"string","pattern":"^[a-z0-9]([a-z0-9_-]*[a-z0-9])?$","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/icons\/(?P<name>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?\/[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Icon name.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/icon-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/icon-collections"}]}},"\/wp\/v2\/icon-collections\/(?P<slug>[a-z0-9](?:[a-z0-9_-]*[a-z0-9])?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Icon collection slug.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}]},"\/wp\/v2\/view-config":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"description":"Entity kind.","type":"string","required":true},"name":{"description":"Entity name.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["en","de"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/view-config"}]}}},"site_logo":0,"site_icon":0,"site_icon_url":"","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}]}}