TANK CUTTER TC120

ENDLESS LONG CUT

 

    • Light but nevertheless strong
    • Extremely efficiently with small load-bearing devices
    • Ideally for use in building interior
    • Replaceable cutting tips
    • Performance independent of the load-bearing device
    • Large opening width for easy positioning
    • Ideally suited for cutting large metal profiles
    • 360° Rotary drive for exact positioning of the cutter

Steel tanks and plates up to 15 mm thickness can be reliable cut "cold" and safely with the newly developed machine-guided Darda Tank Cutter.  Increase your productivity and cut coated tanks even with residual content finally risk-free!