
STEEL SHEARS
GREATEST CUTTING FORCE WITH MINIMAL WEIGHT
-
- Light but nevertheless strong
- Extremely efficiently with small load-bearing devices
- Ideally for use in building interior
- Replaceable cutting tips
- Performance independent of the load-bearing device
- Large opening width for easy positioning
- Ideally suited for cutting large metal profiles
- 360° Rotary drive for exact positioning of the shear
High-quality materials and the special pressure-intensifier system bring a high cutting power to the Darda Steel Shear with smallest dead weight. They are therefore developed for small load-bearing devices, whereas heavier traditional shears would not work. Thanks to their large opening width they can cut large metal profiles, which other shears could not master.