STEEL SHEAR

GREATEST CUTTING FORCE WITH MINIMAL WEIGHT

    • Light but nevertheless strong
    • Extremely efficiently with small load-bearing devices
    • Ideally for use in building interior
    • Replaceable cutting tips
    • Performance independent of the load-bearing device
    • Large opening width for easy positioning
    • Ideally suited for cutting large metal profiles
    • 360° Rotary drive for exact positioning of the shear

High-quality materials and the special pressure-intensifier system bring a high cutting power to the Darda Steel Shear with smallest dead weight. They are therefore developed for small load-bearing devices, whereas heavier traditional shears would not work. Thanks to their large opening width they can cut large metal profiles, which other shears could not master.