CC520 - THE RELIABLE POWERHOUSE
(Discontinued Model)

Sets the highest standards in productivity!

    • Crushes concrete up to 54 cm (21 in)
    • Cuts reinforced steel up to Ø30 mm
    • Excellent performance
    • Only a small carrier required
    • Ideally suited for demolition in tight places
    • Hydraulic rotary unit as an option

     

    • A built-in booster makes the crusher independent of the carrier's working pressure
    • Specially wear resistant replaceable steel alloy crusher tips and cutter blades
    • Pivot for 360° rotation
  • OverviewOrder No.
    CC520 without support plate9033 0520 80
    Additional teeth set6520 0436 80
    Hydraulic rotary unit6700 0700 80
    Support plate Brokk 2608015 0260 80
    Support plate Lehnhoff MS038015 0070 80
    Support plate Lehnhoff MS088015 0030 80
    Support plate Verachtert CW058015 0077 80
    Support plate Verachtert CW108015 0078 80
    Support plate Verachtert CW30/408015 0220 80
    Support plate Oilquick OQ45-58015 0430 80
    Support base plate6560 0251 80