CC480 – The new generation!

Low-noise demolition at it’s best!

    • Excellent Performance, only a small carrier required
    • With a small load-bearing device it can be used inside
    • Crushes concrete up to 46 cm (18 in)
    • Up to 50 t crushing force
    • Cuts reinforcements up to Ø30 mm

     

    • A built-in Booster makes the crusher indipendent of the carrier's working pressure
    • Pivot for 360° Rotation
    • Specially wear resistant replaceable steel alloy crusher tips and cutter blades
    • Additional teeth as an option
  • OverviewOrder No.
    CC480 without support plate9033 0480 79
    Additional teeth set6520 0436 80
    Hydraulic rotary unit6420 0700 80
    Support plate Brokk 2008015 0480 80
    Support plate Lehnhoff MS088015 0426 80
    Support plate Verachtert CW058015 0212 80
    Support base plate8015 0420 00