CC440 - COMPACT AND POWERFUL

The powerful with minimal weight!

    • Excellent Performance, only a small carrier required
    • With a small load-bearing device it can be used inside
    • Crushes concrete up to 44 cm (17 in)
    • Up to 44 t crushing force
    • Cuts reinforcements up to Ø30 mm

     

    • A built-in Booster makes the crusher indipendent of the carrier's working pressure
    • Pivot for 360° Rotation
    • Specially wear resistant replaceable steel alloy crusher tips and cutter blades
    • Additional teeth as an option
  • OverviewOrder No.
    CC440 without support plate9033 0440 79
    Additional teeth set6420 0436 80
    Hydraulic rotary unit6420 0700 80
    Support plate Brokk 1708015 0420 80
    Support plate Lehnhoff MS038015 0421 80
    Support plate Verachtert CW058015 0076 80
    Support base plate8015 0420 00