
COMBI-SHEARS HCS8 J
WITH CONCRETE JAW - BREAKS THROUGH UP TO 15 CM THICK CONCRETE
-
Demolish
-
Eqipped with the Concrete jaw set the HCS8 J can:
- Crush concrete walls up to 15 cm (5.6 in) thick (depending on compression strength of the concrete)
- Big advantage for breaking, separating walls and front
- Reclamation concrete panels
Order No. | HCS8 |
Combi-Shear HCS8 J | 9014 0333 80 |
Universal shear set C | 6500 0720 82 |
Sickle blade set S | 6500 0726 82 |
Concrete jaw set J | 6500 0723 82 |
Brick jaw set B | 6500 0722 82 |
Hydraulic hose | Number of Combi-Shears | 10 m |
S1 | 1 | 8381 0504 02 |