
COMBI-SHEARS HCS8 C
WITH SHEAR SET - CUTTING AND EXPANDING
-
Cutting
Expanding
-
Eqipped with the Shear set the HCS8 C can cut:
- Metal pipes
- Water lines
- Metal framing
- Disconnect high-power cables
- Wood pices
- Sheet metal
- Steel and reinforcing rods up to Ø16 mm
With its tips the HCS8 C can:
- Separate radiators from the wall
- Rip out steel and wooden framing
- Separate or push-up previously split concrete pieces
- Separate countless other materials
Order No. | HCS8 |
Combi-Shear HCS8 C | 9014 0334 80 |
Universal shear set C | 6500 0720 82 |
Sickle blade set S | 6500 0726 82 |
Concrete jaw set J | 6500 0723 82 |
Brick jaw set B | 6500 0722 82 |
Hydraulic hose | Number of Combi-Shears | 10 m |
S1 | 1 | 8381 0504 02 |