Combi-Shear
HCS8 B

1
2
3
4

Combi-Shear
HCS8 B

1
Hydraulic hoses with burst protection

Robust multi-layer hoses reliably connect the Combi-Shear with the high-pressure hydraulic power unit, which delivers a system pressure of 50 MPa (500 bar).

2
Sensitive control valve (safety mechanism)

Due to the control valve integrated in the body of the unit, opening and closing and thus the complete working process can be controlled at any time.

3
Lightweight and robust for hard demolition

Components made of the highest quality aluminum and steel materials guarantee a very long service life even under the hardest conditions. Maintenance work is almost eliminated.

4
Quick-change inserts (4 versions)

Quick and easy exchange on site to the different inserts, always allows to obtain the best result depending on the source material and the requirement.

Combi-Shear
HCS8 B

1
2
3
4

Combi-Shear
HCS8 B

1
Hydraulic hoses with
burst protection

Robust multi-layer hoses reliably connect the Combi-Shear with the high-pressure hydraulic power unit, which delivers a system pressure of 50 MPa (500 bar).

2
Sensitive control valve
(safety mechanism)

Due to the control valve integrated in the body of the unit, opening and closing and thus the complete working process can be controlled at any time.

3
Lightweight and robust
for hard demolition

Components made of the highest quality aluminum and steel materials guarantee a very long service life even under the hardest conditions. Maintenance work is almost eliminated.

4
Quick-change inserts
(4 versions)

Quick and easy exchange on site to the different inserts, always allows to obtain the best result depending on the source material and the requirement.

Products  |  Combi-Shears  |  HCS8 B

Darda
Combi-Shears
make the
difference

Multifunctional

Inserts for other applications exchanged in minutes.

Nearly noiseless, low-vibration and low-dust

Use even in inhabited areas and closed areas.

Compact and lightweight

Only one person needed for transport and operation.

Economical

Three optional exchange inserts for a wide variety of applications.

32 cm masonry breaking

With 4.2 t crushing force controllable at any time.

45 cm spreading width

With 2.8 t spreading force and fold-out steel tips.

Specifications
HCS8 B

Breaking force
4.2 t
Jaw opening
320 mm
Jaw depth
105 mm
Weight
16 kg
Length
795 mm
Data sheet HCS8 B | PDF | 691 KB
Catalog | PDF | 17 MB

A complete
Combi-Shear
consists of three
components:

1. Hydraulic Combi-Shear

2. Hydraulic Power Unit

3. Hydraulic hose set (high and low pressure)

Brick Jaw –
32 cm masonry

handy and easy to break off

Combi-Shear
HCS8 B

The HCS8 B Brick Jaw can be used to break off masonry up to 32 cm thickness. It replaces the conventional sledgehammer and, thanks to its hydraulic operation, is much more effective and very easy to use. There are simply fold-out steel tips on the Brick Jaws. With them, the HCS8 B can also spread a wide variety of materials and, for example, break door and window frames out of the masonry.

The very powerful Combi-Shear work safely, quickly and productively. One person can easily handle the compact and lightweight device. The integrated control valve allows sensitive control and locking of closing and opening. The working process can be controlled at any time. It causes no dust, no vibrations and is extremely quiet. This means that it can also be used indoors without hesitation and does not interfere with ongoing operations.

Further
Models

News and
Stories

Job Report C12 – HCS8 – Underwater demolition Underwater demolition of concrete piles Read more
Job Report Rock- and Concrete Splitter C9 Tunneling Tunnel extension in a dam Read more
Job Report Rock and Concrete Splitter C12 – Concrete Pillars Cutting of concrete pillars in 5 minutes Read more
Job Report Rock and Concrete Splitter C12 – Wärmekraftwerk Demolition of a 2.5 m x 17.5 m long concrete machine bed Read more