COMBI-SHEARS HCS8 B

WITH BRICK JAW - BREAKES THROUGH UP TO 32 CM BRICK WALLS

  • Bitting

     

  • HCS8 B bit through up to 32 cm thick wall - every time

     

    • In situations where walls must be demolished without dust, noise or vibratiosn
    • When large machines cannot be used
    • When conventional methods such as the working with sledge hammers aren't possible
  • Expanding

     

  • The jaws are equipped with hinged steel tips. The HCS8 B tips can force apart a wide variety of materials up to 45 cm, for example separating door and window frames from concrete walls.

Order No.HCS8
Combi-Shear HCS8 B9014 0336 80
Universal shear set C6500 0720 82
Sickle blade set S6500 0726 82
Concrete jaw set J6500 0723 82
Brick jaw set B6500 0722 82
Hydraulic hoseNumber of Combi-Shears10 m
S118381 0504 02