Cutting,
breaking,
spreading

Hand-guided and hydraulic

Combi-Shears
HCS8

The handheld, hydraulic Combi-Shears HCS8 are equipped with well-proven cutter and gripper technology and are particularly suitable for the gutting and controlled deconstruction of buildings. They are also versatile in other applications. One person can easily handle the compact and lightweight devices.

The very powerful Combi-Shear work safely, quickly and productively. The integrated control valve allows sensitive control of closing and opening and can also be locked. The working process can be controlled at any time. They cause neither dust nor vibrations and are extremely quiet. This means that they can also be used indoors without hesitation, and ongoing operations are not disturbed.

The Solution for
Many Tasks

Concrete Jaw
HCS8 J

Demolition of up to 15 cm
thick concrete walls.

Brick Jaw
HCS8 B

Demolition of up to 32 cm
thick masonry.

Sickle Blade
HCS8 S

Cutting through, round materials
up to 16 mm diameter.

Shear and Spreader
HCS8 C

Radiators can be pressed from the wall, door frames can be broken out.

A Complete
System for
Different
Applications

1 – Concrete Jaw HCS8 J

2 – Brick Jaw HCS8 B

3 – Sickle Blade HCS8 S

4 – Shear and Spreader HCS8 C

Darda
Combi-Shears
Make the
Difference

Powerful and multifunctional

Versatile application possibilities.

Nearly noiseless, low vibration and dust

Use also in inhabited areas and closed areas.

Compact and lightweight

Only one person needed for transport and operation.

Economical and controlled

Working process can be controlled at all times.