THE MOST POWERFUL CRUSHER IN ITS WEIGHT CLASS
CC 700 – Muscle power in slim design!
- Crushes concrete up to 60 cm
- Cuts reinforced steel up to 28 mm
- A powerful lightweight – 70 t crushing force
- Excellent performance
- Only a small carrier required
- Ideally suited for demolition in tight places
- A built-in booster makes the crusher independent of the carrier's working pressure
- Specially wear resistant replaceable steel alloy crusher tips and cutter blades
- Pivot for 360° rotation
| Technical Data | |
| Recommended weight of carrier | 7 - 15 t |
| Pressure requirement | 175 bar - 270 bar |
| Oil flow | max. 150 l/min |
| Breaking power | 680 kN (70 t) |
| max. Opening width | 650 mm |
| Dead weight | approx. 600 kg |
| Cutting capacity | Reinforced steel to 28 mm |
Match the technical data to an appropriate load-bearing device!


